Contract summary
Decommissioning and replacement of the existing well in a new location, replacement of waterlines (trenching and/or directional drilling may be used; directional drilling only under I-90), asphalt, concrete, water system equipment, electrical and mechanical systems, relocating the existing well house structure, and other work. Involves 60 working days and 1 item. Work class 15 or 51.