Contract summary
Requires roadway excavation, embankment compaction, drainage modifications, crack sealing, bridge joint sealing, planing bituminous pavement, hot mix asphalt (HMA) paving, joint adhesive, erosion control, seeding and mulching, compost, curb and gutter, sidewalk, guardrail, pavement markings, rumble strips, signing, rectangular rapid flashing beacons, illumination, signal system, traffic control and other work. 85 working days. Involves 111 items. Work class 4 or 1 & 17 - asphalt paving or clearing, grubbing, grading and draining and cement concrete sidewalks.