October bid tabulations
A record of the engineer's estimate and bid amount for each project, by bid item and contractor for the month of October.
2024
- Contract XE3573 - SR 20 Spur, Shaw Ferry Terminal - Trestle Repair (PDF 57KB)
- Contract XE3572 - US 395 / NSC 2024 Demo No 2 (PDF 62KB)
- Contract XE3569 - SR 503/Pedestrian Signal Prairie High School Vicinity (PDF 163KB)
- Contract QR4271 - SR 171, Moses Lake - RRFB Retrofit to Mast Arm (PDF 141KB)
2023
No bid tabulations
2022
- Contract 9881 - Executed 11/30/2022 Aberdeen/Westport Signals and ADA (PDF 152KB)
- Contract 9884 - Executed 11/30/2022 OR Breakaway Cable Terminal Replacement - Freeways (PDF 157KB)
- Contract 9880 - Executed 11/22/2022 68th Ave S Vicinity Pedestrian Safety (PDF 247KB)
- Contract 9873 - Executed 11/30/2022 Anacortes Ferry Terminal Tollbooth Replacement (PDF 167KB)
- Contract 9872 - Executed 11/30/2022 Barnes Creek Fish Passage (PDF 294KB)
2021
- CONTRACT 9724 - All Bids Rejected 10/14/2021 I-205 TO SE 164TH AVENUE AUXILIARY LANES (PDF 199KB)
- CONTRACT 9728 - Executed 12/07/2021 FREEWAY / ARTERIAL INTEGRATED CORRIDOR MANAGEMENT 2019-2021 (PDF 142KB)
- CONTRACT 9735 - Executed 12/13/2021 SR 167 COMPLETION DEMO 8 (SMALL WORKS ROSTER) (PDF122KB)
- CONTRACT 9729 - Executed 11/17/2021 EMBANKMENT EROSION REPAIR (SMALL WORKS ROSTER) (PDF 139KB)
- CONTRACT 21A824 - Executed 10/28/2021 SR 204 INTERSECTION IMPROVEMENTS DEMO 1 (SMALL WORKS ROSTER) (PDF 120KB)
2020
- CONTRACT 9587 - Executed 12/02/2020 NSC SPOKANE RIVER TO COLUMBIA
- CONTRACT 9595 - Executed 11/24/2020 MORSE CREEK VICINITY SAFETY IMPROVEMENTS
- CONTRACT 9598 - Executed 11/24/2020 SPOKANE PORT OF ENTRY WEIGH STATION SCALE PIT REPAIRS
- CONTRACT 9597 - Executed 11/06/2020 SR 516 VIC TO S 204TH - DEMO #3 (SMALL WORKS ROSTER)
- CONTRACT 9594 - Executed 11/06/2020 MCELROY COULEE CROSSING REPLACE DRAINAGE STRUCTURE
2018
- CONTRACT 9319 - Executed 11/19/2018 I-90 468TH AVE SE TO W SUMMIT RD WB REHAB CONCRETE
- CONTRACT 9318 - Executed 11/30/2018 - FERRY DOCK RD - PASSENGER DROP-OFF & ADA IMPROVEMENT
- S52 AIP 009 - METHOW VALLEY STATE AIRPORT WEST GENERAL AVIATION APRON EXPANSION
2017
- CONTRACT 9154 - Executed 10/25/2017 SR 26, SR 26 & US 195 SAFETY IMPROVEMENTS (Small Works Roster)
- CONTRACT 9147 - Executed 11/15/2017 I-5, S 188TH ST TO NE 80TH ST CAMERA INSTALLATION (Small Work Roster)
- CONTRACT 9144 - Executed 11/21/2017 I-5 ET AL, NWR CABLE BARRIER UPGRADE
- CONTRACT 9161 - Executed 11/13/2017 I-5, LAKE SAMISH VIC STORMWATER PIPE REPLACEMENT
- CONTRACT 9156 - Executed 11/13/2017 SR 522, ELLIOTT ROAD VIC SANDFILTER
