Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

5/18/2022 bid opening - Olympia, WA

Item no. 1: SR 99, Duwamish River to S Spokane St Vic Paving & ADA Compliance

Contract number: 009804
Engineer's estimate: $2,590,156.00
Number of addenda: 1
Number of bidders: 3/2

Award status: pending

Preliminary bid total results 

Apparent low: Tucci & Sons, Inc. - $3,681,888.00
Apparent 2nd: Lakeside Industries, Inc. - $3,838,300.00**

Verified bid total results 

Low bidder: Tucci & Sons, Inc.
Bid amount: $3,681,888.00

Bid information

Subcontractor named 

  1. Totem Electric of Tacoma, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $291,000.00
    Description of work: traffic control
  2. Lee's Demolition, LLC - sub - $213,000.00
    Description of work: lowering/raising utilities and sidewalk removal and prep
  3. Reece Construction Company - sub - $122,000.00
    Description of work: bituminous planing
  4. The Bag Lady - sub - $6,300.00
    Description of work: erosion control
  5. WE Coates Surveying - sub - $37,950.00
    Description of work: construction surveying

DBE goal: $622,739.84
DBE total: $670,250.00

2nd bidder: Lakeside Industries, Inc.
Bid amount: $3,838,300.90**

Bid information

Subcontractor named 

  1. Totem Electric of Tacoma, Inc.
    Description of work: electrical 50, 62 and 78

Disadvantaged business enterprise (DBE) 

  1. Reece Construction - sub - $125,000.00
    Description of work: planing
  2. O'Bunco Engineering - sub - $34,735
    Description of work: survey
  3. Advanced Traffic Control - sub - $325,000.00
    Description of work: traffic control
  4. Lee's Demolition, LLC - sub - $170,000.00
    Description of work: concrete demo, subgrade preparation & road construction
  5. J & G Concrete Corp. - sub - $40,000.00
    Description of work: concrete

DBE goal: $690,894.16
DBE total: $694,736.00

Item no. 2: SR 241/I-82, North of Sunnyside and I-82 I/C - Paving

Contract number: 009817
Engineer's estimate: $3,955,541.45
Number of addenda: 2
Number of bidders: 3/3

Award status: pending

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $4,734,227.45
Apparent 2nd: Granite Construction Company - $5,187,338.10
Apparent 3rd: Central Washington Asphalt, Inc. - $5,424,000.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $4,734,227.45

Bid information

Subcontractor named 

  1. Knobel's Electric
    Description of work: BI 48 - electrical 
  2. Combined Construction
    Description of work: BI 9 (rebar) bridge approach slab

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead dba Pavement Surface Control - sub - $207,343.35
    Description of work: joint seal, paint lines, permanent pavement marking, rumble strips
  2. Northwest Traffic Control, LLC - sub - $502,564.01
    Description of work: temp pvmnt marking, traffic control, flagging, PCMS, traffic control devices, atennuator, arrow board, class A signs
  3. Pacific Rim Service and Construction Co. - sub - $39,043.00
    Description of work: installation & supply guardrail and posts/blocks, barrier delineator, guide posts
  4. O'Bunco Engineering - sub - $8,885.00
    Description of work: construction surveying

DBE goal: $757,476.39
DBE total: $757,835.36

2nd bidder: Granite Construction Company
Bid amount: $5,187,338.10

Bid information

Subcontractor named 

  1. Knobel's Electric, Inc.
    Description of work: electrical
  2. Harris Rebar Columbia Basin, Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE) 

  1. Pavement Surface Control - sub - $404,475.40
    Description of work: paint lines, pavement marking, guide posts, rumble strips, crack & joint seal
  2. BC Traffic, LLC - sub - $431,953.00
    Description of work: flagging and traffic control management

DBE goal: $829,974.09
DBE total: $836,428.40

3rd bidder: Central Washington Asphalt, Inc.
Bid amount: $5,424,000.00

Bid information

Subcontractor named 

  1. Sierra Electric, Inc.
    Description of work: electrical/illumination 

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $594,980.00
    Description of work: flagging, traffic control
  2. Construction Ahead, Inc. dba Pavement Surface - sub - $284,063.40
    Description of work: paint lines, temporary/permanent marking includes: striping, guideposts, rumble strips, crack & joint seal

DBE goal: $867,840.00
DBE total: $879,043.40

Item no. 3: I-5/US 101, Mcallister Creek & Mud Bay Bridges – Repair Bridge Piles

Contract number: 009808
Engineer's estimate: $1,058,126.20
Number of addenda: 3
Number of bidders: 8/3

