Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

3/8/2023 bid opening - Olympia, WA

Item no. 1: SR 542, Squalicum Creek to Bellingham Bay Fish Passage

Contract number: 009937
Engineer's estimate: $8,932,692.25
Number of addenda: 2
Number of bidders: 5/3
Award status: awarded 3/13/2023

Preliminary bid total results

Apparent low: Interwest Construction, Inc. - $8,787,878.78
Apparent second: IMCO General Construction, Inc. - $9,212,662.18
Apparent third: Granite Construction Company - $10,276,629.58

Verified bid total results

Low bidder: Interwest Construction, Inc.
Bid amount: $8,787,878.78

Subcontractor named

  1. Interwest Construction, Inc. - self perform
    Description of work: structural steel
  2. Rebar International, Inc.
    Description of work: rebar installation
  3. Electric West, Inc.
    Description of work: electrical

Second bidder: IMCO General Construction, Inc.
Bid amount: $9,212,662.18

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. Rebar International, Inc.
    Description of work: rebar installation
  3. IMCO General Construction, Inc.
    Description of work: structural steel installation

Third bidder: Granite Construction Company
Bid amount: $10,276,629.58

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. Rebar International
    Description of work: rebar installation for cast in place concrete

Item no. 2: I-5, NB 206th St Vic to SR 516 Pavement Repair

Contract number: 009942
Engineer's estimate: $597,804.00
Number of addenda: 3
Number of bidders: 3/3
Award status: pending

Preliminary bid total results

Apparent low: Penhall Company - $687,214.57
Apparent second: Acme Concrete Paving, Inc. - $836,164.00
Apparent third: Tucci & Sons, Inc. - $976,490.50

Verified bid total results

Low bidder: Penhall Company
Bid amount: $687,214.57

Small business enterprise (SBE)

  1. Hughes Group, LLC - sub - $54,512.32
    Description of work: Traffic Control

SBE goal: $34,360.73
SBE total: $54,512.32

Veteran-owned business (VOB)

  1. Hughes Group, LLC - sub - $24,374.79
    Description of work: Traffic Control

VOB goal: $13,744.29
VOB total: $24,374.79

Second bidder: Acme Concrete Paving, Inc.
Bid amount: $836,164.00

Small business enterprise (SBE)

  1. BC Traffic, LLC - sub - $30,793.00
    Description of work: other temp traffic control device
  2. BC Traffic, LLC - sub - $34,980.96
    Description of work: other traffic control labor

SBE goal: $41,808.20
SBE total: $65,773.96

Veteran-owned business (VOB)

  1. Acme Concrete Paving, Inc. - prime - $50,000.00
    Description of work: cement concrete grinding

VOB goal: $16,723.28
VOB total: $50,000.00

Third bidder: Tucci & Sons, Inc.
Bid amount: $976,490.50

Small business enterprise (SBE)

  1. Advanced Government Services, Inc. - AGS - sub - $50,000.00
    Description of work: traffic control

SBE goal: $48,824.52
SBE total: $50,000.00

Veteran-owned business (VOB)

  1. Acme Concrete Paving, Inc. - sub - $22,000.00
    Description of work: grinding

VOB goal: $19,529.81
VOB total: $22,000.00

Item no. 3: SR 26, SR 261 to Colfax Install Shoulder Rumble Strip (Small Works Roster)

Contract number: 009944
Engineer's estimate: $297,398.00
Number of addenda: 0
Number of bidders: 4/3
Award status: pending

Preliminary bid total results

Apparent low: Construction Ahead, Inc. DBA Pavement Surface Control - $318,727.00
Apparent second: North Star Enterprises I, Inc. - $347,587.00
Apparent third: Specialized Pavement Marking, LLC - $488,471.00

Verified bid total results

Low bidder: Construction Ahead, Inc. DBA Pavement Surface Control
Bid amount: $318,727.00

Disadvantaged business enterprise (DBE) 

  1. Advanced Government Services, Inc. - sub - $25,000.00
    Description of work: traffic control

DBE goal: $22,310.89
DBE total: $25,000.00

Second bidder: North Star Enterprises I, Inc.
Bid amount: $347,587.00

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - prime - $30,000.00
    Description of work: traffic control, shoulder rumble strips, edge line rumble strips, construction signs Class A's

