SR 305 Agate Pass Bridge Annual Maintenance

Timeline: Annually in February
  • Road
  • Kitsap County
There's a lot of work that needs to be done to keep bridges in good working order. This includes regular cleaning and inspection of the Agate Pass Bridge. The bridge, on SR 305, connects Bainbridge Island to the Kitsap Peninsula. We clean the bridge every February to keep dirt and grime from…
Project

SR 305/Sam Snyder Creek – Remove Fish Barrier - Completed May 2025

Timeline: October 2023 - May 2025
  • Road
  • Completed
  • Kitsap County
This project removed two existing 270-foot-long, 36-inch-diameter concrete pipe culverts on State Route 305 outside of Poulsbo at the Sam Snyder Creek crossing and replaced them with a single 239-foot-long steel girder bridge. General work activities included: clearing and grubbing, earthwork…
Project

SR 305/West Port Madison, Agatewood Rd, Adas Will Ln – Safety Improvements - Completed November 2024

Timeline: October 2023 - November 2024
  • Road
  • Completed
  • Kitsap County
WSDOT built two modern roundabouts on Bainbridge Island at the intersections of SR 305 and Northeast West Port Madison Road/Northeast Seabold Road and SR 305 and Northeast Adas Will Lane. The improvements included curbing and a center median at Agatewood Road Northeast which permanently makes that…
Project

SR 4 – Crawford Bridge Pedestrian Illumination

Timeline: Spring 2025 - Spring 2026
  • Road
  • Construction
  • Cowlitz County
In February 2026, construction started to replace lighting along both directions of the State Route 4 Peter Crawford Bridge to improve safety for people who walk, bike or roll across it after dark. Besides removing old equipment and installing the new lights, crews will upgrade the electrical…
Project

SR 401 - 2.3 Miles S. of Bean Creek Bridge - Slope Stabilization

Timeline: February 2021 - Fall 2024
  • Road
  • Construction
  • Pacific County
On Tuesday, Feb. 23, 2021, due to roadway settlement caused by heavy rainfall, both directions of State Route 401 (also known as the Lewis and Clark Trail Highway) between the Astoria-Megler Bridge and Naselle were closed.

In spring 2021, emergency contractor crews were able to…
Project

SR 410 White River Bridge - Emergency - Complete October 2025

Timeline: August-October 2025
  • Road
  • Completed
  • King County
The SR 410 White River Bridge between Buckley and Enumclaw reopened Friday, Oct. 17, after contractor crews completed repairs. On Aug. 18, 2025, an over-height vehicle struck several of the support beams on the bridge, causing serious damage that required us to close the bridge. After a complete…
Project

SR 410 – East of Enumclaw Emergency Road Repair - Complete December 2025

Timeline: December 2025
  • Road
  • Completed
  • King County
In December 2025, a flooding event from Boise Creek just west of Enumclaw damaged State Route 410 at milepost 26.6. The road was closed Dec. 10, 2025 after the eastbound lanes were washed away. On Dec. 16, the road was reopened in a single-lane alternating traffic configuration using the westbound…
Project

SR 411 Cowlitz River Bridge – Replace Bridge Deck

Timeline: Feb. 2023 - Fall 2024
  • Road
  • Construction
  • Cowlitz County
Starting in early 2023, contractor crews will kick off the much-anticipated project to enhance the SR 411 Cowlitz River Bridge, also known as the A Street Bridge or the PH-10 Bridge. This vital bridge connects the City of Castle Rock to the west side of the Cowlitz River.

The primary…
Project

SR 411—0.09 Miles S. of Beverly Hts. Rd—Culvert Replacement Emergency - Complete October 2025

Timeline: July 2025 - Nov. 2025
  • Road
  • Completed
  • Cowlitz County
In fall 2025 contractors working for WSDOT will begin work to remove and replace a failing culvert underneath SR 411, better known as West Side Highway, just south of Castle Rock, in Cowlitz County.

