SR 160, Fauntleroy Way SW & Ferry Terminal Intersection Improvements
Publication date:
Contract number: XE3729
Submittal due:
Requires signalizing the ferry terminal intersection with Fauntleroy Way Southwest. The project includes traffic signals, illumination, intelligent transportation systems (ITS), signing, hot mix asphalt (HMA) paving, pavement marking, temporary erosion & pollution control, temporary traffic…
US 12, I-5 to 0.5 Mile East of Harms Rd Paving
Publication date:
Contract number: XE3743
Submittal due:
Requires: grind and inlay the traveled surfaces of US 12 from 0.07 miles west of Bridge 12/221 to MP 77.48 with hot mix asphalt (HMA) 1/2" PG 58H-22, joints replacement, applying new membrane and new HMA on bridge No. 12/221, partial mill and fill for bridge 12/226 and paving above existing…
SR 510, Yelm Loop New Alignment Phase 2
Publication date:
Contract number: XE3742
Submittal due:
Requires: grading, asphalt paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek and the Yelm Prairie Line Trail, retaining walls, noise wall, utility relocations, signing, rapid-rectangular flashing beacon signals, illumination, closed-circuit…
I-90, Hansen Rd Overpass Emergency Existing Structure Removal
Publication date:
Contract number: XE3740
Submittal due:
Requires grading, placing crushed surfacing base course (CSBC) and hot mix asphalt (HMA) for the median crossover. The project will also remove the existing bridge 90/216, this includes removing the superstructure, piers, and foundations of the piers 1, 3, and 5. The project will also rebuild…
I-5, N of Martin Way E to E of Mounts Rd SW PCCP Replacement
Publication date:
Contract number: XE3741
Submittal due:
Requires removing and replacing precast cement concrete panels (PCCP), grinding, removing and replacing guardrail, traffic control and other work. Involves 21 items and 40 working days. Work class 5, cement concrete paving.
SR 28, EWC 2026 Demo No. 2
Publication date:
Contract number: XE3739
Submittal due:
Requires the removal of structures and obstructions, removal and disposal of asbestos material, ESC lead, erosion control and water pollution prevention, high visibility fence, high visibility silt fence, bark or wood chip mulch, FA-site cleanup of Bio. and physical hazards, traffic control and…
SR 241 / SR 14, Sunnyside Vic and Columbia River Vic Wheel Path Chip Seal
Publication date:
Contract number: XE3737
Submittal due:
Requires chip sealing, crack sealing, pavement repair, installing centerline rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. Involves 30 items and 30 working days. Work class 3, bituminous surface treatment.
US 730, Oregon State Line to US 12 - Paving
Publication date:
Contract number: XE3738
Submittal due:
Plan and pave hot mix asphalt (HMA) within the traveled lanes, plus 2 feet of the shoulders, install centerline and shoulder rumble strips, crack sealing, asphalt for fog seal the shoulders and rumble strip locations, install weigh in motion sensors (state forces), restore delineation, traffic…
SR 14, W Camas Slough Bridge Deck Paving
Publication date:
Contract number: XE3733
Submittal due:
Requires removal of the existing asphalt overlay, deck membrane, and bridge expansion joints, concrete deck repair, installation of a deck membrane, placement of hot mix asphalt (HMA) overlay, paving bridge approaches, modification of bridge expansion joint headers, installation of expansion joints…
SR 203, NE 124th St. to Skykomish River Paving with Exceptions
Publication date:
Contract number: XE3732
Submittal due:
Requires planing bituminous pavement, pavement repair, paving with hot mix asphalt (HMA), pavement marking, striping, bridge deck repair, signing, traffic loops, closed circuit television (CCTV) installation, temporary traffic control and other work. Involves 47 items and 64 working days. Work…
2026 WSF – Terminal Engineering General Engineering Consultant (GEC) Program
Publication date:
Submittal due:
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Washington State Ferries – Terminal Engineering General Engineering Consultant (GEC)Program. One (1) agreement may be awarded.
