Contract summary
Requires rehabilitating the existing roadway by planing bituminous pavement, excavating pavement repair areas, paving with hot mix asphalt, bridge deck repair and placing waterproof membrane for bridges, replacing existing pavement markings, traffic control and other work. Involves 47 items and 50 working days. Work class 4 - asphalt paving.