WSDOT-managed airport planning

The Washington State Department of Transportation (WSDOT) Aviation is developing Airport Layout Plans (ALP) and Narrative Reports for 14 of the 16 State-Managed Airports located throughout Washington State.

Review the draft Airport Layout Plans for the State-Managed Airports. (Updated 5/17/2022). There is a Phase II draft of the Copalis Airport ALP ready for public comments. Send any comments on the Copalis ALPs to the State-Managed Airports Manager Paul Wolf at paul.wolf@wsdot.wa.gov or 360-709-8034.

Background

WSDOT owns seven airports, leases one and operates eight under conditional use permits. Fourteen state-managed airports do not have a current ALPs, other supporting drawings, or technical evaluations that Aviation Division staff can use to manage, plan, maintain, develop and protect the airports. The need for basic planning tools for the group of WSDOT airports has been identified by the Aviation Division for several years.

Century West Engineering Corporation has been selected to prepare ALP drawings and technical reports for five priority airports as the first phase of a multi-year project to develop ALPs for all WSDOT-managed airports.

The primary outcomes for each airport include:

  • Infrastructure assessment
  • An assessment of existing facilities, land ownership, and land use
  • Define facility and maintenance needs for each airport
  • Develop a capital and maintenance cost summary with prioritized projects identified
  • Airport Layout Plan drawing
  • Airspace Plan drawing
  • Inner Approach and RPZ Plan drawing
  • Land Use Plan drawing
  • Exhibit A Property Plan drawing
  • Technical Report

For the purposes of evaluating FAA and WSDOT-Managed Airport standards, all analyses will be based on the following assumptions:

Critical/Design Aircraft:

  • Single Engine Piston Aircraft (Typ. Cessna 172, 206, Piper PA28)
  • Aircraft Approach Category A (speeds less than 91 knots)
  • Airplane Design Group I
  • Small Airplane (12,500 pounds or less)
  • Airport Reference Code (ARC) A-I (small) will be used to define appropriate design standards

Funding

WSDOT's Airport Aid Grant Program is funding 95 percent of the $150,000 ALP project for the first five priority airports. The WSDOT State-Managed Airport Operating Fund is contributing a five percent local match.

Project Goals

The ALPs will define the short-term and long-term needs of the airport through a comprehensive evaluation of airport conditions and FAA/WSDOT design standards. The ALP's will provide specific guidance on making necessary improvements to maintain safe, efficient and user-friendly airports.

Project Goals

  • Maintain an open public participation process.
  • Develop an Airport Capital Improvement Program (ACIP) that will prioritize improvements and estimate project development costs and funding eligibility for the 20-year planning period.

National Airport System

These State-Managed Airports are not included in the FAA's National Plan of Integrated Airport Systems (NPIAS) and therefore, are not eligible to receive FAA funding.

State Airport System

Woodland State Airport is classified under the States Classification system as a "Local Service" airport in the Washington Long-term Air Transportation (LATS) System Plan. The remaining 13 airports are classified as Rural Essential airports.

Public Involvement

The public involvement element of the planning process will provide opportunities for all interested individuals, organizations, or groups to participate in the project.

Schedule

Priority 1
Drafts completed. Final reports to be completed by July 2018

Sullivan Lake
Owner: USDA Forest Service

Lake Wenatchee
Owner: State

Bandera
Owner: State

Easton
Owner: State

Woodland
Owner: State

Priority 2
Drafts completed. Final reports to be completed July 2018

Tieton
Owner: State

Ranger Creek
Owner: USDA Forest Service

Skykomish
Owner: State

Copalis
Owner: WA State as administered by WA Parks and Rec and WSDOT Aviation

 

Priority 3
Pending budget allocation and negotiations with Federal land owners

Little Goose
Owner: USACE

Lower Monumental
Owner: USACE

Rogersburg
Owner: DOI BLM

Lower Granite
Owner: USACE

Stehekin
Owner: State

*Note: Priority three airports are subject to change pending coordination with applicable agencies.

 

Feedback

Review the draft Airport Layout Plans

Contact
Paul Wolf
paul.wolf@wsdot.wa.gov
State-Managed Airports Manager
360-618-2477

8,683 animals crossed the Snoqualmie Pass East Project area

as recorded by WSDOT and partners in 2020 and 2021.

46% increase in Amtrak Cascades ridership to 251,000 passengers

in 2021 compared to 172,000 in 2020.

Nine wetland and stream mitigation sites across 32.7 acres added

to our monitoring program in 2021 to help offset climate change impacts.