Cost risk assessment

Find guidance and estimating documents to support effective Cost Risk Assessment (CRA) and the Cost Estimate Validation Process (CEVP) for your projects.

Project risk management guidance

Refer to the Guide for Project Risk Management and Risk-Based Estimating (PDF 4.69MB) for CRA-CEVP workshop guidelines.

The documents listed below provide the information needed to:

Identify and assess risk within projects

Initiate and conduct a CRA or CEVP workshop

Report CRA or CEVP workshops

Estimating

Refer to these guidance and estimating documents to support the estimating for your projects.

Use these resources for clarity on your estimating projects.

View the awarded Design-bid build contracts. The award to estimate with average number of bidders by month.

Software

There are multiple software programs to help with your estimating needs.

Bid Tabs Pro (Oman Systems) - software provided by a private company using Bid Tabulation data from EBASE. It analyzes all Standard Bid Item and Contractor bid data for contacts let by WSDOT. It makes this data available with a multitude of predefined query areas and creates reports or exports to excel the results based on those queries.

Unit Bid Analysis provides a good starting point for determining Bid Item costs. The Unit Bid Analysis information provided is a good place to start, but each project is different and there are many factors that need to be considered to develop an accurate estimate using historical bid prices.

For contracts using the Asphalt Cost Price Adjustment General Special Provision, use the cost calculation for Asphalt Cost Price Adjustment (XLSX 17KB) (General Special Provision 5-04.5.OPT2.GR5) to calculate the amount needed for Standard Item 5837, Asphalt Price Adjustment. This amount will change as the Asphalt Binder Reference Cost Index changes, so frequent updates are recommended. Download the worksheet each time you use it so that you have the latest version. Please refer to the instruction sheet (PDF 498KB) about estimating cost adjustments for HMA and CRS.

For contracts using the Cost Price Adjustment Special Provision, use the cost calculation for CRS-2P Cost Price Adjustment (XLSX 17KB) (General Special Provision 5-02.5.OPT3.GR5) to calculate the amount needed for Standard Item 005294, CRS-2P Cost Price Adjustment.

Specialty groups

See guidance on preparing bridge cost estimates (PDF 2.5MB) and specifications.

The FHWA established a Highway Construction Cost Increases and Competition Issues web page to share information regarding increasing construction costs.

Multimodal Planning has created an access based Planning Level Cost Estimating package.

If your community is considering building a new bicycle facility, you can use the Benefit-Cost Analysis of Bicycle Facilities (PDF 4.4MB) to estimate costs, the demand in terms of new cyclists, and measured economic benefits (e.g., time savings, increased livability, decreased health costs, a more enjoyable ride).

Industry resources

RS Means publishes guides for construction cost estimating. Check out their heavy civil guide (includes highways and roads)through the WSDOT library.

The Associated General Contractors provides news for contractors and the construction industry. It is a good resource for gaining an idea of market conditions from the contractor’s perspective.

S&P Global is another resource regarding market conditions, but leaning more towards the state of commodities, oil, steel, etc.

Estimating Forms
232-007A Design Calculation (PDF 114KB)
230-031 Bridge Quantities (PDF 294KB)
230-040 Cost Estimate Summary (PDF 159KB)

Find your region Value Engineering & Cost Risk Assessment coordinators

Slow down – lives are on the line.

Drive the posted speeds, they’re there for your safety.

Phone down, eyes up.

Pay attention – both to workers directing you and to surrounding traffic.

Stay calm

Expect delays, leave early or take an alternate route if possible; no appointment is worth risking someone’s life.