On Friday, Oct. 24, 2025, construction to replace the failing culvert was completed…
Project

SR 432 - Industrial Way Vicinity to Cowlitz River - Paver - Completed July 2024

Timeline: Spring 2023 - Summer 2024
  • Road
  • Completed
  • Cowlitz County
In summer 2023 contactor crews working for the Washington State Department of Transportation resurfaced a nearly 2.5 mile stretch of SR 432 between milepost 7.19 near Industrial Way and milepost 7.19 near the Cowlitz River, in Longview, WA. Crews also resurfaced several off- and on-ramps along…
Project

SR 500 - NE 42nd and 54th Intersection Improvements - Completed Summer 2025

Timeline: Summer 2024 - Spring 2025
  • Road
  • Completed
  • Clark County
This project restored the north/south connection across State Route 500 at the Northeast Stapleton Road/Northeast 54th Avenue intersection in Vancouver by constructing a new pedestrian overcrossing that meets the Americans with Disabilities Act. Restoring access across the highway for people who…
Project

SR 500 - NE Robinson Rd and NE 3rd St - Intersection Safety Improvements

Timeline: Summer 2018 - Mid-2027
  • Road
  • Not started
  • Clark County
Growth and development in eastern Clark County is contributing to an increase in traffic volumes and traffic related crashes along SR 500 - between the Northeast Robinson Road and Northeast 3rd Street intersections. To keep people moving safely, reduce travel times and crashes and to ensure this…
Project

SR 500/162nd Ave to 166th Ave – Safe Routes to School - Complete Spring 2024

Timeline: Spring 2022 - Spring 2024
  • Road
  • Completed
  • Clark County
Washington State Department of Transportation’s contractor, Thompson Bros. Excavating, successfully constructed a new shared-use path on the south side of State Route 500, also known as Northeast Fourth Plain Boulevard, between Northeast 162nd and Northeast 166th avenues, allowing those who bike,…
Project

SR 503 / NE Rock Creek Rd Intersection Improvements - Completed 2024

Timeline: Winter 2021 - Fall 2024
  • Road
  • Completed
  • Clark County
This project improved safety at the intersection of State Route 503 and Northeast Rock Creek Road by installing a compact roundabout. After reviewing five-years of traffic data that included severe injuries, a fatality, and many cases of property damage, this location was identified for improvement…
Project

SR 503 Prairie High School Pedestrian Signal - Completed 2025

Timeline: November 2023 - February 2025
  • Road
  • Completed
  • Clark County
This project constructed a pedestrian hybrid signal, creating safer access for pedestrians crossing State Route 503 to and from Prairie High School and the nearby transit stop.
Project

SR 503 Spur – Culvert Failure

Timeline: Dec. 2023 - Jan. 2024
  • Road
  • Construction
  • Cowlitz County
  • Skamania County
On Saturday, Dec. 23, following the installation of a new 48-inch culvert, stabilizing, and back filling the failure area with rock, and reconstructing the roadway, NW Construction General Contracting, Inc., the emergency contractor has successfully restored two lanes of travel, and lifted the…
Project

SR 504 South Coldwater Slide – Spirit Lake Outlet Bridge Washout

Timeline: May 2023 - 2026
  • Road
  • Pre-construction
  • Cowlitz County
  • Skamania County
Shortly after 9 p.m. Sunday, May 14, 2023, more than 300,000 cubic yards of debris from an adjacent hillside fell approximately 2,000 feet above SR 504 and covered the roadway with rock, mud, ice and water, causing catastrophic damage to the 85-foot Spirit Lake Outlet Bridge at milepost 49.
Project

SR 506/1.5 Miles N of Frontage Rd to I-5 – Emergency Bridge Repair

Timeline: Summer 2022 - Mid-to-late 2023
  • Road
  • Construction
  • Lewis County
On Tuesday, July 6, 2021, an over height load was traveling southbound on I-5 when it struck and damaged the SR 506/Toledo-Vader Road overpass that spans over the interstate. Following the bridge strike, WSDOT bridge inspectors determined that the damage was extensive and they closed the overpass…
Project

SR 507 – Skookumchuck River Bridge to Thurston County Line – Paving and Complete Streets Pre-Design

Timeline: January 2025- June 2026
  • Road
  • Pre-construction
  • Lewis County
State Route 507 (SR 507) between the Skookumchuck River Bridge and the Thurston County line within Centralia and unincorporated Lewis County is in need of pavement preservation work to protect the public’s investment in the highway. This work is necessary to keep the roadway in good condition and…
Project

