Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractor's bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.
     

4/15/2026 bid opening - Olympia, WA

Item no. 1: I-5, Koontz Rd to S of Alder St. w Exceptions - Paving

Contract number: XE3709
Engineer's estimate: $3,587,704.30
Number of addenda: 3
Number of bidders: 4/3
Award status: pending

Preliminary bid total results

Apparent low: Kerr Contractors Oregon, LLC - $3,207,781.69
Apparent second: Lakeside Industries, Inc. - $3,329,900.00
Apparent third: Granite Construction Company - $3,358,733.29

Verified bid total results

Low bidder: Apparent low: Kerr Contractors Oregon, LLC
Bid amount: $3,207,781.69

Subcontractor named

  1. None proposed
    Description of work: none proposed

Second bidder: Lakeside Industries, Inc.
Bid amount: $3,329,900.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Third bidder: Granite Construction Company
Bid amount: $3,358,733.29

Subcontractor named

  1. None proposed
    Description of work: none proposed
     

4/8/2026 bid opening - Olympia, WA

Item no. 1: SR 500, I-5 at 39th St Corridor Connection

Contract number: XE3706
Engineer's estimate: $631,104.00 
Number of addenda: 2
Number of bidders: 5/3
Award status: pending

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $617,000.00
Apparent second: Kerr Contractors Oregon, LLC - $652,749.00
Apparent third: Nutter Corporation DBA Nutter Underground Utilities Co. Inc. - $725,579.00

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $617,000.00

Second bidder: Kerr Contractors Oregon, LLC
Bid amount: $652,749.00

Third bidder: Nutter Corporation DBA Nutter Underground Utilities Co. Inc.
Bid amount: $725,579.00
 

4/1/2026 bid opening - Olympia, WA

Item no. 1: WSF/Systemwide Ferry Terminal VTS Mech / Elec Rehabilitation

Contract number: XE3703
Engineer's estimate base: $5,993,636.40 
Funds available: $7,900,000.00
Number of addenda: 1
Number of bidders: 6/4
Award status: awarded 4/14/2026

Preliminary bid total results

Apparent low: IMCO General Construction, Inc. - Base $8,609,064.00
Apparent second: Manson Construction Co. - Base $8,737,699.40
Apparent third: Pacific Pile & Marine, L.P. - Base $9,372,830.60**

Verified bid total results

Low bidder: IMCO General Construction, Inc.
Bid amount: Base $8,609,064.00

Subcontractor named

  1. IMCO General Construction, Inc. - self-perform
    Description of work: structural steel installation
  2. Elite Electrical Contractors, Inc. (ELITEEC044DA)
    Description of work: electrical

Public works small business enterprise (PWSBE)

  1. Elite Electrical Contractors, Inc. - sub - $456,838.00
    Description of work: electrical

PWSBE goal: $430,453.20
PWSBE total: $456,838.00

Veteran-owned business (VOB)

  1. Thompson Metal Fab, Inc. - manufacturer/supplier - $182,736.00
    Description of work: structural steel fabrication

VOB goal: $172,181.28
VOB total: $182,736.00

Second bidder: Manson Construction Co.
Bid amount: Base $8,737,699.40

Subcontractor named

  1. Manson Construction Co. - self-perform
    Description of work: structural steel installation
  2. Elite Electrical Contractors, Inc. (License #ELITEEC044DA)
    Description of work: electrical

Public works small business enterprise (PWSBE)

  1. Elite Electrical Contractors, Inc. - sub - $1,334,527.00
    Description of work: electrical, controls (partial)

PWSBE goal: $436,884.97
PWSBE total: $1,334,527.00

Veteran-owned business (VOB)

  1. Dunlap Towing Company - sub - $185,000.00
    Description of work: towing services

VOB goal: $174,753.988
VOB total: $185,000.00

Third bidder: Pacific Pile & Marine, L.P.
Bid amount: Base $9,372,830.60***

Subcontractor named

  1. Pacific Pile & Marine, LP - PACIFPM922J3
    Description of work: structural steel installation
  2. Pacific Pile & Marine, LP - PACIFPM922J3
    Description of work: rebar installation
  3. Elite Electrical Contractors, Inc. - ELITEEC044DA
    Description of work: electrical

Public works small business enterprise (PWSBE)

  1. Elite Electrical Contractors, Inc. - sub - $24,000.00 
    Description of work: electrical - partial (mobilization)
  2. Elite Electrical Contractors, Inc. - sub - $200,000.00 
    Description of work: VTS electrical system - Anacortes
  3. Elite Electrical Contractors, Inc. - sub - $200,000.00 
    Description of work: VTS Electrical System - Coupeville
  4. Elite Electrical Contractors, Inc. - sub - $200,000.00 
    Description of work: VTS Electrical System - Lopez
  5. Elite Electrical Contractors, Inc. - sub - $200,000.00 
    Description of work: VTS Electrical System - Orcas
  6. Elite Electrical Contractors, Inc. - sub - $50,000.00 
    Description of work: VTS Mech & Controls Integration - Anacortes
  7. Elite Electrical Contractors, Inc. - sub - $50,000.00  
    Description of work: VTS Mech & Controls Integration - Coupeville
  8. Elite Electrical Contractors, Inc. - sub - $50,000.00  
    Description of work: VTS Mech & Controls Integration - Lopez
  9. Elite Electrical Contractors, Inc. - sub - $50,000.00  
    Description of work: VTS Mech & Controls Integration - Orcas

