SR 26 and First Avenue intersection - Safety Improvement

Timeline: June 2025-October 2025.
  • Road
  • Pre-construction
  • Adams County
The project will install a compact roundabout at the intersections of SR 26 and First Avenue. The I2 crash prevention program for systemic treatment at intersection selected this location for a compact roundabout due to existing crash patterns.
Project

SR 26 Dusty to Colfax - Add Climbing Lanes - Complete October 2024

Timeline: June 2022 - September 2024
  • Road
  • Completed
  • Whitman County
This project will create three truck climbing lanes, or passing lanes, for vehicles who travel along SR 26 between Dusty and Colfax in Whitman County. One climbing lane will be built westbound and two will be built eastbound on SR 26. The Washington legislature approved the addition of a fourth…
Project

SR 26 – 1st Avenue

Timeline: June 2023 - Fall 2025
  • Road
  • Pre-construction
  • Adams County
This project will install a compact roundabout at the intersection of SR 26 and 1st Avenue. This intersections was selected due to existing crash patterns.

This roundabout will increase the safety and mobility of this intersection. The current configuration has many turning…
Project

SR 26 – Dusty to Colfax – Add fourth climbing lane

Timeline: June 2024 - September 2024
  • Road
  • Construction
  • Whitman County
This project will create a fourth truck climbing lane, or passing lane, for vehicles who travel along SR 26 between Dusty and Colfax in Whitman County. Three climbing lanes were constructed on this section of SR 26 between 2022 and 2023. The Washington legislature approved the addition of a fourth…
Project

SR 270 – Bishop Blvd. to Idaho State Line - Paving - Complete September 2023

Timeline: Spring 2023 - Summer 2023
  • Road
  • Completed
  • Whitman County
This project will rehabilitate roughly 6 miles of SR 270 from Bishop Blvd. to the Idaho State Line in Whitman County. Once the project is completed by removing the surface of the existing pavement, repairing portions of the pavement through crack sealing, paving with Hot Mix Asphalt (HMA), and…
Project

SR 28 White Trail Rd. Roundabout - Complete June 2023

Timeline: 2020- Fall 2023
  • Road
  • Completed
  • Grant County
This project improved safety by constructing a roundabout at the intersection of SR 28 and White Trail Rd. west of the City of Quincy.
Project

SR 28 - East Wenatchee Corridor Improvements

Timeline: Spring 2020 - Winter 2029
  • Road
  • Pre-construction
  • Douglas County
The East Wenatchee Corridor Improvement project will enhance safety and mobility along Sunset Highway in East Wenatchee between 9th Street and Hadley Street. This project includes Stages 3 & 4 of the larger “Eastside Corridor Project” to improve north-south mobility through East Wenatchee.…
Project

SR 282 Nat Washington Blvd - Safety Improvement

Timeline: June 2026-September-2026
  • Road
  • Pre-construction
  • Grant County
This project will install a compact roundabout at the intersection of SR 282 and Nat Washington Way, to enhance safety and reduce collisions. Installing a roundabout has proven safer than the existing turns and safer than installing traffic signals.
Project

SR 290 - Spokane River East Trent Bridge - Complete July 2023

Timeline: June 2020 - July 2023
  • Road
  • Completed
  • Spokane County
The East Trent Bridge spanning over the Spokane River near Gonzaga University campus is due for replacement. Crews will demolish and rebuild the structure which has stood since 1910.
Project

SR 3 - Chico Creek - Remove Fish Barriers

Timeline: Fall 2021 - Fall 2024
  • Road
  • Construction
  • Kitsap County
This project is part of WSDOT's ongoing Fish Passage Barrier Removal Program where construction projects remove barriers to fish. The Chico Way/SR 3 interchange has several barriers to fish under both directions of SR 3 and under the highway's southbound on- and off-ramps. This…
Project

SR 3 - Freight Corridor - New Alignment

Timeline: Summer 2026 - Winter 2028
  • Road
  • Pre-construction
  • Mason County
Crews will create a new route for SR 3 while maintaining the existing state highway through Belfair as a business loop. The proposed 6-miles of new highway would provide a new option for drivers to travel around and not through Belfair. The new portion of SR 3 is a Limited Access Corridor. A…
Project

