SR 9 – Marsh Road to 2nd Street Vicinity – Widening & Bridge Painting

Timeline: 2018 - 2027
  • Road
  • Pre-construction
  • Snohomish County
This project will widen State Route 9 between Marsh Road and 2nd Street near the city of Snohomish, build southbound bridges directly to the west of the existing bridges—which will become northbound lanes—over the Snohomish River, and rebuild the on-ramp from 2nd Street to southbound SR 9. It also…
Project

SR 9/Bickford Ave. Intersection Improvements - Complete May 2023

Timeline: May 2022 - Spring 2023
  • Road
  • Completed
  • Snohomish County
In June 2022, Granite Construction Company, contractor crews working for WSDOT, built a roundabout at the intersection of State Route 9 and Bickford Avenue.
Project

SR 9/South Lake Stevens Road – Intersection Improvements - Complete May 2023

Timeline: February 2022 - Spring 2023
  • Road
  • Completed
  • Snohomish County
Beginning in February 2022, Interwest Construction Inc., contractor crews working for WSDOT, constructed a roundabout at the intersection of SR 9 and South Lake Stevens Road to improve safety and mobility. Crews also improved fish habitat by replacing the existing culvert under South Lake Stevens…
Project

SR 900 - Tibbetts Creek to Lake Sammamish – fish passage

Timeline: 2020-2029
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals. Beginning as early as winter 2024, WSDOT will install…
Project

SR 900/57th Ave S to S 135th Pedestrian and Safety Improvements

Timeline: 2024 - 2027
  • Road
  • Pre-construction
  • King County
State Route 900/Martin Luther King Jr. Way South in the unincorporated Skyway-West Hill community is a busy roadway between Renton and Seattle serving drivers, freight, public transit, bicyclists and pedestrians. This project will construct bicycle and pedestrian facilities on SR 900 that allow…
Project

SR 900/68th Ave S Vicinity – Pedestrian Safety – Phase 2 PCCP & Deck Overlay – Completed May 2023

Timeline: August 2022 - May 2023
  • Road
  • Completed
  • King County
In the Bryn Mawr-Skyway area of King County between Seattle and Renton, just west of 68th Avenue South, we worked with King County Metro to build 500 feet of new sidewalk and a raised platform for pedestrians to access a Metro bus stop on the east side of the highway.

This new…
Project

SR 92/Lundeen Creek to Lake Stevens Fish Passage

Timeline: 2022 - November 2026
  • Road
  • Pre-construction
  • Snohomish County
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project

SR 92/Pilchuck River CED – Woody Debris Repair

Timeline: July 2024 - Fall 2024
  • Road
  • Construction
  • Snohomish County
Beginning in July 2024, contractor crews working for WSDOT will re-establish fish habitat in the Pilchuck River along State Route 92, just south of Sleepy Hollow Road, near Granite Falls. This project will replace large woody debris constructed as fish habitat in 2016, much of which has washed away…
Project

SR 96 - North Creek Fish Passage

Timeline: Summer 2023 to Winter 2024
  • Road
  • Construction
  • Snohomish County
As part of the state's fish recovery efforts, WSDOT has made it a priority to reconnect waterways where our roads act as barriers. In western Washington, that means building hundreds of fish passable structures under state highways in the next decade to create habitat gain essential for…
Project

SR 99 to Eastbound SR 518 On-ramp - Emergency Culvert Repair - Complete October 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Part of a culvert running underneath the State Route 99 on-ramp to eastbound SR 518 in Tukwila failed, damaging the on-ramp as well as the shoulder along the Airport Expressway on-ramp to eastbound SR 518.

