Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractor's bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.
     

1/28/2026 bid opening - Olympia, WA

Item no. 1: SR 20, Coupeville Ferry Terminal Painting Preservation

Contract number: XE3685
Engineer's estimate: $549,400.00
Number of addenda: 1
Number of bidders: 10/3
Award status: pending

Preliminary bid total results

Apparent low: Combined Construction, Inc. - $823,704.00 
Apparent second: Vimas Painting Company, Inc. - $838,004.00
Apparent third: Massana Construction, Inc. - $913,504.00

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $823,704.00

Public works small business enterprise (PWSBE)

  1. AllSource Construction - manufacturer/supplier - $10,000.00
    Description of work: product supplier
  2. AllSource Construction - manufacturer/supplier - $31,200.00
    Description of work: product supplier

PWSBE goal: $41,185.20
PWSBE total: $41,200.00

Veteran-owned business (VOB)

  1. Rainier Welding Partners - manufacturer/supplier - $16,500.00
    Description of work: 

VOB goal: $16,474.08
VOB total: $16,500.00

Second bidder: Vimas Painting Company, Inc.
Bid amount: $838,004.00

Public works small business enterprise (PWSBE)

  1. Hunnicutt's Inc. - sub - $36,300.00
    Description of work: cleaning & painting lights
  2. Hunnicutt's Inc. - sub - $5,700.00
    Description of work: cleaning & painting span partial

PWSBE goal: $41,900.20
PWSBE total: $42,000.00

Veteran-owned business (VOB)

  1. Hunnicutt's Inc. - sub - $17,000.00
    Description of work: cleaning & painting span partial

VOB goal: $16,760.08
VOB total: $17,000.00

Third bidder: Massana Construction, Inc.
Bid amount: $913,504.00

Public works small business enterprise (PWSBE)

  1. J. Linder Painting LLC - sub - $25,000.00
    Description of work: cleaning & painting
  2. J. Linder Painting LLC - sub - $21,000.00
    Description of work: (partial) painting

PWSBE goal: $45,675.20
PWSBE total: $46,000.00

Veteran-owned business (VOB)

  1. Rainier Welding - sub - $16,500.00
    Description of work: structural steel - materials
  2. Rainier Welding - sub - $2,500.00
    Description of work: force acct (partial) materials

VOB goal: $18,270.08
VOB total: $19,000.00
 

Item no. 2: I-5, SB I-205 to NE 179th St Concrete Pavement Rehabilitation

Contract number: XE3678
Engineer's estimate: $8,430,483.00
Number of addenda: 3
Number of bidders: 2/2
Award status: awarded 2/10/2026

Preliminary bid total results

Apparent low: Kerr Contractors Oregon, LLC - $9,131,526.70
Apparent second: Granite Construction Company - $9,415,900.00

Verified bid total results

Low bidder: Kerr Contractors Oregon, LLC
Bid amount: $9,131,526.70

Subcontractor named

  1. American Electrical Constructon LLC - AMERIEC808N5
    Description of work: electrical
  2. S&S, Inc. - SSINCI751LO
    Description of work: structural steel installation
  3. S&S, Inc. - SSINCI751LO
    Description of work: rebar installation

Second bidder: Granite Construction Company
Bid amount: $9,415,900.00

Subcontractor named

  1. S&S, Inc. - SSINCI*751LO
    Description of work: electrical
  2. S&S, Inc. - SSINCI*751LO
    Description of work: rebar
     

1/22/2026 bid opening - Olympia, WA

Item no. 1: US 2 et al, NCR Guardrail Update - 2026

Contract number: XE3677
Engineer's estimate: $2,797,866.50
Number of addenda: 2
Number of bidders: 7/4
Award status: awarded 2/3/2026

Preliminary bid total results

Apparent low: Coral Construction Company - $2,727,272.00
Apparent second: Massana Construction, Inc. - $2,848,542.85
Apparent third: Dirt and Aggregate Interchange, Inc. - $2,957,923.63