The…
The…
I-5, 1.2 Mi. S of Rogers Rd to SR 505 Vic. Paving
Publication date:
Contract number: XE3728
Submittal due:
Requires grinding and inlaying travel lanes, pavement repair, guardrail repair, concrete barrier replacement, rebuilding a climbing lane, installing an underdrain system, traffic control and other work. Involves 63 items and 77 working days. Work class 4, asphalt concrete paving.
SR 508, 0.3 Miles East of Bergen Rd. Engineered Log Jam
Publication date:
Contract number: XE3730
Submittal due:
Requires building two temporary in-water isolation systems, structure excavation, driving steel H-pile, placing large woody material, and restoration, traffic control and other work. Involves 65 items and 55 working days. Work class 1, clearing, grubbing, grading and draining.
US 12, W Gulch Bridge to Rimrock Retreat - Paving
Publication date:
Contract number: XE3731
Submittal due:
Requires planing bituminous pavement, crack sealing, paving with hot mix asphalt (HMA) pavement, constructing reinforced slopes; removing existing overlay from bridge deck, expansion joint modification, bridge deck repair, HMA joint seal at bridge end, and installing waterproof membrane at Bridge…
SR 9, Park Rd & 547 SAAR to Sumas Paving
Publication date:
Contract number: XE3726
Submittal due:
Requires paving by planing bituminous pavement, hot mix asphalt (HMA) paving, rumble strip installation, recessed pavement marker installation, permanent striping, temporary erosion control, temporary traffic control and other work. Involves 36 items and 45 working days. Work class 4, asphalt…
SR 17 et al, NCR Seal 2026
Publication date:
Contract number: XE3725
Submittal due:
Requires pavement repair excavation including haul, asphalt furnishing and placing crushed screenings, crack sealing, planing and paving existing rumble strip, planing bituminous pavement, hot mix asphalt (HMA) for pre-leveling and pavement repair, HMA, delineation, permanent signing, traffic…
US 12, Heron St Bridge Grid Deck Replacement
Publication date:
Contract number: XE3727
Submittal due:
Requires replacing steel grid deck panels and sidewalk curb for Bridge No. 12/12S, temporary traffic control, and other work. Involves 29 items and 86 working days. Work Class 6, bridges and structures.
SR 904, I-90 To Cheney Paving
Publication date:
Contract number: XE3722
Submittal due:
Removing asphalt concrete pavement, concrete barrier and hot mix asphalt (HMA) patches, shoulder finishing, pavement repair excavation including haul, asphalt for fog seal, crack sealing, planing bituminous pavement, HMA for pavement repair, HMA paving, joint adhesive for bituminous paving, ESC…
SR 525, 525 Spur Vic to Mukilteo Ferry Vic Paving & ADA
Publication date:
Contract number: XE3723
Submittal due:
Requires planning bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, traffic signal and ITS work, pavement markings, ADA curb ramps, temporary erosion control, temporary traffic control and other work. Involves 99 items and 95 working days. Work class 4, asphalt concrete paving.…
2026 Washington State Aviation Economic Impact Study Update
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Aviation Economic Impact Study Update (WAEIS) is a comprehensive, 24-month initiative led by the WSDOT Aviation Division to quantify and communicate the full economic and societal value of Washington’s public-use airport…
The Washington State Aviation Economic Impact Study Update (WAEIS) is a comprehensive, 24-month initiative led by the WSDOT Aviation Division to quantify and communicate the full economic and societal value of Washington’s public-use airport…
SR 534, I-5 Interchange to SR 9 Vic Paving
Publication date:
Contract number: XE3713
Submittal due:
Requires hot mix asphalt (HMA) paving and planing, pavement repair, pavement markings, temporary erosion and sediment control, traffic control and other work. Involves 36 items and 51 working days. Work class 4, asphalt concrete paving
US 2, Cashmere West - Paving
Publication date:
Contract number: XE3715
Submittal due:
