Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractor's bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.
     

12/17/2025 bid opening - Olympia, WA

Item no. 1: SR 20, Campbell Lake Road Intersection Improvements

Contract number: XE3672
Engineer's estimate: $2,813,956.93
Number of addenda: 3
Number of bidders: 7/4
Award status: pending

Preliminary bid total results

Apparent low: Faber Construction Corp. - $2,956,236.47
Apparent second: Granite Construction Company - $3,569,871.95
Apparent third: Midmountain Contractors, Inc. - $4,083,000.00

Verified bid total results

Low bidder: Faber Construction Corp.
Bid amount: $2,956,236.47

Subcontractor named

  1. Northwest Electric Whatcom Inc (NORTHEI044N8)
    Description of work: electrical
  2. Faber Construction Corporation
    Description of work: rebar installation
  3. Faber Construction Corporation
    Description of work: structural steel installation

Second bidder: Granite Construction Company
Bid amount: $3,569,871.95

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical

Third bidder: Midmountain Contractors, Inc.
Bid amount: $4,083,000.00

Subcontractor named

  1. MidMountain Contractors Inc. (MIDMOCI972OB)
    Description of work: rebar
  2. Vector Electrical Group LLC (VECTOEG779NW)
    Description of work: electrical

Item no. 2: 2026 CRISI, Rural Rail Rehabilitation - P&L Branch - PCC

Contract number: XE3673
Engineer's estimate: $24,316,922.00
Number of addenda: 3
Number of bidders: 4/3
Award status: pending

Preliminary bid total results

Apparent low: Martinus Rail, LLC - $20,334,292.07
Apparent second: Railworks Track Systems, LLC - $21,361,450.10
Apparent third: Stacy and Witbeck, Inc. - $23,943,747.35

Verified bid total results

Low bidder: Martinus Rail, LLC
Bid amount: $20,334,292.07

Subcontractor named

  1. Railroad Signal Services Inc.
    Description of work: railroad signals
  2. Cole Concrete, LLC - COLECCL864JZ
    Description of work: concrete sidewalk and curbs

Second bidder: Railworks Track Systems, LLC
Bid amount: $21,361,450.10

Subcontractor named

  1. Modern Railway Systems
    Description of work: signal

Third bidder: Stacy and Witbeck, Inc.
Bid amount: $23,943,747.35

Subcontractor named

  1. Stacy and Witbeck, Inc.
    Description of work: structural steel installation
  2. Stacy and Witbeck, Inc.
    Description of work: rebar installation
     

12/10/2025 bid opening - Olympia, WA

Item no. 1: SR 9, Unnamed to Nookachamps & Hansen Crks Fish Passage

Contract number: XE3670
Engineer's estimate: $5,992,562.00 
Number of addenda: 2
Number of bidders: 10/6
Award status: pending

Preliminary bid total results

Apparent low: Faber Construction Corp. - $5,730,847.10
Apparent second: Interwest Construction, Inc. - $5,743,364.90 
Apparent third: Oma Construction Inc. - $6,186,707.00

Verified bid total results

Low bidder: Faber Construction Corp.
Bid amount: $5,730,847.10

Subcontractor named

  1. Faber Construction Corp.
    Description of work: rebar installation
  2. Faber Construction Corp.
    Description of work: structural steel installation

Public works small business enterprise (PWSBE)

  1. Inland Northwest Precast - manufacturer/supplier - $568,613.00
    Description of work: precast concrete structures

PWSBE goal: $286,542.36
PWSBE total: $568,613.00

Veteran-owned business (VOB)

  1. Inland Northwest Precast - manufacturer/supplier - $568,613.00
    Description of work: precast concrete structures

VOB goal: $114,616.94
VOB total: $568,613.00

Second bidder: Interwest Construction, Inc.
Bid amount: $5,743,364.90 

Subcontractor named

  1. Interwest Construction, Inc. #INTERCI121OF
    Description of work: structural steel installation
  2. Rebar International, Inc. #REBARII110NG
    Description of work: rebar installation
  3. Electric West, Inc. #ELECTWI030J1
    Description of work: electrical

Public works small business enterprise (PWSBE)

