Future standard plans
Check here for upcoming approved standard plans.
Future Standard Plans are those approved for publication, that are awaiting the next installment of a revision package (an annual cycle) before they can be referenced from a contract. We post them on the Standard Plans page as they become approved.
A Future Standard Plan may be included in a forthcoming contract as a detail sheet.
Standard Plan | Standard Plan title | Plan sheet | Zip file | Last updated | Sheet count |
---|---|---|---|---|---|
B-70.20-01 |
Mitered End Sections |
PDF 1.7KB | ZIP 87KB |
3/15/2022 |
|
B-75.50-02 |
Type 1 Safety Bars for Stepped Culvert Pipe or Pipe Arch |
PDF 652KB | ZIP 217KB |
3/15/2022 |
|
C-24.15-00 |
Beam Guardrail Connection to structure ~ Adapter Plate |
PDF 503KB | ZIP 343KB |
3/20/2022 |
2 sheets |
D-2.92-01 | Noise Barrier Wall Access Door & Frame | PDF 4.3MB | ZIP 191KB | 4/26/2022 | |
F-10.18-03 | Roundabout Cement Concrete Curbs | PDF 272KB | ZIP 524KB | 3/28/2022 |
8,683 animals crossed the Snoqualmie Pass East Project area
as recorded by WSDOT and partners in 2020 and 2021.
46% increase in Amtrak Cascades ridership to 251,000 passengers
in 2021 compared to 172,000 in 2020.
Nine wetland and stream mitigation sites across 32.7 acres added
to our monitoring program in 2021 to help offset climate change impacts.