Project overview
US 395 from the US 2 Wye to Wandermere Road – milepost 164.5 to 167.07 – has been identified as needing the asphalt concrete pavement rehabilitated to preserve the roadway structure and the public investment in highways. The Complete Streets screening process found this project required implementation of the Complete Streets requirement for the full length of the project corridor.
What to expect
This project is currently in the pre-design phase to identify, select, and begin the design of the necessary Complete Streets strategies to implement as part of a paving project for this corridor. The addition of Complete Streets strategies to the paving project aims to improve the active transportation environment along and across the project corridor.
Pre-design is expected to be completed by the end of December 2024, with full design staring in 2025. This project will be delivered using the Design-Bid-Build process, with construction anticipated to begin in the spring of 2026. This schedule is preliminary and may change depending on the results of the pre-design phase.
Project map location for the US 395 - Division Wye to Wandermere Road - Paving and Complete Streets project in Spokane County.