Contractor crews repaired failed section of the culvert to prevent further…
Project

SR 99 tunnel - Complete February 2019

Timeline: 2009 - 2019
  • Road
  • Completed
  • King County
The SR 99 tunnel replaced the Alaskan Way Viaduct along Seattle's central waterfront, carrying State Route 99 beneath downtown Seattle. The 2-mile tunnel opened to drivers in February 2019.
Project

SR 99/1st Ave S Bridge-Tower Mitigation & Watertight Door Replacement

Timeline: Summer 2025 - Summer 2026
  • Road
  • Pre-construction
  • King County
This project will replace watertight doors, demolish the East Control Tower’s top two floors and seal the new roof on the northbound State Route 99 1st Avenue South Bridge from mileposts 26.83 to 26.88. This project will also include waterproof membrane roof work on the West Bridge Control Tower…
Project

SR 99/S 272nd St to SR 516 Vic - Paving & ADA Compliance project

Timeline: 2024-2027
  • Road
  • Pre-construction
  • King County
This project will resurface the northbound and southbound lanes of State Route 99 from South 272nd Street to SR 516 to extend the pavement service life. Crews will grind and inlay new Hot Mix Asphalt (HMA), perform pavement repair, traffic loop replacement, striping and traffic control. Pedestrian…
Project

SR 99/Tunnel – Pavement Texturing

Timeline: Spring 2025 – Fall 2025
  • Road
  • Pre-construction
  • King County
Crews working for WSDOT will texture the existing concrete pavement of the north and southbound State Route 99 tunnel. The technique of shot-blasting the roadway will provide added friction for vehicles’ tires and improve traction.
Project

SR99/SR 516 to S 200th St – Paving & ADA Compliance

Timeline: Spring 2024 – Fall 2024
  • Road
  • Pre-construction
  • King County
This project will rehabilitate roughly two miles in each direction of State Route 99 from the SR 516 intersection to South 200th Street. Crews will grind and inlay new Hot Mix Asphalt giving the roadway a smoother surface and preserving it for years to come. Pedestrian curb ramps will also be…
Project

Tacoma Narrows Bridge Toll Equipment Replacement Project

Timeline: Spring 2024 - Fall 2024
  • Road
  • Construction
  • Pierce County
The eastbound span of the Tacoma Narrows Bridge opened July 15, 2007 as the first modern toll road in Washington.

What at the time was considered state of the art technology is nearing the end of its usable life. Over the course of several months WSDOT will replace the aging and…
Project

US 101 - 0.8 Miles N of Astoria-Megler Br. - Emergency Culvert Replacement - Complete Spring 2021

Timeline: February 2021 - Spring 2021
  • Road
  • Completed
  • Pacific County
On February 16, 2021, due to heavy seasonal rainstorms and harsh winter weather, the existing culvert drainage system that runs underneath a portion of US 101 at milepost 1.2, just north of the Astoria-Megler Bridge, began to fail causing a portion of the road to give way and sink.

Project

US 101 - Coffee Creek - Remove Fish Barrier - Complete November 2020

Timeline: August 2019 - November 2020
  • Road
  • Mason County
Crews working for WSDOT built a replicated stream between Coffee Creek and Goldsborough Creek in Shelton. The project also rebuilt both southbound on- and off-ramps at the US 101/West Shelton/Matlock interchange.
Project

US 101 - Elwha River Bridge - Bridge Replacement

Timeline: April 2023 - Summer 2025
  • Road
  • Construction
  • Clallam County
WSDOT replaced the US 101 Elwha River Bridge in Port Angeles. Replacing the bridge has ensured that US 101 continues to be a reliable transportation facility for decades to come.

The new bridge is 40 feet wide and has two 12-foot lanes with two-8 foot shoulders. (The old bridge was…
Project

US 101 - Indian Creek - Remove Fish Barrier - Completed March 2023

Timeline: February 2022 - March 2023
  • Road
  • Completed
  • Clallam County
This project removed and replaced an outdated culvert under US 101 west of Port Angeles at Indian Creek. To keep traffic moving, crews constructed a temporary bypass bridge near the site as the new bridge over Indian Creek was built.

