Project

East of Vantage to Moses Lake project

Timeline: July 2025 - 2026
  • Road
  • Not started
  • Grant County
This project will consist of planing and paving both eastbound and westbound driving lanes on Interstate 90 from milepost 138.26 to milepost 148.44, (eastbound) and from milepost 138.55 to milepost 148.44 (westbound). Also, it will pave all eastbound and westbound lanes from MP 175.62 to milepost…
Project

I-90 Vantage Bridge – Replace Bridge Deck and Special Repairs

Timeline: Spring 2024 - Spring 2028
  • Road
  • Construction
  • Grant County
This project replaces the existing bridge deck on the I-90 Vantage Bridge to maintain the structural integrity, ensure the safety of the highway and extend the life of the bridge. The Vantage Bridge was built in 1962 and the last time the bridge received a major overhaul was in 1982.
Project

SR 17 - Grape Drive Intersection Improvements - Complete Fall 2022

Timeline: Spring 2021 - Fall 2022
  • Road
  • Completed
  • Grant County
This project removed the existing signal at the intersection and built a multilane roundabout on SR 17 at the intersection of Grape Dr.
Project

SR 17 Moses Lake Vicinity Paving and ADA (Complete Aug. 2024)

Timeline: April 2024-July 2024
  • Road
  • Completed
  • Grant County
A section of roadway on SR 17 between Patton Boulevard and the Interstate 90 interchange is due for resurfacing. Pedestrian facilities at intersections along the way will also be updated to the standards set by the Americans With Disabilities Act.
The project will start with pedestrian…
Project

SR 17 Soap Lake to Lake Lenore Unstable Slopes

Timeline: February 2024-October 2024
  • Airport
  • Pre-construction
  • Grant County
The purpose of this project is to remove rock from the slopes along SR 17 between Soap Lake and Lake Lenore, just north of Lake Lenore Caves Road, as well as to install slope protection and stabilization measures to prevent future rockfall. Work will occur on eight slopes along SR 17.
This…
Project

SR 28 White Trail Rd. Roundabout - Complete June 2023

Timeline: 2020- Fall 2023
  • Road
  • Completed
  • Grant County
This project improved safety by constructing a roundabout at the intersection of SR 28 and White Trail Rd. west of the City of Quincy.
Project

SR 282 Nat Washington Blvd - Safety Improvement

Timeline: June 2026-September-2026
  • Road
  • Pre-construction
  • Grant County
This project will install a compact roundabout at the intersection of SR 282 and Nat Washington Way, to enhance safety and reduce collisions. Installing a roundabout has proven safer than the existing turns and safer than installing traffic signals.

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.