- CONTRACT 9151 - Executed 11/20/2017 I-90, FLOATING BRIDGES REPLACE ANCHOR CABLES
- CONTRACT 9155 - Executed 11/20/2017 US 12, US 101 & SR 109. ABERDEEN/HOQUIAM SIGNALS REBUILD SIGNALS
- CONTRACT 9150 - Executed 11/22/2017 SR 525, MUKILTEO FERRY TERMINAL (PHASE 2) DEEP STORMWATER UTILITY CONSTRUCTION
2016
- CONTRACT 8967 - Executed 10/27/16 SR520/SR202, EMERGENCY TREE REMOVAL(Small Works Roster)
- CONTRACT 8969 - Executed 10/19/2016 SR 18, GREEN RIVER BRIDGE VIC EMERGENCY SLIDE REPAIR
- CONTRACT 8970 – Executed 11/9/2016 15-17 OR REGION WIDE I/S IMPLEMENTATION PROGRAM & BASIC SAFETY – SIGNING
- CONTRACT 8974 – Executed 11/9/2016 I-5 & SR 503, INTERSECTION IMPROVEMENTS
- CONTRACT 8972 – Executed 12/2/2016 PCC RAILROAD REHABILITATION P&L BRANCH/WIM BRANCH
- CONTRACT 8968 – Executed 11/17/2016 SR 104, HOOD CANAL BRIDGE SPECIAL REPAIR – GEAR BOX
2015
- CONTRACT 8807 - Executed 11/13/15 SR 9 ET AL, WHATCOM COUNTY BST
- CONTRACT 8808 - Executed 11/17/15 SR 9 ET AL, MT BAKER AREA BST 2016
- CONTRACT 8810 - Executed 11/13/15 I-5, BIRCH BAY LYNDEN RD BRIDGE-BRIDGE REPAIR
- CONTRACT 8813 - Executed 11/24/15 FRONT STREET BRIDGE 90/66S GIRDER REPLACEMENT
2014
- CONTRACT 8667 - Executed 10/29/14 SR 305, BAINBRIDGE FERRY TERMINAL SLIP MAINTENANCE REPAIRS
- CONTRACT 8668 - Executed 10/31/14 OR REGION WIDE BASIC SAFETY GUARDRAIL & SIGNING
- CONTRACT 8666 - Executed 10/31/14 MT. BAKER TUNNEL OPERATIONS BUILDING HVAC
- CONTRACT 8672 - Executed 10/23/14 US 12, EAST OF CLEAR CREEK FALLS VIEWPOINT CULVERT REINFORCEMENT
- CONTRACT 8662 - Executed 12/3/14 I-90, TWO-WAY TRANSIT & HOV OPERATIONS STAGE 3
- US 395, NSC 2014 DEMO NO 3
2013
- CONTRACT 8533 - Executed 11/12/13 SR 20 SPUR, LOPEZ ISLAND FERRY TERMINAL UPLAND ADA COMPLIANCE IMPROVEMENTS
- CONTRACT 8532 - All Bids Rejected 10/24/13 I-5, SR 18 I/C TO S 288TH ST SEISMIC RETROFIT
- US 395, NSC 2013 DEMO NO 2
- CONTRACT 8539 - Executed 11/20/13 SR 904, BETZ RD TO I-90 - PAVING
- CONTRACT 8541 - Executed 12/5/13 SR 104, EDMONDS FERRY TERMINAL ENTRY REPLACEMENT
2012
- CONTRACT 8372, Executed 11/6/12 PCC RAILROAD REHABILITATION CW LINE
- CONTRACT 8375, Executed 11/28/12 SR 24, S OF OTHELLO SAGEHILL WASTEWAY DECK REPAIR
- Executed 11/2/12 US 395, SOUTHSIDE OF I-90 DEMO NO. 8
- CONTRACT 8377 - Executed 12/3/12 SR 20, SNC RAILROAD BRIDGE SEISMIC RETROFIT
- CONTRACT 8374 - Executed 11/30/12 SR 20 SPUR, FRIDAY HARBOR TERMINAL PEDESTRIAN & SAFETY IMPROVEMENT
- CONTRACT 8380 - Executed 11/28/12 SR 16, TACOMA NARROWS BRIDGE SPECIAL REPAIR
2011
- Executed 10/18/11 MARKET STREET COMMERCIAL DEMO NO. 2
- CONTRACT 8220 - Executed 11/23/11 SR 16, OLYMPIC DRIVE NW BRIDGE - SPECIAL REPAIR