The culvert was replaced with a new 180-foot…
Project

US 101 - Jefferson and Clallam Counties Fish Barriers - Remove Fish Barriers

Timeline: Summer 2023 - Fall 2025
  • Road
  • Construction
  • Clallam County
  • Jefferson County
This project addresses multiple barriers to fish under US 101 between Sequim and Discovery Bay.
Project

US 101 - Leland Creek and Unnamed Tribs - Remove Fish Barriers - Complete December 2023

Timeline: February 2023 - December 2023
  • Road
  • Completed
  • Jefferson County
This project removes and replaces several outdated barriers to fish migration under US 101 near Leland Valley Road NE in Jefferson County. The north and south tributaries at mileposts 290.3 and 291.8 will be replaced with larger box culverts, and the site crossing Leland Creek will be replaced with…
Project

US 101 - May Creek in Vic of Dowans Creek Rd - Remove Fish Barrier

Timeline: Spring 2024 - Fall 2026
  • Rail
  • Construction
  • Jefferson County
  • Clallam County
This fish barrier removal project replaces an outdated culvert along US 101 south of Forks. A 175-foot-long concrete girder bridge will replace the existing metal pipe to improve fish migration in May Creek.
Project

US 101 - S of Cosmopolis - Stabilize Slope - Complete June 2022

Timeline: August 2021 - June 2022
  • Road
  • Completed
  • Grays Harbor County
This stretch of roadway, often referred to as “Cosi Hill,” sit on a pre-historic landslide and suffers from chronic roadway settlement. Heavy rains triggered the roadway to drop more than five feet.

Crews reopened the highway to two-way travel on Friday, May 20. Final roadway…
Project

US 101 - SR 109 Grays Harbor, Jefferson and Clallam Counties - Remove Fish Barriers

Timeline: 2023 - 2026
  • Road
  • Construction
  • Grays Harbor County
  • Jefferson County
  • Clallam County
This project will correct 29 identified streams and culverts that cross under US 101 and SR 109 in Grays Harbor, Jefferson and Clallam Counties. The culverts under the highways do not allow fish to access vital habitat.

Once complete, this project will restore nearly 37 miles of…
Project

US 101 - West Jefferson County - Remove Fish Barriers - Complete August 2022

Timeline: Summer 2019 - Fall 2022
  • Road
  • Completed
  • Jefferson County
This project removed barriers to fish at Steamboat Creek, Harlow Creek and Fisher Creek. New bridges carry US 101 over each creek. The improvements helps improve access to fish habitat.
Project

US 101 and SR 115/Olympic Peninsula - Chip Seal - Complete November 2022

Timeline: May 2022 - November 2022
  • Road
  • Completed
  • Clallam County
  • Grays Harbor County
  • Jefferson County
This project repaired and preserved three separate areas of two state highways. Crews will also replace failing expansion joints for the US 101 Sol Duc River Bridge in Clallam County.
Project

US 101 – Grays Harbor Creeks – Remove Fish Barrier - Complete Fall 2023

Timeline: Spring 2023 to Fall 2023
  • Road
  • Completed
  • Grays Harbor County
This project replaced six culverts under US 101 in Grays Harbor County. The culverts were located under US 101 between Aberdeen and Humptulips.
Project

US 101/Chehalis River Bridge - Bridge Bearing Replacement

Timeline: November 2024 - December 2024
  • Road
  • Pre-construction
  • Grays Harbor County
This project replaces bridge bearings on the north side of the US 101 Chehalis River Bridge in Aberdeen.
Project

US 101/Delphi Rd to I-5 - Paving and Concrete Barrier - Complete October 2022

Timeline: May 2022 - October 2022
  • Road
  • Completed
  • Thurston County
Workers repaired the surface of southbound US 101 in areas between Mud Bay and US 101 in Tumwater. Crews also made safety improvements on the southbound US 101 ramp to northbound I-5 in Tumwater

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.