Project overview
Workers repaired the surface of southbound US 101 in areas between Mud Bay and US 101 in Tumwater. Crews also made safety improvements on the southbound US 101 ramp to northbound I-5 in Tumwater
What to expect
Contractor crews replaced asphalt on the left lane of southbound US 101 between Mud Bay Road and Crosby Boulevard. Crews also installed fresh asphalt in the right lane of US 101 between Black Lake Boulevard and the on-ramp to southbound I-5. Three highway ramps also were paved. Crews also installed new barrier on the southbound US 101 on-ramp to northbound I-5 in Tumwater.