Contract summary
Installing precast concrete fiber hub, switch gear racks, uninterruptible power supply (UPS) system, power generator, fiber conduit with innerduct, fiber optic cabling, junction boxes, slab on grade concrete foundation, traffic control and other work. Involves 27 items and 43 working days. Work class 16 or 42.