Project delivery memos
Project Delivery Memos are design and construction documents used to implement an immediate change in any stage of project, from design through advertisement and construction.
Memos remain in effect until all appropriate support documentation can be updated or replaced.
Active Memos
#22-02 Risk Approval for Advertisement of Design-Build Projects (PDF 191KB)
#22-01 Vertical Clearance for Water Crossing Bridges and Buried Structures (PDF 187KB)
#21-04 Fish Passage Project Efficiencies (PDF 187KB)
#21-03 Professional Liability Insurance Risk Assessment (PDF 170KB)
#21-02 Applying Professional Stamps (PDF 663KB)
#21-01 Pedestrian Accommodation in Alteration and Pavement Preservation Project (PDF 756KB)
#19-04 Acquiring temporary construction rights for ADA in preservation projects (PDF 52KB)
#19-04 (Process Option) ADA in preservation projects (PDF 25KB)
#19-03 BOD and Pre-Design Implementation (PDF 518KB)
#19-02 F-Shape Barrier - MASH Implementation (PDF 1.6MB)
#19-01 Freeway Work Zone Variable Regulatory Speed Limit and Advisory Speed Implementation (PDF 132KB)
ADA Guidance - Pavement Preservation Projects (PDF 1.2MB)
This memo supersedes Project Delivery Memo 15-03 (Revised) dated October 27, 2015
Zero emission electric vehicle registrations in Washington
increased 192% between 2017 and 2021.
45 projects to improve freight rail structures and freight movement
were underway as of December 31, 2021.
Washington state leveraged $100,000 to secure $27 million
in funding for airport investments in Fiscal Year 2022.