SR 3, SR 16 and SR 166, Gorst Vicinity - Remove Fish Barriers

Timeline: 2026 - 2029
  • Road
  • Pre-construction
  • Kitsap County
This project will remove barriers to fish migration under State Route 3, SR 16 and SR 166 in Kitsap County. New bridges or larger culverts will replace five outdated culverts. Work includes construction of a roundabout at the SR 3, SR 16 and West Sam Christopherson Avenue intersection.
Project

SR 3/SR 304 to SR 303 - Paving - Complete October 2023

Timeline: July 2023 - October 2023
  • Road
  • Completed
  • Kitsap County
Workers repaved sections of northbound SR 3 between Bremerton and Silverdale. Repairs also were made at five bridges.
Project

SR 302 - E of Elgin Clifton Rd to SR 16 - Remove fish barriers, paving and ADA compliance

Timeline: Spring 2019 - Fall 2022
  • Road
  • Construction
  • Pierce County
In summer 2022, our contractor began fish barrier corrections to replace two outdated culverts at Little Minter Creek under State Route 302. Since 2019, crews have completed paving and ADA ramp work for eight miles of SR 302 in addition to correcting three identified barriers to salmon and resident…
Project

SR 302/Victor Creek - Remove Fish Barrier

Timeline: Spring 2025 - Fall 2025
  • Road
  • Pre-construction
  • Mason County
As part of WSDOT's efforts to remove barriers to fish, this project addresses a barrier to fish under SR 302 near Victor Creek
Project

SR 305 Agate Pass Bridge Annual Maintenance

Timeline: February 20-23, 2024
  • Road
  • Construction
  • Kitsap County
There's a lot of work that needs to be done to keep bridges in good working order. This includes regular cleaning and inspection of the Agate Pass Bridge. The bridge, on SR 305, connects Bainbridge Island to the Kitsap Peninsula. We clean the bridge every February to keep dirt and grime from…
Project

SR 305/Murden Creek - Remove Fish Barrier - Completed November 2023

Timeline: August 2022 - November 2023
  • Road
  • Completed
  • Kitsap County
This project removed barriers to fish under SR 305 on Bainbridge Island. A culvert was replaced with a new bridge. The work opened almost 1.5 miles of potential habitat on Murden Creek. The creek is a top salmon stream on Bainbridge Island and is a tributary to Murden Cove.
Project

SR 305/Sam Snyder Creek – Remove Fish Barrier

Timeline: October 2023 - Spring 2025
  • Road
  • Construction
  • Kitsap County
This project will remove two existing 270-foot-long, 36-inch-diameter concrete pipe culverts on State Route 305 outside of Poulsbo at the Sam Snyder Creek crossing and replace them with a single 239-foot-long steel girder bridge. General work activities include: clearing and grubbing, earthwork…
Project

SR 305/West Port Madison, Agatewood Rd, Adas Will Ln – Safety Improvements

Timeline: October 2023 - October 2024
  • Road
  • Construction
  • Kitsap County
WSDOT will build two modern roundabouts on Bainbridge Island at the intersections of SR 305 and Northeast West Port Madison and SR 305 and Northeast Adas Will Lane. The improvements include a feature at the intersection of Agatewood Road Northeast which will become a right in/right out intersection…
Project

SR 4 - Skamokawa Vic to 0.3 Miles West of SR 432 - Chip Seal and Highway Modifications - Complete July 2022

Timeline: May 2021 - July 2022
  • Road
  • Completed
  • Wahkiakum County
In summer 2021, contractor crews working for WSDOT resurfaced roughly a 25-mile stretch of State Route 4, between Skamokawa and State Route 432 near west Longview, between mileposts 29.77 to 54.98. Project work and highway modifications continued during the 2022 construction season and is now…
Project

SR 401 - 2.3 Miles S. of Bean Creek Bridge - Slope Stabilization

Timeline: February 2021 - Fall 2024
  • Road
  • Construction
  • Pacific County
On Tuesday, Feb. 23, 2021, due to roadway settlement caused by heavy rainfall, both directions of State Route 401 (also known as the Lewis and Clark Trail Highway) between the Astoria-Megler Bridge and Naselle were closed.

