• Project

SR 539 - Bay Lyn Dr to SR 546 - Paving & ADA

Project overview

This project will pave two miles of northbound and southbound State Route 539 from SR 546 (milepost 12.55) to Bay Lyn Drive (milepost 10.40). Crews working for WSDOT will rehabilitate the existing roadway surface and update the roadway striping. Additionally, pedestrian curb ramps will be evaluated to determine if they meet current ADA accessibility requirements. This is an effort to rehabilitate the existing pavement, preserve the roadway surface. Additionally, this project is subject to WSDOT’s Complete Streets requirements. We will be working to incorporate as many active transportation facilities as feasible within the project delivery timelines.

Timeline
Spring 2026 – Fall 2028
Project status
Pre-construction
Funding
$7.9 Million

What to expect

Contractor crews are scheduled to begin work in spring 2028 and end in fall 2028. Travelers can expect multiple nighttime single-lane closes with alternating traffic. 

This project will rehabilitate two miles of SR 539 in both directions from SR 546 to Bay Lyn Drive. 

Nearly 13,000 vehicles travel SR 539 in this area daily. The pavement on in both directions of SR 539 is showing signs of deterioration. Crews working for WSDOT will grind and inlay the pavement for this roadway segment with Hot Mix Asphalt to rehabilitate the existing pavement and preserve the roadway surface.