SR 302, Victor Creek - Remove Fish Barrier

Contract summary

Replacing the existing 24-inch-diameter high density polyethylene (HDPE) pipe and 36-inch-diameter concrete culvert with a 30-foot concrete bridge structure. The work includes a temporary stream diversion system, erosion control, dewatering, clearing and grubbing, tree removal, structure and channel excavation, construction of a temporary traffic bypass, temporary illumination system, temporary drainage, removing existing culverts, installation of one concrete bridge structure, traffic barrier, bridge railing, backfilling, grading, crushed surfacing base course, planing and paving with hot mix asphat (HMA), drainage, pavement marking, signing, guardrail, guardrail anchor, guardrail terminals, stream bed restoration, seed, fertilize, mulch, planting, traffic control and other work. 170 working days. Involves 109 items. Contains 400 hours training.

Public Works
Publication Date
Contract status
Advertised
Contract ID
XE3512
County
Mason County
Submittal due date and time
Estimated value
$5,000,000 - $6,000,000
Funding source
A federally funded project with a 16% condition of award disadvantaged business enterprise goal.
Contact
Danika Washington,
Project Engineer