Search contracting opportunities

Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.

Filter contracts

Select
Select
Select
Select

125 results

2023 Transportation Impacts of Lower Snake River Dam Removal

Publication date:
Submittal due:
  • Consultant Services
  • Advertised
  • Statewide
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide transportation analysis and reporting services and a program of inclusive community engagement for the Transportation Operations Division.

2023 Olympic Region’s Progressive Design Build Program

Publication date:
Submittal due:
  • Consultant Services
  • Advertised
  • Statewide
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Independent Cost Estimate (ICE) services for a heavy civil Progressive Design-Build (PDB) program consisting of approximately 50 fish barrier replacement…

SR 167, SR 161 to SR 410 - Rebuild Interchange Project

Publication date:
Contract number: XE3476
Submittal due:
  • Public Works
  • Planned
  • Pierce County
This project proposes to construct a diverging diamond interchange at North Meridian, a portion of the new SR 167 alignment from the Puyallup Recreation Center east to SR 410, a new bridge over Milwaukee Ave, and a portion of the Tacoma to Puyallup Regional Trail.

US 101, May Cr in Vic of Dowans Cr Rd Remove Fish Barrier

Publication date:
Contract number: XE3468
Submittal due:
  • Public Works
  • Advertised
  • Clallam County
  • Jefferson County
Replacing the existing 9 foot corrugated metal pipe with a 175 foot prestressed concrete girder bridge, stream diversion, erosion control, dewatering, tree removal, temporary detour install and removal, construction of temporary bridge, temporary illumination system, roadways and structure…

SR 14, Lieser Road Bridge - Emergency Bridge Repair

Publication date:
Contract number: XE3472
Submittal due:
  • Public Works
  • Awarded
  • Clark County
Removal and replacement of girder, repair girder and interior girders, remove and replace guardrail, traffic control and other work. Involves 41 items and 80 working days.

SR 12, White Pass Vicinity - Major Drainage Phase 3B

Publication date:
Contract number: XE3471
Submittal due:
  • Public Works
  • Pending Award
  • Yakima County
Removing the existing 36” corrugated metal culvert and replacing with an eighteen-foot clear span eight-foot rise precast concrete four-sided box culvert with wing and end walls, regrading of Andy Creek and placement of streambed materials, raising the roadway profile and widening of the roadway…

2023 WSF Visual Paging

Publication date:
Submittal due:
  • Consultant Services
  • Pending Award
  • Statewide
Notice - This ad is currently closed.

The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide consultants to review Washington State Ferries (WSF) Visual Paging program and make recommendations…

SR 519, Seattle Ferry Terminal Slip 3 VTS Replacement

Publication date:
Contract number: XE3464
Submittal due:
  • Ferries
  • Public Works
  • Awarded
  • King County
Removal of the existing vehicle transfer span, associated cable lifting frame and support piling, installation of new hydraulic transfer span and apron, drilled shaft foundations and replacing the end batter pile located on the left wingwall and modification to the bridge seat and other work.…

I-90, 2.77 Miles West of Tinkham Rd WB Slope Stabilization

Publication date:
Contract number: XE3469
Submittal due:
  • Public Works
  • Awarded
  • King County
Rock slope scaling, slope scaling vegetation removal and rock slope scaling debris removal, installing temporary barrier, rockfall containment netting, rock dowels, erosion control, seeding, pavement markings, traffic control and other work. Involves 33 items and 90 Working days. Work class 39.

SR 20, Olson Creek Fish Passage - Demo 1 (Small Works Roster)

Publication date:
Contract number: 23A814
Submittal due:
  • Public Works
  • Awarded
  • Skagit County
Abatement of asbestos materials, removal and disposal of building, building contents, septic tank, drain field, water service line, and miscellaneous debris and other work

SR 169 & SR 509 Fish Passage

Publication date:
Contract number: XE3456
Submittal due:
  • Public Works
  • Advertised
  • King County
The project will replace seven fish barriers and replace them with fish-passable crossings at SR 169 Ginder Creek, SR 169 Jones Lake, and SR 509 Miller Creek. The Work includes, but is not limited to, the following: Design and construction of fish passable water crossing and structures, including…

US 101, 2023 OR Region Wide Safety Features – Signing

Publication date:
Contract number: XE3466
Submittal due:
  • Public Works
  • Awarded
  • Clallam County
  • Grays Harbor County
  • Jefferson County
  • Mason County
  • Thurston County
Removing, relocating and installing permanent signs, traffic control and other work. Involves 11 items and 80 Working days. Work class 27.