- CONTRACT 8224 - Executed 11/18/11 SEA-TAC REST AREA STAIRS & RAMP REPLACEMENT
- CONTRACT 8218 - Executed 11/23/11 SR 167, 24TH ST E BRIDGE SPECIAL REPAIR
- NORTH OF RIVER COMMERCIAL AND RESIDENTIAL DEMO NO. 3
2010
- CONTRACT 8032 Executed 10/29/10 US 101, SIMPSON AVE. BRIDGE PIER REPAIRS
- CONTRACT 8005 Executed 11/2/10 OLYMPIC REGION BASIC SAFETY RESTORATION 2010
- CONTRACT 8013 Executed 10/28/10 SR 26, GRANT COUNTY LINE TO SR 17 PAVING
- CONTRACT 8007 Executed 11/9/10 SR 302, KEY PENINSULA HWY TO PURDY VIC SAFETY AND CONGESTION - STAGE 1
- CONTRACT 8008 Executed 11/9/10 I-205/I-5 CLARK COUNTY RAMP PAVING
- CONTRACT 8019 Executed 11/10/10 WSF, MUKILTEO FERRY TERMINAL TRANSFER SPAN MECHANICAL AND ELECTRICAL
- CONTRACT 8010 Executed 11/1/10 SR 532, NORTH LEQUE ISLAND SLOPE PROTECTION
- CONTRACT 8025 Executed 11/16/10 MOTTMAN MODULAR RE-ROOF AND HVAC RENOVATION
- CONTRACT 8015 Executed 12/1/10 EASTERN REGION CHIP SEAL 2010 - HMA CONVERSIONS
- CONTRACT 7963 Executed 11/29/10 EASTSIDE TRANSIT AND HOV DESIGN-BUILD
- CONTRACT 8020 Executed 11/15/10 WSF, ANACORTES FERRY TERMINAL OVERHEAD LOADING REHABILITATION
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED INCLUDES WSU STUDENT BIDS
- CONTRACT 8024 Executed 11/16/10 NCR TRAFFIC CONTROLLER REPLACEMENT 2011
- CONTRACT 8017 Executed 11/12/10 US 395, LEE RD TO VIC JCT I-90 PAVING
- CONTRACT 8018 Executed 11/22/10 I-90, VIC GEIGER RD TO SPOKANE VIADUCT PCCP REHAB
- CONTRACT 8023 Executed 11/3/10 I-90, WB ALTAMONT VARIABLE MESSAGE SIGN REPLACEMENT
- CONTRACT 8026 SR 21, 1.4 MILES N OF MANILA CR RD - SLOPE STABILIZATION
- SR 31, PEND OREILLE COUNTY - WATERLINE REPLACEMENT
2009
- CONTRACT 7819 Executed 10/21/09 US 97A NORTH OF WENATCHEE SLOPE STABILIZATION
- 2009 ER DEMOLITION NO. 3
- CONTRACT 7828 Executed 11/16/09 HAVANA STREET OVERCROSSING - PHASE 1
- CONTRACT 7832 Executed 11/2/09 SR 28 & US 2/97, INTERSECTION IMPROVEMENTS BOX CULVERT INSTALLATION
- CONTRACT 7834 Executed 11/8/09 SR 8, ELMA TO US 101 - CABLE BARRIER
- CONTRACT 7831 Executed 11/13/2009 WSF, SEATTLE FERRY TERMINAL SLIP 2 LOADING DECKING REPLACEMENT
- CONTRACT RW 4997 REPUBLIC DEMOLITION
- CONTRACT 7822 Executed 11/23/09 I-5, MARTIN WAY TO 48TH ST - NB & SB CONCRETE PAVEMENT REHABILITATION
- CONTRACT 7830 Executed 11/23/09 SR 16, UNION AVE TO JACKSON AVE ROADSIDE RESTORATION
2008
- CONTRACT 7594 Executed 10/21/08 I-5/SR16, WESTBOUND NALLEY VALLEY I/C
- CONTRACT 7615 Executed 10/29/087 ORONDO MAINTENANCE FACILITY BUILDING ADDITION
- CONTRACT RW-4662 2008 ER DEMOLITION NO 2
- CONTRACT 7616 Executed 11/16/08 SR 26, PALOUSE RIVR BR-DECK REPAIR