Award status: pending

Preliminary bid total results 

Apparent low: Selby Bridge Company, Inc. - $670,352.00
Apparent 2nd: Massana Construction, Inc. - $1,125,437.00
Apparent 3rd: Rognlin's, Inc. - $1,900,217.00

Verified bid total results 

Low bidder: Selby Bridge Company, Inc.
Bid amount: $670,352.00

Bid information

Subcontractor named 

None proposed
Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. The Traffic Control Co., Inc. - sub - $123,510.00
    Description of work: traffic control
  2. The Bag Lady - sub - $3,857.00
    Description of work: erosion control

DBE goal: $127,366.88
DBE total: $127,367.00

2nd bidder: Massana Construction, Inc.
Bid amount: $1,125,437.00

Bid information

Subcontractor named 

  1. Massana Construction, Inc.
    Description of work: self perform

Disadvantaged business enterprise (DBE) 

  1. CGM Dirt Works LLC, dba CGM Dirt Works - sub - $214,120.00
    Description of work: site prep, grading, rip rap import and install, export aggregate materials, high-vis fence

DBE goal: $213,833.03
DBE total: $214,120.00

3rd bidder: Rognlin's, Inc.
Bid amount: $1,900,217.00

Bid information

Subcontractor named 

  1. Rognlin's, Inc.
    Description of work: plumbing
  2. Rognlin's, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $188,000.00
    Description of work: traffic control services
  2. Northwest Grouting LLC - sub - $174,300.00
    Description of work: grouting (reinforcing with concrete)

DBE goal: $361,041.23
DBE total: $362,300.00

Item no. 4: I-90, Cabin Creek I/C to W Easton I/C Phase 3 - Add Lanes/Wildlife Bridges

Contract number: 009786
Engineer's estimate: Base + A1: $251,592,949.00
Engineer's estimate: Base + A2: $249,346,179.00
Number of addenda: 8
Number of bidders: 8/5

Award status: pending

Preliminary bid total results 

Apparent low: Scarsella Bros., Inc. - $285,464,518.80
Apparent 2nd: Skanska USA Civil West California District Inc. - $311,900,000.00
Apparent 3rd: Graham Contracting, Ltd. - $325,000,000.00

Verified bid total results 

Low bidder: Scarsella Bros., Inc.
Bid amount: $285,464,518.80

Bid information

Subcontractor named 

  1. Elcon Corporation
    Description of work: electrical 
  2. SB Structures, LLC
    Description of work: structural steel 
  3. Rebar International
    Description of work: reinforcing steel  

Small business enterprise (SBE) 

  1. Construction Ahead Inc. dba Pavement Surface Control - sub - $14,503,133.45
    Description of work: mob (partial), barrier rem., rem. striping, permanent barrier, temp. barrier, guide posts, delineators, paint line, rumble strips, snow pole, perm. signs

SBE goal: $14,273,225.94
SBE total: $14,503,133.45

Veteran-owned business (VOB) 

  1. M2 Industrial, Inc. - sub - $8,295,197.50
    Description of work: guardrail removal, guardrail, cable fence, wildlife fence, wire fence, gates
  2. Northwest Linings - manufacturer - $300,000.00
    Description of work: erosion control material, supply, geotextile supply

VOB goal: $8,563,935.54
VOB total: $8,595,197.50

2nd bidder: Skanska USA Civil West California District Inc.
Bid amount: $311,900,000.00

Bid information

Subcontractor named 

  1. Stetner
    Description of work: electrical/illumination
  2. Pacific Steel Group
    Description of work: furnish and install rebar
  3. Michels
    Description of work: structural steel - furnish and install soldier piles

Small business enterprise (SBE) 

  1. Grady Excavating Inc. - sub - $15,963,845.00
    Description of work: partial, roadway excavation excluding fine grade
  2. Grady Excavating Inc. - sub - $3,011,295.00
    Description of work: partial, embankment compaction excluding fine grade and water

SBE goal: $15,595,000.00
SBE total: $18,974,140.00

Veteran-owned business (VOB) 