US 12 Clear Fork Br/US 97 Br Over Bickleton Rd - Bridge and Deck Rehabs

Publication date:
Contract number: XE3465
Submittal due:
  • Public Works
  • Awarded
  • Klickitat County
  • Lewis County
Rehabilitate the existing concrete bridge decks of bridge 12/282 and 97/8. This work shall consist of scarifying concrete
surface, deck repairs, modified concrete overlays, pavement markings, traffic control, and other work. Involves 48 items and 50 Working days. Work class 6.

SR 14 et al, West Skamania and Klickitat Counties Stormwater Retrofits

Publication date:
Contract number: XE3463
Submittal due:
  • Public Works
  • Awarded
  • Klickitat County
  • Skamania County
Installing narrow filter strips, traffic control and other work. Involves 21 items and 35 Working days. Work class 1 or 2.

2023 Bridge Design Office Staff Augmentation – Project Management Services

Publication date:
Submittal due:
  • Consultant Services
  • Pending Award
  • Statewide
Notice - This ad is currently closed.

The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Project Management Services for the WSDOT Bridge Design Office. One (1) agreement may be awarded.…

US 2 et al, NWR Breakaway Cable Terminal Replacement 21-23

Publication date:
Contract number: XE3461
Submittal due:
  • Public Works
  • Awarded
  • King County
  • Snohomish County
  • Whatcom County
Replacing 22 breakaway cable terminals or attenuators with terminals or attenuators meeting current standards, remove 2 breakaway cable terminals and guardrail runs, replace guardrail, install concrete barriers, install traffic curbs, erosion control, traffic control and other work. Involves 60…

I-5, Dike Access Road Bridge - Bridge Deck and Expansion Joints

Publication date:
Contract number: XE3462
Submittal due:
  • Public Works
  • Awarded
  • Cowlitz County
Hydro milling of the existing deck and replaced with a modified concrete overlay, expansion joint replacement, 100-foot transition hot mix asphalt (HMA) paving before and after the bridge, guardrail improvements, traffic control and other work. Involves 56 items and 65 working days. Work class 6.

I-5 Yesler Way to Northgate Way Vic. Pavement, Deck, Joints, and Drainage

Publication date:
Contract number: XE3452
Submittal due:
  • Public Works
  • Advertised
  • King County
The Project replaces the existing Cement Concrete Pavement (CCP), Hot Mix Asphalt (HMA) pavement, bridge deck overlay pavements, and bridge expansion joints on Interstate 5 (I-5), from Yesler Way to north end of Ship Canal Bridge. In addition, the Project rehabilitates the existing pavements of…

SR 507, N of Connor Rd - Culvert Replacement (small works roster)

Publication date:
Contract number: XE3460
Submittal due:
  • Public Works
  • Awarded
  • Thurston County
Removing and replacing the existing 18-inch concrete culvert, pavement marking, traffic control and other work. Involves 27 items and 11 working days. Work class 1.

SR 4, 0.2 and 4.53 Miles W of Germany Creek Bridge - Slope Stabilization

Publication date:
Contract number: XE3459
Submittal due:
  • Public Works
  • Awarded
  • Cowlitz County
Manual scaling, removing rockfall debris, repairing and extending existing rockfall fence, traffic control and other work. Involves 38 items and 63 working days. Work class 24 or 1 & 39.