- CONTRACT 7609, Executed 11/13/09 WSF, EDMOND FERRY TERMINAL UNOCAL PIER REMOVAL
- CONTRACT SR 20, HADLEY ROAD VICINITY WASHOUT EMERGENCY CONTRACT
- CONTRACT 7610 Executed 11/13/08 US 395, NSC -US 2 LOWERING
- CONTRACT 7620 Executed 11/12/08 US 97, NORTH OF BLEWETT PASS SLOPE STABILIZATION
- CONTRACT 7614 WSF, EAGLE HARBOR MAINTENANCE BUILDING REMODEL AND DOCK REPAIRS
2007
- CONTRACT 7408-- WSF, KEYSTONE FERRY TERMINAL GENERATOR POWER INSTALLATION
- CONTRACT 7409-- Executed 10/18/07 US 97, ROADSIDE SAFETY IMPROVEMENTS
- CONTRACT 7412-- Executed 10/26/07 I-90, INDIAN JOHN HILL REST AREA WATER IMPROVEMENT
- CONTRACT 7410-- WSF, MUKILTEO FERRY TERMINAL INNER DOLPHIN REPLACEMENT
- CONTRACT 7411-- Executed 11/7/07 SR 515, SE 192ND ST TO BENSON RD, PAVING AND CHANNELIZATION
- CONTRACT 7414-- WSF, FAUNTLEROY FERRY TERMINAL TRESTLE INTERIM PRESERVATION
- CONTRACT 7420-- WSF, SYSTEMWIDE FERRY TERMINAL COUNTERWEIGHT CABLE REPLACEMENT
- CONTRACT 7419-- Executed 11/19/07 I-90, WEST OF GE0RGE PAVING
- CONTRACT 7422 SR3, PIONEER WAY AND BIG VALLEY RD-SIGNALS
- CONTRACT 7421-- Executed 11/27/07 SR 823, GOODLANDER TO HARRISON RD. BUILD SIDEWALK
- CONTRACT 7425-- Executed 11/27/07 I-5, BRIDGE 005/518 GIRDER REPLACEMENT
- CONTRACT 7419-- I-90, W OF GEORGE - PAVING
2006
- CONTRACT 7203 Executed 10/30/06--SR 16, 36TH ST TO OLYMPIC DR NW ROADSIDE RESTORATION
- CONTRACT 7200 Executed 11/6/06--I-405, SPRINGBROOK CREEK WETLAND AND HABITAT MITIGATION BANK
- CONTRACT 7204 Executed 11/6/06--SR 28, CRESCENT BAR TO QUINCY PAVING
- CONTRACT 7207 Executed 11/6/06--NC REGION SIGN UPDATE 2007
- CONTRACT 7205 Executed 10/26/2006--SR 20, WALKER HILL RD. TO GRAVES MTN. RD.-PAVING
- CONTRACT 7211 ANACORTES FERRY TERMINAL UPLAND PARKING LOT LANDSCAPE AND IRRIGATION
- CONTRACT 7212 Executed 11/14,2006--SR 14, TRAVELER INFORMATION ENHANCEMENT
2005
- CONTRACT 7041 Executed 10/26/05--SR 3, SR 161, OLYMPIC REGION CENTERLINE RUMBLE STRIPS
- CONTRACT 7031 Executed 10/20/05--SR 281, QUINCY SOUTH PAVING
- CONTRACT 7038 Executed 11/21/05--SR 202, JCT 292ND AVE SIGNAL & CHANNELIZATION
- CONTRACT 7032 Executed 12/15/2005--SR 3, SR 303 INTERCHANGE
- CONTRACT 7046 Executed 11/7/05--SR 207, WENATCHEE RIVER BR 207/4-RAIL RETROFIT
2004
- CONTRACT 6849- Executed 10/27/04--SR 527, 164TH ST SE TO 132ND ST SE ROADSIDE RESTORATION
- CONTRACT 6855- Executed 10/29/04--WSF, BREMERTON FERRY TERMINAL LIFT TOWER PILE REPAIR
- CONTRACT 6851- Executed 11/02/04--SR 31, METALINE FALLS TO THE INTERNATIONAL BORDER
2003
- CONTRACT 6655 - Executed 10/24/03-- 1/4 MILE EAST OF ANDERSON CREEK BR SLOPE STABILIZATION
