382 results
Project
SR 28 and SR 21 - in Odessa - Paving and Complete Streets
Timeline: Spring 2025 - Summer 2027
This project will rehabilitate both SR 21 and SR 28 within the city limits of Odessa in Lincoln County. The roadway is past its expected lifespan and due for replacement. Along with repaving the roadway, complete streets will be used to look at active transportation within the city limits.
Project
SR 282 Nat Washington Blvd - Safety Improvement
Timeline: June 2026-September-2026
This project will install a compact roundabout at the intersection of SR 282 and Nat Washington Way, to enhance safety and reduce collisions. Installing a roundabout has proven safer than the existing turns and safer than installing traffic signals.
Project
SR 290 - Spokane River East Trent Bridge - Complete July 2023
Timeline: June 2020 - July 2023
The East Trent Bridge spanning over the Spokane River near Gonzaga University campus is due for replacement. Crews will demolish and rebuild the structure which has stood since 1910.
Project
SR 3 - Chico Creek - Remove Fish Barriers - Completed November 2024
Timeline: September 2021 - November 2024
This project replaced several barriers to fish beneath SR 3 and its southbound on- and off-ramps. The project built new SR 3 bridges over Chico Creek, realigned the on- and off-ramps, built an elevated bridge on Chico Way NW and rerouted Chico Creek beneath SR 3.
Project
SR 3 - Freight Corridor - New Alignment
Timeline: 2027 - 2029
Crews will create a new route for SR 3 while maintaining the existing state highway through Belfair as a business loop. The proposed 6-miles of new highway would provide a new option for drivers to travel around and not through Belfair. The new portion of SR 3 is a Limited Access Corridor. A…
Project
SR 3, SR 16 and SR 166, Gorst Vicinity - Remove Fish Barriers
Timeline: 2026 - 2029
This project will remove barriers to fish migration under State Route 3, SR 16 and SR 166 in Kitsap County. New bridges or larger culverts will replace five outdated culverts. Work includes construction of a roundabout at the SR 3 and West Sam Christopherson Avenue intersection.
Project
SR 3/SR 304 to SR 303 - Paving - Complete October 2023
Timeline: July 2023 - October 2023
Workers repaved sections of northbound SR 3 between Bremerton and Silverdale. Repairs also were made at five bridges.
Project
SR 302 - E of Elgin Clifton Rd to SR 16 - Remove fish barriers, paving and ADA compliance
Timeline: Spring 2019 - Fall 2022
In summer 2022, our contractor began fish barrier corrections to replace two outdated culverts at Little Minter Creek under State Route 302. Since 2019, crews have completed paving and ADA ramp work for eight miles of SR 302 in addition to correcting three identified barriers to salmon and resident…
Project
SR 302/Victor Creek - Remove Fish Barrier
Timeline: Spring 2025 - Fall 2025
As part of WSDOT's efforts to remove barriers to fish, this project addresses barriers to fish under SR 302.
Project
SR 305 Agate Pass Bridge Annual Maintenance
Timeline: February 24-27
There's a lot of work that needs to be done to keep bridges in good working order. This includes regular cleaning and inspection of the Agate Pass Bridge. The bridge, on SR 305, connects Bainbridge Island to the Kitsap Peninsula. We clean the bridge every February to keep dirt and grime from…
Project
SR 305/Murden Creek - Remove Fish Barrier - Completed November 2023
Timeline: August 2022 - November 2023
This project removed barriers to fish under SR 305 on Bainbridge Island. A culvert was replaced with a new bridge. The work opened almost 1.5 miles of potential habitat on Murden Creek. The creek is a top salmon stream on Bainbridge Island and is a tributary to Murden Cove.
Project
SR 305/Sam Snyder Creek – Remove Fish Barrier - Completed May 2025
Timeline: October 2023 - May 2025
This project removed two existing 270-foot-long, 36-inch-diameter concrete pipe culverts on State Route 305 outside of Poulsbo at the Sam Snyder Creek crossing and replaced them with a single 239-foot-long steel girder bridge. General work activities included: clearing and grubbing, earthwork…
Project
SR 305/West Port Madison, Agatewood Rd, Adas Will Ln – Safety Improvements - Completed November 2024
Timeline: October 2023 - November 2024
WSDOT built two modern roundabouts on Bainbridge Island at the intersections of SR 305 and Northeast West Port Madison Road/Northeast Seabold Road and SR 305 and Northeast Adas Will Lane. The improvements included curbing and a center median at Agatewood Road Northeast which permanently makes that…
Project
SR 4 - Skamokawa Vic to 0.3 Miles West of SR 432 - Chip Seal and Highway Modifications - Complete July 2022
Timeline: May 2021 - July 2022
In summer 2021, contractor crews working for WSDOT resurfaced roughly a 25-mile stretch of State Route 4, between Skamokawa and State Route 432 near west Longview, between mileposts 29.77 to 54.98. Project work and highway modifications continued during the 2022 construction season and is now…
Project
SR 4 – Crawford Bridge Pedestrian Illumination
Timeline: Spring 2025 - December 2025
State Route 4 is an important connection for Kelso, Longview, and nearby areas in Cowlitz County. It helps people, businesses, and tourists travel between the east and west parts of the county and also leads to the Pacific coast. The area around this route is becoming more urban with increasing…
Project
SR 401 - 2.3 Miles S. of Bean Creek Bridge - Slope Stabilization
Timeline: February 2021 - Fall 2024
On Tuesday, Feb. 23, 2021, due to roadway settlement caused by heavy rainfall, both directions of State Route 401 (also known as the Lewis and Clark Trail Highway) between the Astoria-Megler Bridge and Naselle were closed.
