US 395 – Hafer Road to Chewelah – Paving & Complete Streets

Timeline: Spring 2023 - Summer 2025
  • Road
  • Not started
  • Stevens County
This project will rehabilitate US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, from roughly milepost 202.87 to 207.94 in Stevens County. Crews will be removing the top layer of asphalt and placing new hot mix asphalt (HMA) to create a smoother ride and preserve the roadway…
Project

US 395 – Hatch Road to Hamilton Road – Paving

Timeline: Summer 2024 - Fall 2024
  • Road
  • Not started
  • Spokane County
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project

US 395 – Immel Road to Arden Paving - Complete July 2022

Timeline: May 2022 - June 2022
  • Road
  • Completed
  • Stevens County
This project will rehabilitate roughly 10 miles of US 395 from approximately 5 miles north of Chewelah at Immel Road to the town of Arden in Stevens County. Once the project is completed by grinding and inlaying new HMA (Hot Mix Asphalt), the roadway surface will have a smoother ride that will be…
Project

US 395 – Loon Lake to Hafer Road – Paving & Roundabout - Complete June 2023

Timeline: August 2022 - June 2023
  • Road
  • Completed
  • Stevens County
This project will grind and inlay a little more than 12 miles of roadway on US 395 in Stevens County between the intersection with SR 292 in Loon Lake north to Hafer Road. Crews will be grinding out the pavement and replacing the roadway surface with Hot Mix Asphalt (HMA) to create a smoother ride…
Project

US 395 – NSC I-90 Connection

Timeline: March 2026 - December 2030
  • Road
  • Not started
  • Spokane County
This is the final four projects to construct the North Spokane Corridor and connect to I-90. This is the last step to create the limited access 10.5 mile freeway north/south through Spokane that will remove freight and trips off of the local system.
Project

US 395 – NSC Spokane River Crossing

Timeline: May 2023 - 2025
  • Road
  • Construction
  • Spokane County
This project will construct the North Spokane Corridor bridge that will cross the Spokane River and connect the skyway portion near Spokane Community College to the south and at Carslie Avenue to the north of the river.
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 2

Timeline: April 2025 - December 2028
  • Road
  • Pre-construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 2 project will construct a new divided, four-lane elevated highway from Alki Avenue to Mission Avenue with a partial interchange at Trent Avenue/SR 290. The partial interchange includes an off-ramp and an on-ramp that utilize…
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 3

Timeline: March 2025 - December 2027
  • Road
  • Pre-construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 3 project will construct a new divided, four-lane highway from Sprague Avenue to Alki Avenue. It is the final southern section of the NSC before the connection to Interstate 90.
Project

US 97 - Centerville Rd. to Ski Lodge Rd. Vic. - Paving - Complete September 2022

Timeline: Summer 2021 - Summer 2022
  • Road
  • Completed
  • Klickitat County
This project repaired the roadway by sealing cracks, smoothing ruts and filling potholes and created a smoother, safer driving surface for all users of the highway. Crews also paved sections along East Simcoe Drive.
Project

US 97 - Satus Creek Bridge - Bridge Replacement

Timeline: Spring 2020 - Fall 2022
  • Road
  • Construction
  • Klickitat County
This project will replace the aging and failing Satus Creek Bridge with a new concrete structure that meets current standards and improve safety and mobility.
Project

US 97 - Toppenish to Union Gap - Corridor Improvements - Complete Fall 2021

Timeline: Summer 2021 - Fall 2021
  • Road
  • Completed
  • Yakima County
The first roundabout on the US 97 corridor at the McDonald/Becker intersection near Toppenish is complete. A second roundabout will be built at US 97 and Jones Road at a later date.
Project

US 97A & SR 971 Rock Slope - Scaling - Complete May 2022

Timeline: March 2022-May 2022
  • Road
  • Completed
  • Chelan County
This project will stabilize 6 slopes with rock slope scaling to remove rockfall debris adjacent to the roadway. Work will also repair and install wild life fencing and pavement.

Slopes are located on US 97A at milepost 211.26 - 211.42 and on SR 971 between milepost 10.27 and 11.49.…

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.