In spring 2021, emergency contractor crews were able to…
Project

SR 410 Dry Creek Vicinity - Emergency Slide Repair - Complete October 2023

Timeline: January 2023 - October 2023
  • Road
  • Completed
  • Pierce County
Contractor crews working for WSDOT installed a 10-foot, corrugated metal pipe under State Route 410 to allow Dry Creek to pass beneath the roadway along its new channel. This is the second part of emergency repairs following a debris flow in fall 2022, which permanently changed the course of Dry…
Project

SR 411 Cowlitz River Bridge – Replace Bridge Deck

Timeline: Feb. 2023 - Fall 2024
  • Road
  • Construction
  • Cowlitz County
Starting in early 2023, contractor crews will kick off the much-anticipated project to enhance the SR 411 Cowlitz River Bridge, also known as the A Street Bridge or the PH-10 Bridge. This vital bridge connects the City of Castle Rock to the west side of the Cowlitz River.

The primary…
Project

SR 432 - Industrial Way Vicinity to Cowlitz River - Paver - Completed July 2024

Timeline: Spring 2023 - Summer 2024
  • Road
  • Completed
  • Cowlitz County
In summer 2023 contactor crews working for the Washington State Department of Transportation resurfaced a nearly 2.5 mile stretch of SR 432 between milepost 7.19 near Industrial Way and milepost 7.19 near the Cowlitz River, in Longview, WA. Crews also resurfaced several off- and on-ramps along…
Project

SR 433 Lewis and Clark Bridge Finger Joint Replacement Project - Completed July 2023

Timeline: June 2022 - July 2023
  • Road
  • Completed
  • Cowlitz County
On Sunday, July 16, 2023, bridge crews fully closed the SR 433 - Lewis and Clark Bridge, also known as the Rainier Bridge, spanning across the Columbia River between Longview, WA, and Rainier, OR, for four days. The closure aimed to replace the steel expansion joints that allowed the structure to…
Project

SR 500 - NE 182nd Ave - Intersection Improvements - Complete Fall 2022

Timeline: Spring 2021 - Fall 2022
  • Road
  • Completed
  • Clark County
Beginning in summer 2022, contractor crews from Thompson Bros. Excavating worked to construct a roundabout in east Vancouver, between the intersection of Fourth Plain Boulevard, also known as SR 500 and Northeast 182nd Avenue. Crash data collected over a five-year timeframe between 2013 to 2017…
Project

SR 500 - NE 42nd and 54th Intersection Improvements

Timeline: Summer 2024 - Summer 2025
  • Road
  • Construction
  • Clark County
This project will restore the north/south connection across State Route 500 at the Northeast Stapleton Road/Northeast 54th Avenue intersection in Vancouver by constructing a new pedestrian overcrossing that meets the Americans with Disabilities Act. Restoring access across the highway for people…
Project

SR 500 - NE Robinson Rd and NE 3rd St - Intersection Safety Improvements

Timeline: Summer 2018 - Fall 2026
  • Road
  • Not started
  • Clark County
Growth and development in eastern Clark County is contributing to an increase in traffic volumes and traffic related crashes along SR 500 - between the Northeast Robinson Road and Northeast 3rd Street intersections. To keep people moving safely, reduce travel times and crashes and to ensure this…
Project

SR 500/162nd Ave to 166th Ave – Safe Routes to School - Complete Spring 2024

Timeline: Spring 2022 - Spring 2024
  • Road
  • Completed
  • Clark County
Washington State Department of Transportation’s contractor, Thompson Bros. Excavating, successfully constructed a new shared-use path on the south side of State Route 500, also known as Northeast Fourth Plain Boulevard, between Northeast 162nd and Northeast 166th avenues, allowing those who bike,…
Project

SR 501 - I-5 to Port of Vancouver - Intersection and Profile Improvements - Complete - Sept. 2023

Timeline: Spring 2019 - Fall 2023
  • Road
  • Completed
  • Clark County
Previously, oversized freight vehicles had to divert from this section of Mill Plain Boulevard (SR 501) onto city streets due to high points in the roadway and limited overhead clearances. Corridor modifications increased safety along the corridor for all modes of transportation. Improvements…

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.