- CONTRACT 6662 - All bids rejected--10/10/03--US 2/97, EASY ST. LINK STOP WB MP 115.14
- CONTRACT 6654 Executed 11/5/03-KING STREET STATION TOILET IMPROVEMENTS
- CONTRACT 6663 Executed 11/13/03 - I-5, CUSTER REST AREA SEWER REHABILITATION
- CONTRACT 6664 Executed 11/12/03 - US 2 & SR 26 DURABLE PAVEMENT MARKINGS - 2004
- CONTRACT 6667--Executed 11/24/03--WSF, ANACORTES FERRY TERMINAL MAINTENANCE
- CONTRACT 6658-- Executed 11/24/2003--I-90, TIBBETTS CREEK VICINITY CULVERT REPLACEMENT
- CONTRACT 6668 Executed 11/24/2003-- SR 28, QUINCY EAST - LEFT TURN LANES
2002
- CONTRACT 6436 Executed 11/5/2002- CITY OF MARYSVILLE ASH AVENUE PARK AND RIDE IMPROVEMENTS
- CONTRACT 6438 Executed 10/29/02 WSF, TAHLEQUAH FERRY TERMINAL DOLPHIN REPLACEMENT PHASE 1
- CONTRACT 6446 Executed 11/18/02 WSF, POINT DEFIANCE FERRY TERMINAL WINGWALL REPAIR
- CONTRACT 6445 Executed 11/7/02 NCR Sign Update 2003
- CONTRACT 6448 Executed 12/2/02 EAGLE HARBOR MAINTENANCE FACILITY DUCT COLLECTION SYSTEM REPLACEMENT
2001
- CONTRACT 6228 Executed 10/29/01--WISHKAH RIVER BRIDGE REHABILITATION
- CONTRACT 6229 All bids rejected 10/5/01--WHIDBEY ISLAND SECTION FACILITY
- CONTRACT 6230 Executed 10/29/01--BAINBRIDGE FERRY TERMINAL OVERHEAD LOADING RE-ROOF AND MISC. REPAIRS
- CONTRACT 6231 Executed 11/15/01--SR 5 HOLGATE TO 8TH AVE VICINITY SEISMIC RETROFIT
- CONTRACT 6237 Executed 11/9/01--SR 90 BARKER RD. I/C SIGNAL
- CONTRACT 6238 Executed 11/8/01--SR 90 RR O-XING TO ADAMS COUNTY LINE
- CONTRACT 6239 Executed 11/28/2001--SR 2 LINCOLN CO. LINE TO SR 21
- CONTRACT 6242 Executed 11/19/01--SR 513, MONTLAKE BRIDGE 513/12 BRIDGE PAINTING AND CRACK REPAIR
- CONTRACT 6243 Executed 11/14/01--SR 285 & 97 COLUMBIA RIVER BRIDGES SEISMIC RETROFIT
- CONTRACT 6244 Executed 11/19/2001--SR 125 & 11 STATELINE INTERSECTION
- CONTRACT 6245 Executed 11/26/2001--SR 5 & 518 MILITARY RD TO SR 900 SEISMIC RETROFIT
- CONTRACT 6248 Executed 10/31/2001--US 2 ICICLE SPILLWAY SLIDE REPAIR
- CONTRACT 6249 Executed 11/20/01--SR 5, BELLINGHAM AND BLAINE VIC BRIDGES SEISMIC RETROFIT
2000
- CONTRACT 5952 WHITE PASS SAND STORAGE BUILDING
- CONTRACT 5954 SR 99 SPOKANE ST OC SEISMIC STAGE TWO
- CONTRACT 5955 SR 303 RIDGETOP BLVD. NB OFF-RAMP SIGNALIZATION
- CONTRACT 5956 SR 97 OKANOGAN TO RIVERSIDE
- CONTRACT 5957 SR 24 HATTON ROAD CHANNELIZATION
- CONTRACT 5958 SR 504 CASTLE LAKE VIEWPOINT
- CONTRACT 5959 SPOKANE MODULAR PE BUILDING SITE IMPROVEMENTS
166,800 electric vehicle
registrations in Washington in 2023, up from 114,600 in 2022.
87 wetland compensation sites
actively monitored on 918 acres in 2023.
25,000 safe animal crossings
in the Snoqualmie Pass East Project area since 2014.