  1. M2 Industrial - sub - $1,028,868.00
    Description of work: guardrail
  2. M2 Industrial - sub - $7,419,202.00
    Description of work: fencing, gates
  3. M2 Industrial - sub - $43,250.00
    Description of work: partial, remove wire and cable fence
  4. JJH Earthworks, LLC - sub - $3,598,890.00
    Description of work: large woody material salvage, streambed, habitat, rock for erosion and scour protection, streambed test sections
  5. JJH Earthworks, LLC - sub - $305,028.00
    ​​​​​​​Description of work: large woody material, boulder anchor

VOB goal: $9,357,000.00
VOB total: $12,395,238.00

3rd bidder: Graham Contracting, Ltd.
Bid amount: $325,000,000.00

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE) 

  1. Construction Ahead, Inc. - sub - $10,000,000.00
    Description of work: barrier
  2. Grady Excavating, Inc. - sub - $8,000,000.00
    Description of work: construction, highway and road

SBE goal: $16,250,000.00
SBE total: $18,000,000.00

Veteran-owned business (VOB) 

  1. M2 Industrial, Inc. - sub - $8,000,000.00
    Description of work: fence & guardrail
  2. JJH Earthworks - sub - $2,000,000.00
    Description of work: site work

VOB goal: $9,750,000.00
VOB total: $10,000,000.00

5/11/2022 bid opening - Olympia, WA

Item no. 1: SR 9, SR 204 Intersection Improvements (Stage 3)

Contract number: 009801
Engineer's estimate: $17,157,416.25
Number of addenda: 2
Number of bidders: 6/5

Award status: pending

Preliminary bid total results 

Apparent low: Interwest Construction, Inc. - $14,088,088.00
Apparent 2nd: Walsh Construction Company II, LLC - $14,299,286.72**
Apparent 3rd: Marshbank Construction Inc. - $18,863.104.00**

Verified bid total results 

Low bidder: Interwest Construction, Inc.
Bid amount: $14,088,088.00

Bid information

Subcontractor named 

  1. Service Electric Co. Inc.
    Description of work: electrical
  2. Interwest Construction Inc. - self perform
    Description of work: structural steel installation
  3. Rebar International Inc.
    Description of work: rebar installation  

2nd bidder: Walsh Construction Company II, LLC
Bid amount: $14,299,286.71**

Bid information

Subcontractor named 

  1. Rebar International Inc.
    Description of work: rebar installation
  2. Valley Electric Co. of Mt. Vernon Inc.
    Description of work: electrical 

3rd bidder: Marshbank Construction Inc.
Bid amount: $18,850,822.00**

Bid information

Subcontractor named 

  1. Stetner Construction Group
    Description of work: electrical
  2. Rebar International Inc.
    Description of work: rebar

Item no. 2: I-5, Kincaid Sign Structure Replacement (Small Works Roster)

Contract number: 009814
Engineer's estimate: $247,159.00
Number of addenda: 1
Number of bidders: 2/2

Award status: pending

Preliminary bid total results 

Apparent low: Massana Construction, Inc. - $269,758.00
Apparent 2nd: Northeast Electric, LLC - $336,434.00

Verified bid total results 

Low bidder: Massana Construction, Inc.
Bid amount: $269,758.00

Bid information

Small business enterprise (SBE)  

  1. Versatile Drilling Contractors, Inc. - sub - $34,475.00
    Description of work: cantiliver sign structure No. 1, (partial) foundation shaft drilling

SBE goal: $13,487.90
SBE total: $34,375.00

Veteran-owned business (VOB)  

  1. Versatile Drilling Contractors, Inc. - sub - $34,475.00
    Description of work: cantiliver sign structure No. 1, (partial) foundation shaft, drilling  

VOB goal: $2,697.58
VOB total: $34,375.00

2nd bidder: Northeast Electric, LLC
Bid amount: $336,434.00

Bid information

Small business enterprise (SBE)  

  1. Hughes Group, LLC - sub - $25,849.92
    Description of work: TCS & labor/driver

SBE goal: $16,821.70
SBE total: $25,849.92

Veteran-owned business (VOB)  

  1. Hughes Group, LLC - sub - $13,879.28
    Description of work: TC devices & equipment

VOB goal: $3,364.34
VOB total: $13,879.28

Item no. 3: I-90, Oakes Ave I/C to Yakima River Bridge Replace Concrete Panels 

Contract number: 009813
Engineer's estimate: $8,598,995.16
Number of addenda: 2
Number of bidders: 5/2

Award status: pending

Preliminary bid total results 

Apparent low: Gary Merlino Construction Co., Inc. - $8,655,673.00
Apparent 2nd: Acme Concrete Paving, Inc. - $10,595,155.00

