Contract summary
Requires bituminous surface treatment, pavement repair excavation, crack sealing, hot mix asphalt (HMA) for pavement repair and prelevel, joint seal at bridge ends, shoulder finishing, guideposts, pavement markings, erosion control, traffic control and other work. Involves 36 items and 36 working days. Work class 3 or 4.