PWSBE goal: $468,641.53
PWSBE total: $1,024,000.00

Veteran-owned business (VOB)

  1. Thompson Metal Fab, Inc. - manufacturer/supplier - $400,000.00 
    Description of work: Anacortes slip 1 structural steel 
  2. Thompson Metal Fab, Inc. - manufacturer/supplier - $400,000.00 
    Description of work: Coupeville structural steel 
  3. Thompson Metal Fab, Inc. - manufacturer/supplier - $400,000.00 
    Description of work: Lopez structural steel 
  4. Thompson Metal Fab, Inc. - manufacturer/supplier - $400,000.00 
    Description of work: Orcas structural steel 
  5. Thompson Metal Fab, Inc. - manufacturer/supplier - $200,000.00 
    Description of work: Anacortes slip 1 counterweight assembly 
  6. Thompson Metal Fab, Inc. - manufacturer/supplier - $200,000.00 
    Description of work: Coupevill counterweight assembly 
  7. Thompson Metal Fab, Inc. - manufacturer/supplier - $200,000.00 
    Description of work: Lopez counterweight assembly 
  8. Thompson Metal Fab, Inc. - manufacturer/supplier - $200,000.00 
    Description of work: Orcas counterweight assembly 

VOB goal: $187,456.61
VOB total: $2,400,000.00
 

Item no. 2: I-90, EB Mercer Slough Bridge Rehab

Contract number: XE3704
Engineer's estimate: $4,740,838.90
Number of addenda: 2
Number of bidders: 9/7
Award status: pending

Preliminary bid total results

Apparent low: Hamilton Construction Co. - $3,608,392.00   
Apparent second: Stellar J. Corporation - $4,277,484.00
Apparent third: Massana Construction, Inc. - $4,338,096.00

Verified bid total results

Low bidder: Hamilton Construction Co.
Bid amount: $3,608,392.00

Subcontractor named

  1. Hamilton Construction Co.
    Description of work: structural steel installation & rebar installation

Second bidder: Stellar J. Corporation
Bid amount: $4,277,484.00

Subcontractor named

  1. Stellar J Corporation - STELLJC045J9
    Description of work: structural steel installation
  2. Stellar J Corporation - STELLJC045J9
    Description of work: rebar installation

Third bidder: Massana Construction, Inc. (MASSACI920RW)
Bid amount: $4,338,096.00

Subcontractor named

  1. Massana Construction, Inc. 
    Description of work: structural steel installation, rebar installation,
     

Item no. 3: US 101, N of Ocean Beach Rd to Jefferson Co Line Paving

Contract number: XE3705
Engineer's estimate: $25,973,856.70
Number of addenda: 1
Number of bidders: 4/2
Award status: pending

Preliminary bid total results

Apparent low: Lakeside Industries, Inc. - $23,894,910.60
Apparent second - Granite Construction Company - $34,686,068.90

Verified bid total results

Low bidder: Lakeside Industries, Inc.
Bid amount: $23,894,910.60

Subcontractor named

  1. None proposed
    Description of work: none proposed

Second bidder: Granite Construction Company
Bid amount: $34,686,068.90

Subcontractor named

  1. None proposed
    Description of work: none proposed
     

Item no. 4: I-90, Sullivan to Idaho State Line ITS Improvements

Contract number: XE3707
Engineer's estimate: $1,433,901.11
Number of addenda: 2
Number of bidders: 3/3
Award status: awarded 4/14/2026

Preliminary bid total results

Apparent low: Northeast Electric, LLC - $1,088,000.00
Apparent second: Colvico, Inc. - $1,108,011.50
Apparent third: Power City Electric, Inc. - $1,183,883.47

Verified bid total results

Low bidder: Northeast Electric, LLC
Bid amount: $1,088,000.00

Subcontractor named

  1. Northeast Electric - Self Perform - NORTHEL957D4
    Description of work: electrical
  2. Northeast Electric - Self Perform - NORTHEL957D4
    Description of work: structural steel
  3. Northeast Electric - Self Perform - NORTHEL957D4
    Description of work: rebar

Second bidder: Colvico, Inc.
Bid amount: $1,108,011.50

Subcontractor named

  1. Colvico, Inc to Self Perform (COLVII*134D6)
    Description of work: electrial

Third bidder: Power City Electric, Inc.
Bid amount: $1,183,883.47

Subcontractor named

  1. Power City Electric, Inc. / POWERCE994CK
    Description of work: electrical, sign structures - self performing
  2. REV Drilling / WA REVDRDI836JC / ID RCE-48125
    Description of work: rebar replacement
     

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

1,557 work zone-related crashes

were recorded on state highways in 2025.

542 people were injured

in 2025 due to work zone-related crashes. 

29% increase in fatality collisions

in work zones from 2024 to 2025.