Contract summary
Requires constructing a sign bridge, paving ramps at Wellesley Avenue, paving the roundabout for northbound ramps at Freya St, and improvements to Market St. This work consists of removing drainage structures, sidewalk, and curb/gutter, roadway excavation, installing storm sewer items, paving, erosion control, seeding, mulching, curb, sidewalk, guardrail, signing, ITS revisions, pavement markings, traffic control and other work. Involves 71 items and 60 working days. Work class 5.