DBE goal: $24,331.09
DBE total: $30,000.00

Third bidder: Specialized Pavement Marking, LLC 
Bid amount: $488,471.00

Disadvantaged business enterprise (DBE) 

  1. North Star Enterprises - sub - $30,000.00
    Description of work: project traffic control
  2. North Star Enterprises - sub - $2,250.00
    Description of work: inlet protection
  3. North Star Enterprises - sub - $4,000.00
    Description of work: repair transportable attenuator
  4. North Star Enterprises - sub - $2,352.00
    Description of work: portable changeable message signs
  5. North Star Enterprises - sub - $6,240.00
    Description of work: construction area signs
  6. North Star Enterprises - sub - $12,000.00
    Description of work: mobilization

DBE goal: $34,192.97
DBE total: $56,842.00

 

3/1/2023 bid opening - Olympia, WA

Item no. 1: SR 539, Duffner Ditch Fish Passage

Contract number: 009935
Engineer's estimate: $1,954,554.00
Number of addenda: 2
Number of bidders: 7/5
Award status: pending

Preliminary bid total results

Apparent low: Faber Construction Corp. - $2,719,678.90
Apparent second: Colacurcio Brothers, Inc. - $3,224,896.50
Apparent third: Laser Underground & Earthworks, Inc. - $3,306,977.00

Verified bid total results

Low bidder: Faber Construction Corp.
Bid amount: $2,719,678.90

Subcontractor named

  1. Electric West
    Description of work: Electrical
  2. Faber Construction Corporation
    Description of work: rebar installation
  3. Faber Construction Corporation
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering - sub - $21,875.00
    Description of work: survey
  2. M2 Industrial - sub - $83,064.00
    Description of work: guardrail
  3. Advanced Government Services - sub - $205,823.00
    Description of work: traffic control
  4. Electric West - sub - $103,380.00
    Description of work: electrical
  5. Reece Construction - sub - $7,980.00
    Description of work: asphalt planing
  6. Magna Services - sub - $72,500.00
    Description of work: dewatering

DBE goal: $435,148.62
DBE total: $494,622.00

Second bidder: Colacurcio Brothers, Inc.
Bid amount: $3,224,896.50

Subcontractor named

  1. Electric West, Inc.
    Description of work: electrical
  2. self - Colacurcio Brothers, Inc.
    Description of work: rebar installation
  3. self - Colacurcio Brothers, Inc.
    Description of work: structural steel installation

Disadvantaged business enterprise (DBE) 

  1. Electric West, Inc. - sub - $103,380.00
    Description of work: electrical
  2. Magna Services - sub - $72,500.00
    Description of work: dewatering
  3. Matia Contractors, Inc. - sub - $54,802.50
    Description of work: landscaping services, erosion & sediment control
  4. M2 Industrial, Inc. - sub - $76,370.40
    Description of work: guardrail construction, install of temp impact attenuators, concrete barriers
  5. BC Traffic, LLC - sub - $190,000.00
    Description of work: flagging and traffic control management
  6. Land Development Engineering & Surveying, Inc. - sub - $21,875.00
    Description of work: surveying

DBE goal: $515,983.44
DBE total: $518,927.90

Third bidder: Laser Underground & Earthworks, Inc.
Bid amount: $3,306,977.00

Subcontractor named

  1. MacDonald Miller Facility Solutions, LLC
    Description of work: any HVAC
  2. MacDonald Miller Facility Solutions, LLC
    Description of work: any plumbing
  3. Electric West, Inc.
    Description of work: any electrical

Disadvantaged business enterprise (DBE) 

  1. AGS - sub - $245,000.00
    Description of work: traffic control
  2. Electric West, Inc. - sub - $100,380.00
    Description of work: electrical
  3. M2 Industrial - sub - $83,000.00
    Description of work: guardrail & barrriers
  4. LDES - sub - $29,000.00
    Description of work: survey
  5. Outwest Landscape - sub - $73,000.00
    Description of work: landscape