Verified bid total results 

Low bidder: Gary Merlino Construction Co., Inc.
Bid amount: $8,655,673.00

Bid information

Subcontractor named 

  1. Prime Electric, Inc.
    Description of work: electrical  
  2. PSF Mechanical
    Description of work: HVAC  
  3. PSF Mechanical
    Description of work: plumbing  
  4. Gary Merlino Construction Co., Inc.
    Description of work:  structural steel
  5. Gary Merlino Construction Co., Inc.
    Description of work: rebar installation

Disadvantaged business enterprise (DBE)  

  1. Pavement Surface Control - sub - $111,000.00
    Description of work: permanent pavement marking
  2. Pavement Surface Control - sub - $770,000.00
    Description of work: crack & joint seal

DBE goal: $865,567.30
DBE total: $881,000.00

2nd bidder: Acme Concrete Paving, Inc.
Bid amount: $10,595,155.00

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE)  

  1. Advanced Traffic Control - sub - $1,100,000.00
    Description of work: traffic control

DBE goal: $1,059,515.50
DBE total: $1,100,000.00

Item no. 4: 2022 OR Region Wide Chip Seal

Contract number: 009816
Engineer's estimate: $5,130,564.00
Number of addenda: 1
Number of bidders: 2/2

Award status: pending

Preliminary bid total results 

Apparent low: Doolittle Construction, LLC - $6,863,401.20
Apparent 2nd: Granite Construction Company - $7,325,325.00

Verified bid total results 

Low bidder: Doolittle Construction, LLC
Bid amount: $6,863,401.20

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed  

Small business enterprise (SBE)  

  1. AVC Consulting & Supply - sub - $46,025.00
    Description of work: inlet protection
  2. AVC Consulting & Supply - sub - $2,500.00
    Description of work: erosion control
  3. AVC Consulting & Supply - sub - $248,690.00
    Description of work: class A signs
  4. AVC Consulting & Supply - sub - $8,350.00
    Description of work: roadside cleanup
  5. T&T Traffic Control - sub - $190,000.00
    Description of work: temporary traffic control
  6. Seattle Sweeping - sub - $10,000.00
    Description of work: roadway sweeping

SBE goal: $343,170.06
SBE total: $505,565.00

Veteran-owned business (VOB)  

  1. None proposed
    Description of work: none proposed 

VOB goal: $137,268.02
VOB total: $0.00

2nd bidder: Granite Construction Company
Bid amount: $7,325,325.00

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)  

  1. BC Traffic LLC - sub - $450,000.00
    Description of work: project traffic control (excluding class A signs)

SBE goal: $366,266.25
SBE total: $450,000.00

Veteran-owned business (VOB)  

  1. Marwood General Construction - sub - $87,300.00
    Description of work: dump trucking - chip rock
  2. Seattle Sweeping, Inc. - sub - $48,600.00
    Description of work: sweeping
  3. Seattle Sweeping, Inc. - sub - $19,980.00
    Description of work: additional brooming

VOB goal: $146,506.50
VOB total: $155,880.00

5/4/2022 bid opening - Olympia, WA

Item no. 1: US 2, Stevens Pass East - Paving

Contract number: 009806
Engineer's estimate: $6,110,748.25
Number of addenda: 2
Number of bidders: 3/3

Award status: pending

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $7,467,584.00
Apparent 2nd: Central Washington Asphalt, Inc. - $9,366,000.00
Apparent 3rd: Granite Construction Company - $9,778,768.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $7,467,584.00 

Bid information

Subcontractor named 

  1. Neppel Electric
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. Pro Eagle Trucking - sub - $41,760.00
    Description of work: water truck with operator
  2. Changing Directions - sub - $683,720.00
    Description of work: traffic control services
  3. Neppel Electric & Controls LLC - sub - $35,000.00
    Description of work: install electrical equipment
  4. Reece Trucking & Excavating - sub - $359,733.80
    Description of work: asphalt milling
  5. M2 Industrial - sub - $36,184.00
    Description of work: concrete barrier impact attenuator
  6. North Star Enterprises - sub - $176,950.00
    Description of work: guide posts, rumble strips, pavement marking
  7. O'Bunco - sub - $56,440.11
    Description of work: construction surveying
  8. Audi Construction - sub - 35,000.00
    Description of work: dump trucking
  9. Hawn Trucking LLC - sub - $68,730.00
    Description of work: dump trucking

