Contract summary
Removing sidewalk, curb and gutter, crossings, turnouts, rail, ties, cleanup and disposal of legacy material and roadway excavation, paving, curb and gutter, sidewalk, pavement markings, culverts, ballast distribution, ties, replacing rail with OTM, rail joints, surface line and dress, undercutting, turnouts, crossing replacement, surveying, ditching, signal modifications, erosion control, traffic control and other work. Involves 66 items and 229 working days. Work class 54.