In spring 2021, emergency contractor crews were able to…
In spring 2021, emergency contractor crews were able to…
Project
SR 410 Dry Creek Vicinity - Emergency Slide Repair - Complete October 2023
Timeline: January 2023 - October 2023
Contractor crews working for WSDOT installed a 10-foot, corrugated metal pipe under State Route 410 to allow Dry Creek to pass beneath the roadway along its new channel. This is the second part of emergency repairs following a debris flow in fall 2022, which permanently changed the course of Dry…
Project
SR 410 White River Bridge - Emergency
Timeline: August-October 2025
The SR 410 White River Bridge between Buckley and Enumclaw reopened Friday, Oct. 17, after contractor crews completed repairs. On Aug. 18, 2025, an over-height vehicle struck several of the support beams on the bridge, causing serious damage that required us to close the bridge. After a complete…
Project
SR 411 Cowlitz River Bridge – Replace Bridge Deck
Timeline: Feb. 2023 - Fall 2024
Starting in early 2023, contractor crews will kick off the much-anticipated project to enhance the SR 411 Cowlitz River Bridge, also known as the A Street Bridge or the PH-10 Bridge. This vital bridge connects the City of Castle Rock to the west side of the Cowlitz River.
The primary…
The primary…
Project
SR 411—0.09 Miles S. of Beverly Hts. Rd—Culvert Replacement Emergency
Timeline: July 2025 - Nov. 2025
In fall 2025 contractors working for WSDOT will begin work to remove and replace a failing culvert underneath SR 411, better known as West Side Highway, just south of Castle Rock, in Cowlitz County.
On Friday, Oct. 24, 2025, construction to replace the failing culvert was completed…
On Friday, Oct. 24, 2025, construction to replace the failing culvert was completed…
Project
SR 432 - Industrial Way Vicinity to Cowlitz River - Paver - Completed July 2024
Timeline: Spring 2023 - Summer 2024
In summer 2023 contactor crews working for the Washington State Department of Transportation resurfaced a nearly 2.5 mile stretch of SR 432 between milepost 7.19 near Industrial Way and milepost 7.19 near the Cowlitz River, in Longview, WA. Crews also resurfaced several off- and on-ramps along…
Project
SR 433 Lewis and Clark Bridge Finger Joint Replacement Project - Completed July 2023
Timeline: June 2022 - July 2023
On Sunday, July 16, 2023, bridge crews fully closed the SR 433 - Lewis and Clark Bridge, also known as the Rainier Bridge, spanning across the Columbia River between Longview, WA, and Rainier, OR, for four days. The closure aimed to replace the steel expansion joints that allowed the structure to…
Project
SR 500 - NE 182nd Ave - Intersection Improvements - Complete Fall 2022
Timeline: Spring 2021 - Fall 2022
Beginning in summer 2022, contractor crews from Thompson Bros. Excavating worked to construct a roundabout in east Vancouver, between the intersection of Fourth Plain Boulevard, also known as SR 500 and Northeast 182nd Avenue. Crash data collected over a five-year timeframe between 2013 to 2017…
Project
SR 500 - NE 42nd and 54th Intersection Improvements - Completed Summer 2025
Timeline: Summer 2024 - Spring 2025
This project restored the north/south connection across State Route 500 at the Northeast Stapleton Road/Northeast 54th Avenue intersection in Vancouver by constructing a new pedestrian overcrossing that meets the Americans with Disabilities Act. Restoring access across the highway for people who…
Project
SR 500 - NE Robinson Rd and NE 3rd St - Intersection Safety Improvements
Timeline: Summer 2018 - Late 2026
Growth and development in eastern Clark County is contributing to an increase in traffic volumes and traffic related crashes along SR 500 - between the Northeast Robinson Road and Northeast 3rd Street intersections. To keep people moving safely, reduce travel times and crashes and to ensure this…
Project
SR 500/162nd Ave to 166th Ave – Safe Routes to School - Complete Spring 2024
Timeline: Spring 2022 - Spring 2024
Washington State Department of Transportation’s contractor, Thompson Bros. Excavating, successfully constructed a new shared-use path on the south side of State Route 500, also known as Northeast Fourth Plain Boulevard, between Northeast 162nd and Northeast 166th avenues, allowing those who bike,…
Project
SR 501 - I-5 to Port of Vancouver - Intersection and Profile Improvements - Complete - Sept. 2023
Timeline: Spring 2019 - Fall 2023
Previously, oversized freight vehicles had to divert from this section of Mill Plain Boulevard (SR 501) onto city streets due to high points in the roadway and limited overhead clearances. Corridor modifications increased safety along the corridor for all modes of transportation. Improvements…
Project
SR 503 / NE Rock Creek Rd Intersection Improvements - Completed 2024
Timeline: Winter 2021 - Fall 2024
This project improved safety at the intersection of State Route 503 and Northeast Rock Creek Road by installing a compact roundabout. After reviewing five-years of traffic data that included severe injuries, a fatality, and many cases of property damage, this location was identified for improvement…
Project
SR 503 Prairie High School Pedestrian Signal - Completed 2025
Timeline: November 2023 - February 2025
This project constructed a pedestrian hybrid signal, creating safer access for pedestrians crossing State Route 503 to and from Prairie High School and the nearby transit stop.
Project
SR 503 Spur – Culvert Failure
Timeline: Dec. 2023 - Jan. 2024
On Saturday, Dec. 23, following the installation of a new 48-inch culvert, stabilizing, and back filling the failure area with rock, and reconstructing the roadway, NW Construction General Contracting, Inc., the emergency contractor has successfully restored two lanes of travel, and lifted the…
Slow down – lives are on the line.
Excessive speed was a top cause of work zone collisions in 2024.
Phone down, eyes up.
Work zones need our undivided attention.
It's in EVERYONE’S best interest.
96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.