382 results

Project

US 2 – Sunset Interchange - Illumination Replacement - Complete November 2023

Timeline: July 2023 - September 2023
  • Road
  • Completed
  • Spokane County
This project will replace the luminaires on US 2 at the Sunset Highway interchange in Spokane County. The aging illumination system will be replaced with modern components including LED light fixtures which will save on maintenance and energy costs for years to come. Illumination systems will be…
Project

US 2/Corridor Safety Improvements

Timeline: Late 2025 – Late 2026
  • Road
  • Pre-construction
  • Snohomish County
This project will improve pedestrian and traffic safety on US 2 at 11 locations by replacing the signalized intersection in Sultan at US 2 and Old Owen Road/Fern Bluff Road with a roundabout and installing delineation, signing, truck aprons, curb ramps, curbing and crosswalks along the US 2…
Project

US 2/Sexton Creek to Pilchuck River Fish Passage

Timeline: Spring 2025 - Fall 2025
  • Road
  • Pre-construction
  • Snohomish County
This project will remove a fish passage barrier on US 2 at Sexton Creek just south of Three Lakes Road near Snohomish. Contractor crews working for WSDOT will remove the two existing 5-foot steel culverts that run for over 180 feet under US 2 and replace them with a fish-passable structure. This…
Project

US 395 - Chewelah to Immel Road – Paving

Timeline: September 2025 - October 2025
  • Road
  • Construction
  • Stevens County
This project will rehabilitate roughly five miles of US 395 from just north of SR 231 through Chewelah in Stevens County. The project includes removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
Project

US 395 - Lind Coulee Bridge to I-90 Southbound Lanes Only – Paving

Timeline: July 2025 - October 2025
  • Road
  • Construction
  • Adams County
This project will rehabilitate roughly 15 miles of southbound US 395 from approximately the town of Lind at Lind Coulee Bridge to approximately the town of Ritzville at the I-90/US 395 interchange in Adams County. The interchanges, both northbound and southbound, at SR 21, Paha-Packard Road, and I-…
Project

US 395 - NSC Spokane River to Columbia - New Segment - Completed August 2024

Timeline: April 2021 - August 2024
  • Road
  • Completed
  • Spokane County
This project will further expand the North Spokane Corridor south from its current end location at Columbia Avenue to the Spokane River. This includes the construction of a new interchange at Wellesley Avenue.
Project

US 395 - NSC Spokane River to Columbia - Shared Use Path - Complete March 2025

Timeline: May 2021 - Spring 2025
  • Road
  • Completed
  • Spokane County
This project extended the current Children of the Sun Trail from where it ends at Columbia Avenue south to Carlisle Avenue. This project was a design-build with the contractor as Graham Contracting.
Project

US 395 - NSC Sprague to Spokane River - Phase 1 - Completed November 2023

Timeline: July 2021 - November 2023
  • Road
  • Completed
  • Spokane County
Contractor crews will be constructing the raised freeway of the North Spokane Corridor between Mission Avenue and Ermina Avenue over Spokane Community College's parking lot. This project consists of two bridge structures, one for northbound future US 395 traffic and one for southbound future…
Project

US 395 Pioneer Memorial Bridge – Bridge Painting Stage 2 - Complete December 2024

Timeline: December 2023 - January 2025
  • Road
  • Completed
  • Franklin County
The US 395 Pioneer Memorial Bridge, also known as the Blue Bridge, needed a new coat of paint to preserve and maintain structural integrity. The paint on the Blue Bridge was faded, weathered, and damaged and this allows corrosion to occur. Crews removed the old peeling paint, cleaned and painted…
Project

US 395 – Division Wye to Wandermere – Paving – Complete Streets

Timeline: Spring 2023 - Summer 2027
  • Road
  • Pre-construction
  • Spokane County
US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required…
Project

US 395 – Hafer Road to Chewelah – Paving & Complete Streets

Timeline: July 2025 - Summer 2026
  • Road
  • Construction
  • Stevens County
This project rehabilitates roughly five miles of US 395 between Hafer Road and Sand Canyon Road just north of Chewelah, Stevens County. This project includes removing the current roadway surface which has reached the end of its usable life and repaving it with Hot Mix Asphalt (HMA).