  1. O'Bunco Engineering Intl. Inc. - sub - $73,635.00
    Description of work: survey
  2. Outwest Landscaping & Irrigation, Inc. - sub - $131,732.50
    Description of work: landscaping
  3. Magna Services - sub - $89,000.00
    Description of work: dewatering

PWSBE goal: $287,168.25
PWSBE total: $294,367.50 

Veteran-owned business (VOB)

  1. Inland Northwest Precast - manufacturer/supplier - $442,821.00
    Description of work: supply of contractor designed buried structure

VOB goal: $114,867.30
VOB total: $442,821.00 

Third bidder: Oma Construction Inc.
Bid amount: $6,186,707.00

Subcontractor named

  1. Rebar International REBARll110NG
    Description of work: rebar installation

Public works small business enterprise (PWSBE)

  1. M2 Industrial, Inc. - sub - $24,000.00
    Description of work: mobilization (partial)
  2. M2 Industrial, Inc. - sub - $2,250.00
    Description of work: beam guardrail type 31 (partial)
  3. M2 Industrial, Inc. - sub - $22,800.00
    Description of work: beam guardrail transition type
  4. M2 Industrial, Inc. - sub - $17,600.00
    Description of work: beam guardrail type 31 (partial)
  5. M2 Industrial, Inc. - sub - $19,734.00
    Description of work: temporary barrier (partial)
  6. M2 Industrial, Inc. - sub - $151,000.00
    Description of work: permanent impact attenuator (partial)
  7. M2 Industrial, Inc. - sub - $22,000.00
    Description of work: temporary impact attenuator (partial)
  8. M2 Industrial, Inc. - sub - $392.00
    Description of work: barrier delineator (partial)
  9. JJH Construction - sub - $6,000.00
    Description of work: earthwork (partial)
  10. Rebar International - sub - $11,901.00
    Description of work: buried structure 1 (partial)
  11. Rebar International - sub - $34,725.00
    Description of work: buried structure 2 (partial)

PWSBE goal: $309,335.35
PWSBE total: $309,402.00

Veteran-owned business (VOB)

  1. JJH Construction - sub - $124,000.00
    Description of work: earthwork (partial)

VOB goal: $123,734.14
VOB total: $124,000.00
 

12/3/2025 bid opening - Olympia, WA

Item no. 1: I-90, S Fork Snoqualmie River Bridge - Deck Rehabilitation

Contract number: XE3668
Engineer's estimate: $739,354.00
Number of addenda: 1
Number of bidders: 6/6
Award status: awarded 12/12/2025

Preliminary bid total results

Apparent low: Combined Construction, Inc. - $600,900.00
Apparent second: Massana Construction, Inc. - $632,790.00
Apparent third: Midmountain Contractors, Inc. - $656,090.00

Verified bid total results

Low bidder: Combined Construction, Inc.
Bid amount: $600,900.00

Second bidder: Massana Construction, Inc.
Bid amount: $632,790.00

Third bidder: Midmountain Contractors, Inc.
Bid amount: $656,090.00

Item no. 2: I-5, Koontz Rd Bridge - Emergency Bridge Repair

Contract number: XE3671
Engineer's estimate: $1,059,092.00
Number of addenda: 1
Number of bidders: 13/9
Award status: awarded 12/15/2025

Preliminary bid total results

Apparent low: Stellar J. Corporation - $896,358.00
Apparent second: M.J. Hughes Construction, Inc. - $905,326.00
Apparent third: Farline Bridge, Incorporated - $935,359.00

Verified bid total results

Low bidder: Stellar J. Corporation
Bid amount: $896,358.00

Subcontractor named

  1. Rebar International - REBARII110NG
    Description of work: rebar
  2. Stellar J. Corporation - self perform
    Description of work: structural steel

Second bidder: M.J. Hughes Construction, Inc.
Bid amount: $905,326.00

Subcontractor named

  1. MJ Hughes Construction
    Description of work: reinforcing steel and structural steel if any

Third bidder: Farline Bridge, Incorporated
Bid amount: $935,359.00

Subcontractor named

  1. Pacific Northwest Reinforcing, Inc. - WA# PNWRERI815PN
    Description of work: rebar supply & installation

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down on ice and snow.

It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.

Carry chains, practice installing them.

Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.

Pack your winter car kit.

Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.