Verified bid total results

Low bidder: Coral Construction Company
Bid amount: $2,727,272.00

Subcontractor named

  1. North Star Enterprises, Inc.
    Description of work: flagging, i.e. traffic control services
  2. Strider Construction Co., Inc.
    Description of work: pipe, excavation, agg. base

Public works small business enterprise (PWSBE)

  1. North Star Enterprises - sub - $137,000.00
    Description of work: flagging (i.e. traffic control)

PWSBE goal: $136,363.60
PWSBE total: $137,000.00

Veteran-owned business (VOB)

  1. Strider Construction - sub - $55,000.00
    Description of work: pipe, excavation, agg base
  2. Strider Construction - sub - $0.00
    Description of work: pipe, excavation, agg base

VOB goal: $54,545.44
VOB total: $55,000.00

Second bidder: Massana Construction, Inc.
Bid amount: $2,848,542.85

Subcontractor named

  1. Massana Construction Inc.
    Description of work: rebar installation
  2. Massana Construction Inc.
    Description of work: structural steel installation

Public works small business enterprise (PWSBE)

  1. M2 Industrial Inc. - sub - $557,593.75
    Description of work: beam guardrail type 31

PWSBE goal: $142,427.14
PWSBE total: $557,593.75

Veteran-owned business (VOB)

  1. M2 Industrial Inc. - sub - $61,687.50
    Description of work: beam guardrail type 31 buried, terminal type 2

VOB goal: $56,970.86
VOB total: $61,687.50

Third bidder: Dirt and Aggregate Interchange, Inc.
Bid amount: $2,957,923.63

Subcontractor named

  1. None proposed
    Description of work: none proposed

Public works small business enterprise (PWSBE)

  1. North Star Enterprises, Inc. - sub - $372,668.00
    Description of work: traffic control

PWSBE goal: $147,896.18
PWSBE total: $372,668.00 

Veteran-owned business (VOB)

  1. Strider Construction Co., Inc. - sub - $34,162.00
    Description of work: cement conc traffic curb
  2. Strider Construction Co., Inc. - sub - $113,875.00 
    Description of work: preparation
  3. Strider Construction Co., Inc. - sub - $75,009.25 
    Description of work: drainage
  4. Strider Construction Co., Inc. - sub - $102,665.00 
    Description of work: storm sewer
  5. Strider Construction Co., Inc. - sub - $142,000.00 
    Description of work: surfacing
  6. Strider Construction Co., Inc. - sub - $15,440.00 
    Description of work: erosion control
  7. Strider Construction Co., Inc. - sub - $10,818.00 
    Description of work: shoring, excavation, SPCC plan

VOB goal: $59,158.47
VOB total: $493,969.25 
 

Item no. 2: SR 124, US 12 Interchange EB Bridge Repair

Contract number: XE3675
Engineer's estimate: $2,524,976.50
Number of addenda: 3
Number of bidders: 11/6
Award status: awarded 2/3/2026

Preliminary bid total results

Apparent low: Granite Construction Company - $1,726,198.80
Apparent second: Apollo, Inc. - $1,797,090.00
Apparent third: Hamilton Construction Co. - $1,875,208.50

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $1,726,198.80

Subcontractor named

  1. Ridgetop Electric LLC
    Description of work: electrical (conduit installation)

Second bidder: Apollo, Inc.
Bid amount: $1,797,090.00

Subcontractor named

  1. Ridgetop Electric, LLC
    Description of work: electrical
  2. Apollo. Inc.
    Description of work: structural steel
  3. Harris Group
    Description of work: rebar

Third bidder: Hamilton Construction Co.
Bid amount: $1,875,208.50

Subcontractor named

  1. Hamilton Construction Co.
    Description of work: structural steel installation
  2. Harris Rebar Columbia Basin, Inc.
    Description of work: rebar installation
  3. Colvico, Inc. (COLVII*134D6)
    Description of work: electrical
     

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.