Contract summary
Repairing a scour hole at BR. No. 542/42 with concrete, moving existing streambed rocks to prevent future scour, roadside restoration, temporary erosion and water pollution control, temporary traffic control and other work. Involves 43 items and 49 working days. Work class 1.