Contract summary
Improvement of SR 26 MP 84.14 (Bridge No. 26/135) and 1-90 MP 206.84 (Bridge No. 090/312S) with concrete overlay, scarifying concrete surface, deck repair, planning bituminous surface, removing existing overlay from bridge deck, hot mix asphalt paving, surveying for concrete overlay, steel reinforcement bar for deck repair, pavement markings, shoulder rumble strips, erosion control, traffic control and other work. Involves 44 items and 80 working days. Work class 6.