SR 509 Completion Project

Timeline: 2015-2029
  • Road
  • Construction
  • King County
The SR 509 Completion Project in King County is part of the Puget Sound Gateway Program, which also includes the SR 167 Completion Project in Pierce County. Together, these projects complete two of the Puget Sound region’s most critical freight corridors and improve access to I-5, the ports of…
Project

SR 509/Miller Creek fish passage

Timeline: 2026-2031
  • Road
  • Pre-construction
  • King County
Reconnecting waterways where our roads act as barriers is a priority for the state. In western Washington, that means building hundreds of fish passable structures under state highways to create habitat essential for meeting fish recovery goals.

A culvert below State Route 509 west…
Project

SR 510 - Emergency Culvert Repair - Completed May 2025

Timeline: Spring 2025
  • Road
  • Completed
  • Thurston County
WSDOT replaced a culvert that failed beneath SR 510 near Lacey.
Project

SR 510 - Yelm Loop - New Alignment Phase 2

Timeline: Summer 2026 - Fall 2029
  • Road
  • Pre-construction
  • Thurston County
Crews will build the three remaining miles of SR 510 between Cullens Road and 170th Street Southeast. The roadway will have two lanes. The project will also include a new shared-use path for people who walk, bike or roll.
Project

SR 510/McAllister Ct SE & Rockcress Drive - Roundabout

Timeline: Summer 2026 - Fall 2026
  • Road
  • Pre-construction
  • Thurston County
Crews will build a single-lane roundabout on State Route 510 at the intersection of McAllister Court SE/Rockcress Drive SE in Lacey. The improvement will reduce the potential for collisions.
Project

SR 516/Barnes Creek fish passage - Complete Fall 2024

Timeline: 2021-2024
  • Road
  • Completed
  • King County
This project replaced a 2-foot-diameter clay culvert that blocked fish passage with a 20-by-9-foot cement box culvert that allows fish and other wildlife to move freely up and down the creek. The project also placed natural features into the Barnes Creek streambed.
Project

SR 520 - Floating Bridge and Approaches Bridge Decks and Soffit Sealer - Complete Fall 2024

Timeline: Summer 2024 - Fall 2024
  • Road
  • Completed
  • King County
Crews working for WSDOT applied spray sealant to the bridge deck and soffits near expansion joints in both directions of the State Route 520 Evergreen Point floating bridge. The sealant will protect the bridge from corrosion, prolong its service life and help keep the bridge in a state of good…
Major Project

SR 520 Bridge Replacement and HOV Program

Timeline: 2011 - 2031
The SR 520 Bridge Replacement and HOV Program enhances travel safety and mobility with modern, structurally stronger bridges, as well as substantial transit and roadway improvements along this urban corridor. Built in stages, the improvements extend from I-405 in Bellevue to I-5 in Seattle.
Project

SR 520 Eastside Transit and HOV Project - Complete Summer 2015

Timeline: Construction began 2011; completed in 2015
  • Road
  • Completed
  • King County
This project added bus/carpool lanes in both directions between 108th Avenue Northeast in Bellevue and Lake Washington’s eastern shore. The project also built three landscaped, community-connecting highway lids over the highway, two transit stations in the highway median and the first leg of a…
Project

SR 520 Floating Bridge and Landings Project - Complete Summer 2017

Timeline: Bridge construction began in spring 2012 and was completed in summer 2017.
  • Road
  • Completed
  • King County
We replaced the world's longest floating bridge – a four-lane, 1960s-era structure – with a safer, six-lane bridge designed to withstand stronger windstorms and waves. Opened in April 2016, the new bridge also added shoulders for disabled vehicles and a separated, 14-foot-wide path for…
Project

SR 520 I-5 Express Lanes Connection Project - Completed

Timeline: August 2021 - May 2025
  • Road
  • Completed
  • King County
The SR 520/I-5 Express Lanes Connection Project will create a dedicated reversible transit and carpool connection between SR 520 and the I-5 Express Lanes, along with a reversible transit/carpool ramp at the I-5/Mercer Street interchange.

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.