Project overview
This project will rehabilitate approximately 5.42 miles of I-90 from BNRR Bridge (MP 267.84) to Geiger Road (MP 273.26) in Spokane County by removing the surface of the existing pavement and paving with Hot Mix Asphalt (HMA).
What to expect
The project will be accomplished by removing the surface of the existing pavement, repairing portions of the underlying pavement, crack sealing, paving with Hot Mix Asphalt, and installing rumble strips. Once completed, the roadway surface will have a smoother ride that will be preserved for years to come.
During construction, travelers can expect a reduced speed approaching the work zone and single-lane closures. Crews will close one lane at a time to grind out the deteriorating asphalt. They will later install a fresh surface. Travelers, especially motorcyclists, should be alert for milled pavement surfaces and vertical lane edges. Please remember to slow down in work zones and watch for road crews.
Project map location for BNRR Bridge to Geiger Road – Paving project.