Contract summary
The project will replace approximately 29 existing fish barriers along US101 and SR 109 with fish passable structures in Grays Harbor, Jefferson, and Clallam Counties. This project will be delivered in two phases utilizing the PDB delivery method. The Phase 1 will include preliminary engineering to the level necessary to develop a Guaranteed Maximum Price (GMP), and Phase 2 will include final design and construction.