Search projects

Learn about current transportation network improvement and preservation activities throughout the state.

You might be looking for studies or local agency managed projects

Filter projects

Select
Select
Select
Select

314 results

Project

US 395 - NSC Spokane River to Columbia - New Segment - Completed August 2024

Timeline: April 2021 - August 2024
  • Road
  • Completed
  • Spokane County
This project will further expand the North Spokane Corridor south from its current end location at Columbia Avenue to the Spokane River. This includes the construction of a new interchange at Wellesley Avenue.
Project

US 395 - NSC Spokane River to Columbia - Shared Use Path - Complete March 2025

Timeline: May 2021 - Spring 2025
  • Road
  • Completed
  • Spokane County
This project extended the current Children of the Sun Trail from where it ends at Columbia Avenue south to Carlisle Avenue. This project was a design-build with the contractor as Graham Contracting.
Project

US 395 Pioneer Memorial Bridge – Bridge Painting Stage 2 - Complete December 2024

Timeline: December 2023 - January 2025
  • Road
  • Completed
  • Franklin County
The US 395 Pioneer Memorial Bridge, also known as the Blue Bridge, needed a new coat of paint to preserve and maintain structural integrity. The paint on the Blue Bridge was faded, weathered, and damaged and this allows corrosion to occur. Crews removed the old peeling paint, cleaned and painted…
Project

US 395 – Boyds to Canada – Chip Seal & Complete Streets

Timeline: Summer 2027
  • Road
  • Pre-construction
  • Ferry County
US 395 from Boyds to the US-Canada Border – milepost 248 to 270 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required implementation of…
Project

US 395 – Division Wye to Wandermere – Paving – Complete Streets

Timeline: Spring 2023 - Summer 2028
  • Road
  • Pre-construction
  • Spokane County
US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required…
Project

US 395 – Hafer Road to Chewelah – Paving & Complete Streets

Timeline: July 2025 - October 2026
  • Road
  • Construction
  • Stevens County
This project rehabilitates roughly five miles of US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, Stevens County. This project includes removing the current roadway surface which has reached the end of its usable life and repaving it with Hot Mix Asphalt (HMA).

Project

US 395 – Hatch Road to Hamilton Road – Paving

Timeline: September 2024 - Spring 2026
  • Road
  • Construction
  • Spokane County
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project

US 395 – NSC I-90 Connection

Timeline: Summer 2027 - Late 2030s
  • Road
  • Not started
  • Spokane County
This is the final three projects to construct the North Spokane Corridor and connect to I-90. This is the last step to create the limited access 10.5 mile freeway north/south through Spokane that will remove freight and trips off of the local system.
Project

US 395 – NSC Spokane River Crossing

Timeline: May 2023 - Spring 2026
  • Road
  • Construction
  • Spokane County
This project will construct the North Spokane Corridor bridge that will cross the Spokane River and connect the skyway portion near Spokane Community College to the south and at Carslie Avenue to the north of the river.
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 2

Timeline: Spring 2026 - December 2028
  • Road
  • Pre-construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 2 project will construct a new divided, four-lane elevated highway from Alki Avenue to Mission Avenue with a partial interchange at Trent Avenue/SR 290. The partial interchange includes an off-ramp and an on-ramp that utilize…
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 3

Timeline: August 2025 - December 2027
  • Road
  • Construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 3 project will construct a new divided, four-lane highway from Sprague Avenue to Alki Avenue. It is the final southern section of the NSC before the connection to Interstate 90.
Project

US 97 - Toppenish to Union Gap - Corridor Improvements

Timeline: 2021 - To be determined
  • Road
  • Construction
  • Yakima County
Since 2018, the Yakama Nation Tribal Council has signed resolutions supporting WSDOT’s proposals to add seven roundabouts at US 97 and SR 22 intersections. Roundabouts at US 97/ McDonald/Becker Road and at US 97/Jones Road are complete. Roundabouts at US 97/ SR 22, SR 22/ SR 223, and US 97/ Larue…
Project

US 97A Illumination and Signal Cabinet Update - Complete September 2025

Timeline: September 2025
  • Road
  • Completed
  • Chelan County
This project has replaced the existing, failing, illumination system inside the Knapps Hill Tunnel. This project is also part of a larger endeavor that fixed and replaced signal cabinets in Leavenworth and parts of Grant County, both of which have already been completed.
In addition to the…
Project

US2/Beckler Peak Drainage Vicinity – Emergency

Timeline: December 2025 - January 2026
  • Road
  • Completed
  • King County
In December 2025, maintenance crews working for the Washington State Department of Transportation closed US 2 between Index and Coles Corner (mileposts 35-85) due to multiple washouts and mudslides. On Thursday, Dec. 11, the closure was extended to include Tumwater Canyon on the east side (milepost…

1,557 work zone-related crashes

were recorded on state highways in 2025.

542 people were injured

in 2025 due to work zone-related crashes. 

29% increase in fatality collisions

in work zones from 2024 to 2025.