DBE goal: $529,116.32
DBE total: $530,380.00

Item no. 2: I-90, Silica Rd I/C to U Rd I/C- Ramp Paving

Contract number: 009936
Engineer's estimate: $3,217,290.10
Number of addenda: 1
Number of bidders: 2/2
Award status: pending

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $2,822,222.00
Apparent second: Granite Construction Company - $4,358,901.57

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $2,822,222.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. Audi Construction, LLC - sub - $25,000.00
    Description of work: the hauling of grindings and asphalt
  2. Changing Directions, LLC - sub - $408,360.00
    Description of work: traffic control services and temporary pavement marking
  3. O'Bunco Engineering - sub - $19,425.00
    Description of work: land surveying: GPS control, construction, layout/staking

DBE goal: $451,555.52
DBE total: $452,785.00

Second bidder: Granite Construction Company
Bid amount: $4,358,901.57

Subcontractor named

  1. Knobel Electric, Inc.
    Description of work: electrical 

Disadvantaged business enterprise (DBE) 

  1. O'Bunco Engineering Int'l, Inc. - sub - $19,425.00
    Description of work: survey for pavement marking
  2. North Star Enterprises 1, Inc. - sub - $651,183.80
    Description of work: traffic control, removal and installation of guide posts & tubular markers, temp. stripe, class A signs, joint seal
  3. Pro Eagle Trucking - sub - $41,500.00
    Description of work: water truck equipment rental with operator

DBE goal: $697,424.25
DBE total: $712,108.80

Item no. 3: I-90, Ritzville to Tokio Paving

Contract number: 009938
Engineer's estimate: $15,375,031.50
Number of addenda: 2
Number of bidders: 5/3
Award status: awarded 3/16/2023

Preliminary bid total results

Apparent low: Central Washington Asphalt, Inc. - $11,262,234.00
Apparent second: CPM Development Corporation - $12,500,000.00
Apparent third: Granite Construction Company - $14,937,363.20

Verified bid total results

Low bidder: Central Washington Asphalt, Inc.
Bid amount: $11,262,234.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Small business enterprise (SBE)

  1. North Star Enterprises - sub - $25,000.00
    Description of work: mobilization
  2. North Star Enterprises - sub - $44,965.00
    Description of work: shoulder rumble strips
  3. North Star Enterprises - sub - $510,000.00
    Description of work: project temp. traffic control
  4. North Star Enterprises - sub - $9,210.00
    Description of work: class A signs

SBE goal: $563,111.70
SBE total: $589,175.00

Veteran-owned business (VOB)

  1. Dungeness Construction - sub - $20,825.00
    Description of work: rem exist overlay br. 90/332N
  2. Dungeness Construction - sub - $20,825.00
    Description of work: rem exist overlay br. 90/322S
  3. Dungeness Construction - sub - $34,475.00
    Description of work: rem exist overlay br. 90/327
  4. Dungeness Construction - sub - $20,685.00
    Description of work: rem exist overlay bridge deck
  5. Dungeness Construction - sub - $20,685.00
    Description of work: rem exist overlay br. 90/330S
  6. Dungeness Construction - sub - $17,050.00
    Description of work: rem exist overlay br. 90/332
  7. Columbia Basin Striping - sub - $8,000.00
    Description of work: mobilization
  8. Columbia Basin Striping - sub - $6,125.00
    Description of work: remove guide posts
  9. Columbia Basin Striping - sub - $63,675.00
    Description of work: guide posts
  10. Columbia Basin Striping - sub - $101,210.00
    Description of work: paint line
  11. Columbia Basin Striping - sub - $12,840.00
    Description of work: plastic stop line
  12. Columbia Basin Striping - sub - $8,000.00
    Description of work: plastic traffic arrow
  13. Columbia Basin Striping - sub - $4,228.00
    Description of work: painted drainage marking
  14. Columbia Basin Striping - sub - $800.00
    Description of work: painted aerial surveillance - full
  15. Columbia Basin Striping - sub - $800.00
    Description of work: painted aerial surveillance - 1/2
  16. Columbia Basin Striping - sub - $101,730.00
    Description of work: temp pavement mrkg - short
  17. Columbia Basin Striping - sub - $4,296.00
    Description of work: painted wide line

