Contract summary
Requires removal of the existing mini-roundabout, re-orientating ramps to connect closer to the bridge overpass, installing a new multi-lane roundabout, road excavation, planing, pigmented concrete installation, paving, curb installation, stormwater work, traffic control and other work. Involves 103 items and 70 working days. Work class 1.