Advertisement and Award Manual
Advertisement, award, and execution are the legal steps required to contract transportation construction projects. Specific documents and documentation are required for each step of the contracting process. This manual identifies each step and provides guidance for legally meeting the contracting requirements.
Slow down on ice and snow.
It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.
Carry chains, practice installing them.
Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.
Pack your winter car kit.
Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.