SR 17, Soap Lake to Lake Lenore Caves - Unstable Slopes Re-Advertisement

Publication date:
Contract number: XE3458
Submittal due:
  • Public Works
  • Awarded
  • Grant County
Rock slope scaling, planing bituminous pavement, hot mix asphalt (HMA), planing shoulder drainage cutout, pavement patching, flexible guide post, centerline and sinusoidal rumble strip, slope protection, guardrail repair and protection, rock bolt & rock dowel grout exceedance, post anchorage…

SR 105, Washaway Beach Vicinity – Slope Protection

Publication date:
Contract number: XE3455
Submittal due:
  • Public Works
  • Awarded
  • Pacific County
Extending corrugated polyethylene culvert pipe, placing streambed cobbles over dynamic revetment areas, stockpiling streambed cobbles, traffic control and other work. Involves 14 items and 30 working days. Work class 1.

I-90, Vantage Bridge Replace Bridge Deck Special Repairs & Drainage

Publication date:
Contract number: XE3453
Submittal due:
  • Public Works
  • Advertised
  • Adams County
  • Grant County
  • Kittitas County
Constructing temporary debris containment, removing the existing bridge deck, constructing a new pre-cast concrete deck, installing new traffic barrier, cleaning and painting select metal surfaces of the bridge, providing special repairs for a select number of bridge columns and struts, upgrading…

US 12, Nine Mile Hill To Frenchtown Vic – Turnback Improvements Phase 2

Publication date:
Contract number: XE3454
Submittal due:
  • Public Works
  • Awarded
  • Walla Walla County
Crack sealing, repairing pavement in select locations, cleaning culverts, adjusting signage, removing illumination, refreshing existing paint stripe throughout project limits, traffic control and other work. Involves 27 items and 20 Working days. Work class 1 or 4.

SR 163/160, Point Defiance/Tahlequah Ferry Terminals Trestle/Wingwall Preservation

Publication date:
Contract number: XE3451
Submittal due:
  • Ferries
  • Public Works
  • Awarded
  • Pierce County
  • King County
Timber and steel pile repair, asphalt repair, pavement markings, traffic control, and other work. Involves 29 items and 90 working days. Work class 4 or 6.

SR 401, 2.3 Miles S of Bean Creek Bridge Slope Stabilization

Publication date:
Contract number: XE3430
Submittal due:
  • Public Works
  • Awarded
  • Pacific County
Stabilizing the slope via replacing heavy material in subgrade with lightweight fill, rebuilding the roadway back to its original state, making several improvements to the drainage system, traffic control, and other work. Involves 47 working days and 66 items. Work class 1.

2023 WSF – Econometric Ridership and Revenue Forecasting

Publication date:
Submittal due:
  • Consultant Services
  • Awarded
  • Statewide
Notice - This ad is currently closed.

The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide WSF Econometric Ridership and Revenue Forecasting. One (1) agreement may be awarded.

US 97, S of Oroville - Roadway Repair

Publication date:
Contract number: XE3448
Submittal due:
  • Public Works
  • Awarded
  • Okanogan County
Roadway excavation, bridge deck repairs, waterproof membrane, removing existing overlay from bridge deck, hot mix asphalt, beam guardrail, pavement markings, traffic control and other work. Involves 62 items and 23 working days. Work class 1 & 2 or 6.

SR 410, Dry Creek Vicinity Emergency Slide Repair

Publication date:
Contract number: XE3449
Submittal due:
  • Public Works
  • Awarded
  • Pierce County
Culvert installation, slope repair, drainage, hot mix asphalt paving, pavement markings, temporary erosion and water pollution control, traffic control and other work. Involves 58 items and15 working days. Work class 1.

I-90, North Bend Vic to Snoqualmie Pass Vic Deck Rehab and Drainage Repair

Publication date:
Contract number: XE3447
Submittal due:
  • Public Works
  • Awarded
  • King County
  • Kittitas County
Rehabilitating 5 bridges and their bridge approach slabs by scarifying concrete surfaces, cement concrete pavement grinding, planing bituminous pavement and applying modified concrete overlays. Bridges 90/91.5S, 90/95S, 90/96S, and 90/98.6N require expansion joint modifications, and bridge 90/105S…

Enjoy paid time off. 

Our employees earn paid vacation and sick leave every month, as well as 12 paid holidays per year.

Work in a modern environment.

We offer telework options, an infant at work program, flexible work schedules and more.

Continue your learning journey.