DBE goal: $1,493,516.80
DBE total: $1,493,517.91

2nd bidder: Central Washington Asphalt, Inc.
Bid amount: $9,366,000.00

Bid information

Subcontractor named 

  1. Neppel Electric & Controls, LLC
    Description of work: electrical / illumination

Disadvantaged business enterprise (DBE) 

  1. Changing Directions - sub - $748,690.15
    Description of work: traffic control services and temporary pavement markings
  2. Construction Ahead, Inc. dba Pavement Surface Control - sub - $1,132,544.50
    Description of work: paint lines, permanent marking includes: striping, guideposts, rumble strips, barrier removal/install

DBE goal: $1,873,200.00
DBE total: $1,881,234.65

3rd bidder: Granite Construction Company
Bid amount: $9,778,768.00

Bid information

Subcontractor named 

1. Neppel Electric & Controls LLC
Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $612,640.92
    Description of work: traffic control and temporary pavement marking
  2. Pavement Surface Control - sub - $1,375,114.58
    Description of work: permanent pavement marking, guideposts, rumble strips, temp barrier removal/install, crach and joint seal

DBE goal: $1,955,753.60
DBE total: $1,987,755.50

Item no. 2: SR 500, NE 182nd Ave Intersection Improvements

Contract number: 009807
Engineer's estimate: $1,511,740.00
Number of addenda: 2
Number of bidders: 5/3

Award status: awarded 5/12/2022

Preliminary bid total results 

Apparent low: Thompson Bros. Excavating, Inc. - $1,599,374.50
Apparent 2nd: Advanced Excavating Specialists, LLC - $1,599,847.30
Apparent 3rd: McDonald Excavating, Inc. - $1,871,421.00 - rejected 5/12/2022

Verified bid total results 

Low bidder: Thompson Bros. Excavating, Inc.
Bid amount: $1,599,374.50

Bid information

Subcontractor named 

  1. Scheider & Sons, Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial Inc. - sub - $55,365.00
    Description of work: guardrail
  2. Schneider & Sons, Inc. - sub - $235,738.00
    Description of work: electrical, illumination & signage

DBE goal: $287,887.41
DBE total: $291,098.00

2nd bidder: Advanced Excavating Specialists, LLC
Bid amount: $1,599,847.30

Bid information

Subcontractor named 

  1. Schneider & Sons, Inc.
    Description of work: electrical
  2. Schneider & Sons, Inc.
    Description of work: rebar installation
  3. Schneider & Sons, Inc.
    Description of work: structural steel

Disadvantaged business enterprise (DBE) 

  1. The Bag Lady - sub - $39,058.50
    Description of work: erosion control
  2. M2 Industrial - sub - $55,365.00
    Description of work: guardrail
  3. Schneider & Sons, Inc. - sub - $203,500.00
    Description of work: electrical

DBE goal: $287,972,51
DBE total: $297,923.50

3rd bidder: McDonald Excavating, Inc. - rejected 5/12/2022
Bid amount: $1,871,421.00

Bid information

Subcontractor named 

  1. NE Electric
    Description of work: lighting/electrical 
  2. Hildebrand Concrete
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. McDonald Excavating - prime - $374,284.00
    Description of work: street construction, excavating earth moving & land clearing, grading construction sites

DBE goal: $336,855.78
DBE total: $374,284.00

Item no. 3: I-5, 21-23 SWR Regionwide Bridges Concrete Deck Patching

Contract number: 009812
Engineer's estimate: $1,622,910.00
Number of addenda: 1
Number of bidders: 5/2

Award status: pending

Preliminary bid total results 

Apparent low: M.J. Hughes Construction, Inc. - $2,539,239.63
Apparent 2nd: Granite Construction Company - $2,899,000.00

Verified bid total results 

Low bidder: M.J. Hughes Construction, Inc.
Bid amount: $2,539,239.63

Bid information

Subcontractor named 

  1. M.J. Hughes Construction
    Description of work: structural steel installation and rebar installation

Disadvantaged business enterprise (DBE) 

  1. D&H Flagging - sub - $440,000.00
    Description of work: traffic control

DBE goal: $431,670,74
DBE total: $440,000.00

2nd bidder: Granite Construction Company
Bid amount: $2,899,000.00

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed 

Disadvantaged business enterprise (DBE) 

