Project delivery memos
Project Delivery Memos are design and construction documents used to implement an immediate change in any stage of project, from design through advertisement and construction.
Memos remain in effect until all appropriate support documentation can be updated or replaced.
Active memos
#22-06 Electronic Design Files Available During Bid (PDF 211KB)
#22-05 Interim At-Risk Advertisement Procedure (PDF 361KB)
#22-04 Buy America (PDF 300KB)
#22-03 Complete Streets Implementation (PDF 883KB)
#22-02 Risk Approval for Advertisement of Design-Build Projects (PDF 191KB)
#22-01 Vertical Clearance for Water Crossing Bridges and Buried Structures (PDF 187KB)
#21-04 Fish Passage Project Efficiencies (PDF 187KB)
#21-03 Professional Liability Insurance Risk Assessment (PDF 170KB)
#21-01 Pedestrian Accommodation in Alteration and Pavement Preservation Project (PDF 756KB)
#19-04 Acquiring temporary construction rights for ADA in preservation projects (PDF 52KB)
#19-04 (Process Option) ADA in preservation projects (PDF 25KB)
#19-03 BOD and Pre-Design Implementation (PDF 518KB)
#19-01 Freeway Work Zone Variable Regulatory Speed Limit and Advisory Speed Implementation (PDF 132KB)
#15-03 ADA Guidance - Pavement Preservation Projects (PDF 1.2MB)
This memo supersedes Project Delivery Memo 15-03 (Revised) dated December 5, 2016.
Traction tires are a special type of tire
manufactured with at least 1/8 of an inch tread. Traction tires are usually marked with a mountain/snowflake symbol, the letters M+S or “All Season.”
Carry chains, practice before leaving
Requiring chains keeps traffic moving during storms rather than closing a pass or roadway.
Prep your car. Fill up your gas tank,
pack jumper cables, ice scraper, warm clothing, snacks and water.