Project

US 395 – Hatch Road to Hamilton Road – Paving

Timeline: September 2024 - August 2025
  • Road
  • Construction
  • Spokane County
This project will rehabilitate roughly nine lane miles of US 395 from Hatch Road to Hamilton Road in Spokane County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project

US 395 – Loon Lake to Hafer Road – Paving & Roundabout - Complete June 2023

Timeline: August 2022 - June 2023
  • Road
  • Completed
  • Stevens County
This project will grind and inlay a little more than 12 miles of roadway on US 395 in Stevens County between the intersection with SR 292 in Loon Lake north to Hafer Road. Crews will be grinding out the pavement and replacing the roadway surface with Hot Mix Asphalt (HMA) to create a smoother ride…
Project

US 395 – NSC I-90 Connection

Timeline: Summer 2027 - Early 2030s
  • Road
  • Not started
  • Spokane County
This is the final three projects to construct the North Spokane Corridor and connect to I-90. This is the last step to create the limited access 10.5 mile freeway north/south through Spokane that will remove freight and trips off of the local system.
Project

US 395 – NSC Spokane River Crossing

Timeline: May 2023 - 2025
  • Road
  • Construction
  • Spokane County
This project will construct the North Spokane Corridor bridge that will cross the Spokane River and connect the skyway portion near Spokane Community College to the south and at Carslie Avenue to the north of the river.
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 2

Timeline: Late 2025 - December 2028
  • Road
  • Pre-construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 2 project will construct a new divided, four-lane elevated highway from Alki Avenue to Mission Avenue with a partial interchange at Trent Avenue/SR 290. The partial interchange includes an off-ramp and an on-ramp that utilize…
Project

US 395 – NSC Sprague Ave to Spokane River – Stage 3

Timeline: August 2025 - December 2027
  • Road
  • Construction
  • Spokane County
The North Spokane Corridor (NSC) Sprague Avenue to Spokane River - Stage 3 project will construct a new divided, four-lane highway from Sprague Avenue to Alki Avenue. It is the final southern section of the NSC before the connection to Interstate 90.
Project

US 97 - Centerville Rd. to Ski Lodge Rd. Vic. - Paving - Complete September 2022

Timeline: Summer 2021 - Summer 2022
  • Road
  • Completed
  • Klickitat County
This project repaired the roadway by sealing cracks, smoothing ruts and filling potholes and created a smoother, safer driving surface for all users of the highway. Crews also paved sections along East Simcoe Drive.
Project

US 97 - Satus Creek Bridge - Bridge Replacement - Completed in October 2022

Timeline: Spring 2020 - Oct. 2022
  • Road
  • Completed
  • Klickitat County
This project replaced the aging and failing US 97 Satus Creek Bridge with a new concrete bridge structure that meets current standards, improving safety and mobility for all travelers.
Project

US 97 - Toppenish to Union Gap - Corridor Improvements

Timeline: 2021 - To be determined
  • Road
  • Construction
  • Yakima County
Since 2018, the Yakama Nation Tribal Council has signed resolutions supporting WSDOT’s proposals to add seven roundabouts at US 97 and SR 22 intersections. Roundabouts at US 97/ McDonald/Becker Road and at US 97/Jones Road are complete. Roundabouts at US 97/ SR 22, SR 22/ SR 223, and US 97/ Larue…
Project

US 97A & SR 971 Rock Slope - Scaling - Complete May 2022

Timeline: March 2022-May 2022
  • Road
  • Completed
  • Chelan County
This project will stabilize 6 slopes with rock slope scaling to remove rockfall debris adjacent to the roadway. Work will also repair and install wild life fencing and pavement.

Slopes are located on US 97A at milepost 211.26 - 211.42 and on SR 971 between milepost 10.27 and 11.49.…
Project

US 97A Illumination and Signal Cabinet Update

Timeline: September 2025
  • Road
  • Pre-construction
  • Chelan County
This project will replace the existing, failing, illumination system inside the Knapps Hill Tunnel. This project is also part of a larger endeavor that fixed and replaced signal cabinets in Leavenworth and parts of Grant County, both of which have already been completed.
In addition to the…

Slow down – lives are on the line.

Excessive speed was a top cause of work zone collisions in 2024.

Phone down, eyes up.

Work zones need our undivided attention.

It's in EVERYONE’S best interest.

96% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.