  1. BC Traffic, LLC, dba Budman Construction - sub - $500,000.00
    Description of work: traffic control

DBE goal: $492,830.00
DBE total: $500,000.00

Item no. 4: US 97 ET AL, 2022 SCR Region Wide Chip Seal

Contract number: 009815
Engineer's estimate: $4,159,340.28
Number of addenda: 1
Number of bidders: 3/3

Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Interstate Concrete & Asphalt Company - $4,969,063.42
Apparent 2nd: Granite Construction Company - $5,012,750.50
Apparent 3rd: Central Washington Asphalt, Inc. - $5,675,000.00

Verified bid total results 

Low bidder: Interstate Concrete & Asphalt Company
Bid amount: $4,969,063.42

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Construction Ahead Inc. - sub - $655,339.10
    Description of work: crack seal, guideposts, rumble strips, paint line, pavement marking (permanent)
  2. O'Bunco - sub - $5,560.00
    Description of work: construction surveying
  3. North Star Enterprises - sub - $284,000.00
    Description of work: temp. pavement marking, traffic control, sign erection

DBE goal: $944,122.05
DBE total: $944,899.10

2nd bidder: Granite Construction Company
Bid amount: $5,012,750.50

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $518,000.00
    Description of work: traffic control, temporary pavement markings
  2. Pavement Surface Control - sub - $444,465.00
    Description of work: crack and joint seal, guideposts, rumble strips, pavement markings, paint lines

DBE goal: $952,422.60
DBE total: $962,465.00

3rd bidder: Central Washington Asphalt, Inc.
Bid amount: $5,675,000.00

Bid information

Subcontractor named 

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises, Inc. - sub - $800,075.00
    Description of work: flagging, traffic control, temp & recessed pavement marking & striping, rumble strips, removal & installations (i.e., temp & paint stripes)
  2. Construction Ahead, Inc. dba Pavement Surface - sub - $285,679.10
    Description of work: paint lines, permanent pavement marking includes: striping, guideposts

DBE goal: $1,078,250.00
DBE total: $1,085,754.10

Item no. 5: SR 14, I-205 to SE 164th Avenue Auxiliary Lanes

Contract number: 009800
Max funds available: $18,500,000.00
Engineer's estimate: $18,191,934.75
Number of addenda: 2
Number of bidders: 7/3

Award status: awarded 5/9/2022

Preliminary bid total results 

Apparent low: Rotschy, Inc. - $17,122,823.75
Apparent 2nd: Selby Bridge Company, Inc. - $18,491,946.64
Apparent 3rd: Goodfellow Bros. LLC - $18,916,068.11 - rejected 5/6/2022

Verified bid total results 

Low bidder: Rotschy, Inc.
Bid amount: $17,122,823.75

Bid information

Subcontractor named 

  1. Mill Plain Electric
    Description of work: electrical
  2. Rotschy, Inc. - self perform
    Description of work: structural steel installation scope
  3. Pacific Steel Group
    Description of work: rebar installation 

2nd bidder: Selby Bridge Company, Inc.
Bid amount: $18,491,946.64

Bid information

Subcontractor named 

  1. Bar-M Steel Commercial
    Description of work: rebar installation
  2. Mill Plain Electric
    Description of work: electrical 

3rd bidder: Goodfellow Bros. LLC - rejected 5/6/2022
Bid amount: $18,916,068.11

Bid information

Subcontractor named 

  1. Mill Plain 
    Description of work: ITS, sign bridges, illumination system, permanent signage

Item no. 6: SR 3, Belfair Area Driveway Revision (Small Works Roster)

Contract number: 009818
Engineer's estimate: $133,793.00
Number of addenda: 0
Number of bidders: 6/5

Award status: awarded 5/19/2022

Preliminary bid total results 

Apparent low: Massana Construction, Inc. - $119,494.00
Apparent 2nd: Oma Construction, Inc. - $138,673.00
Apparent 3rd: Rognlin's, Inc. - $188,811.00

Verified bid total results 

Low bidder: Massana Construction, Inc.
Bid amount: $119,494.00

2nd bidder: Oma Construction, Inc.
Bid amount: $138,673.00

3rd bidder: Rognlin's, Inc.
Bid amount: $188,811.00

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Zero emission electric vehicle registrations in Washington

increased 192% between 2017 and 2021.

45 projects to improve freight rail structures and freight movement

were underway as of December 31, 2021.

Washington state leveraged $100,000 to secure $27 million

in funding for airport investments in Fiscal Year 2022.