Advertisement and Award Manual

Publication Number
M 27-02
Publication Version
M 27-02.05
Publication Date
Manual Manager
Jenna Fettig
Originator
Contract Ad and Award Office, Engineering and Regional Operations Division

Advertisement, award, and execution are the legal steps required to contract transportation construction projects. Specific documents and documentation are required for each step of the contracting process. This manual identifies each step and provides guidance for legally meeting the contracting requirements.

14 fish passage projects were completed in 2020

improving access to 54.2 miles of upstream habitat.

11,959 incidents responded to

by WSDOT’s incident Response teams during second quarter of 2021, 15% more than same quarter in 2020.

41 Pre-existing Funds Projects Advertised

during the eighth quarter of the 2019-2021 biennium.