Requires pavement repair excavation including haul, expansion joint modification comp. seal and header, bridge deck repair, waterproof membrane, planing bituminous pavement, hot mix asphalt (HMA) for
pavement repair CL. 1/2 IN. PG 64V-28, HMA CL. 1/2 IN. PG 64V-28, traffic signal system #1-…
pavement repair CL. 1/2 IN. PG 64V-28, HMA CL. 1/2 IN. PG 64V-28, traffic signal system #1-…
SR 211, JCT US 2 to JCT SR 20 Paving
Publication date:
Contract number: XE3717
Submittal due:
Requires planing bituminous pavement, crack sealing, joint adhesive, hot mix asphalt (HMA) paving, pavement repair, erosion control, centerline rumblestrips, pavement markings, guide posts, guardrail, signing, traffic control and other work. 40 working days, 52 items. Work class 4, asphalt concrete…
I-90 et al., SR-202 SR-203 & SR-900 Adaptive Management
Publication date:
Contract number: XE3716
Submittal due:
Requires: install streambed material, boulders, aquitards, large woody material, slash, temporary erosion and sediment control, traffic control, temporary stream diversions, and roadside restoration, traffic control and other work. Involves 40 items and 85 working days. Work class 1, clearing,…
I-5, N of Old Hwy 99 SW to N of Maytown Rd SW Paving
Publication date:
Contract number: XE3714
Submittal due:
Requires planing bituminous pavement, pavement repair, inlay with hot mix asphalt (HMA), installing pavement markings, installing guardrail, installing permanent signing, traffic control and other work. Involves 45 items and 91 working days. Work class 4, asphalt concrete paving.
SR509 Miller Creek Fish Passage
Publication date:
Contract number: XE3718
Submittal due:
This Project will remove (2) fish barrier culverts and (7) weirs. These existing fish barriers will be replaced with a fish-passable structure and a new stream alignment under SR 509/Des Moines Memorial Drive. Work will include, but is not limited to, fish exclusion and temporary stream bypass…
I-5, Koontz Rd to S of Alder St. w Exceptions
Publication date:
Contract number: XE3709
Submittal due:
This project will preserve the existing pavement Northbound and Southbound I-5 Mile Post 69.40 to 71.65 NB & SB and 79.64 to 80.75 by planing 0.15 ft. of existing asphalt pavement and replacing with 0.15 ft. hot mix asphalt (HMA) Class 3/8-inch PG 58V-22. This will include all through lanes and…
SR 25 & SR 231, 2026 Eastern Region Chip Seal
Publication date:
Contract number: XE3710
Submittal due:
Requires constructing bituminous surface treatment (BST), crack sealing, hot mix asphalt (HMA) for pavement repair, prelevel, wearing course, fog seal, pavement markings, traffic control and other work. Involves 71 items and 60 working days. Work class 3, bituminous surface treatment, or work class…
SR 14, E of Slide Bridge Repair Crib Wall
Publication date:
Contract number: XE3708
Submittal due:
This project will protect and preserve the existing retaining wall by installing soil nails through the existing timbers and spray the wall surface with shotcrete and other work. Involves 27 items and 32 working days. Work class 36, earth retention and anchoring, and work class 46, concrete…
Emergency purchase – Northwest Region – SR99 Duwamish Bridge Deck
Publication date:
Contract number: T102306
Vendor: Mission Critical Solutions (MCS)
On February 18, 2026, the WSDOT Bridge Preservation Office (BPO) received notification from field inspectors at the Duwamish River Bridge (bridge 99/530E) that there were multiple structural deficiencies in the steel grid deck (roadway surface…
On February 18, 2026, the WSDOT Bridge Preservation Office (BPO) received notification from field inspectors at the Duwamish River Bridge (bridge 99/530E) that there were multiple structural deficiencies in the steel grid deck (roadway surface…
Slow down – lives are on the line.
Drive the posted speeds, they’re there for your safety.
Phone down, eyes up.
Pay attention – both to workers directing you and to surrounding traffic.
Stay calm
Expect delays, leave early or take an alternate route if possible; no appointment is worth risking someone’s life.