VOB goal: $337,867.02
VOB total: $446,249.00

Second bidder: CPM Development Corporation
Bid amount: $12,500,000.00

Subcontractor named

  1. Colvico, Inc.
    Description of work: electrical

Small business enterprise (SBE)

  1. North Star Enterprises, Inc. - sub - $6,125.00
    Description of work: removing guide post
  2. North Star Enterprises, Inc. - sub - $105,518.40
    Description of work: joint adhesive for bituminous pavement
  3. North Star Enterprises, Inc. - sub - $6,890.00
    Description of work: inlet protection
  4. North Star Enterprises, Inc. - sub - $63,675.00
    Description of work: flexible guide post
  5. North Star Enterprises, Inc. - sub - $44,965.00
    Description of work: shoulder rumble strip type 1
  6. North Star Enterprises, Inc. - sub - $107,958.40
    Description of work: temporary striping
  7. North Star Enterprises, Inc. - sub - $280,790.00
    Description of work: traffic control
  8. North Star Enterprises, Inc. - sub - $9,210.00
    Description of work: construction signs class A

SBE goal: $625,000.00
SBE total: $625,131.80

Veteran-owned business (VOB)

  1. Wm. Winkler Company - sub - $125,245.00
    Description of work: planing bituminous pavement (partial) - trucking
  2. Acme Concrete Paving, Inc. - sub - $115,400.00
    Description of work: planing bituminous pavement (partial) - trucking
  3. Dungeness Construction Corporation - sub - $134,545.00
    Description of work: removing existing overlay from bridge deck

VOB goal: $375,000.00
VOB total: $375,190.00

Third bidder: Granite Construction Company
Bid amount: $14,937,363.20

Subcontractor named

  1. Knobel Electric, Inc.
    Description of work: electrical 

Small business enterprise (SBE)

  1. North Star Enterprises, Inc. - sub - $44,965.00
    Description of work: sh rumble strip
  2. North Star Enterprises, Inc. - sub - $107,958.40
    Description of work: temp pavement markings - SD
  3. North Star Enterprises, Inc. - sub - $605,000.00
    Description of work: project temp traffic control

SBE goal: $746,868.16
SBE total: $757,923.40

Veteran-owned business (VOB)

  1. M2 Industrial, Inc. - sub - $18,210.50
    Description of work: rem/reset GR blocks
  2. M2 Industrial, Inc. - sub - $2,460.00
    Description of work: beam GR block
  3. M2 Industrial, Inc. - sub - $4,860.00
    Description of work: beam GR post
  4. JMR Trucking, Inc. - sub - $42,000.00
    Description of work: planing bit pvmt (partial) - haul
  5. JMR Trucking, Inc. - sub - $10,080.00
    Description of work: HMA (partial) - haul
  6. Dungeness Construction - sub - $134,545.00
    Description of work: rem BR deck OL
  7. Columbia Basin Striping - sub - $20,000.00
    Description of work: mobilization (partial)
  8. Columbia Basin Striping - sub - $6,125.00
    Description of work: rem guide post
  9. Columbia Basin Striping - sub - $63,675.00
    Description of work: guide post
  10. Columbia Basin Striping - sub - $101,210.00
    Description of work: paint line
  11. Columbia Basin Striping - sub - $12,840.00
    Description of work: plastic stop line
  12. Columbia Basin Striping - sub - $8,000.00
    Description of work: plastic traffic arrow
  13. Columbia Basin Striping - sub - $4,228.00
    Description of work: painted drainage marking
  14. Columbia Basin Striping - sub - $1,600.00
    Description of work: painted aerial full/half marker
  15. Columbia Basin Striping - sub - $16,424.50
    Description of work: class A signs
  16. Columbia Basin Striping - sub - $4,296.00
    Description of work: painted wide line

VOB goal: $448,120.90
VOB total: $450,554.00

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

Slow down – lives are on the line.

In 2022, speeding continued to be a top reason for work zone crashes.

Even one life lost is too many.

Each year about 670 people are killed nationally in highway work zones. In 2022, Washington had six fatal work zone crashes on state roads.

It's in EVERYONE’S best interest.

95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.