Legislative reports archive

See legislative reports for past bienniums.

Legislative reports for the 2021-2023 biennium

Orig Bill
No
Orig
Sect
Study Title/ Topic Report
Due Date
SSB 5165 1004 (3)
1005 (3)
Transfer: MVA State and Federal Appropriations (PDF 222KB) 8/13/2021
SSB 5165 306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Interim Report and Appendices (PDF 2.22MB) 9/15/2021
SSB 5165 215 (9) Public Health Association with Homeless Encampments on Department owned rights of way (PDF 994KB) 10/1/2021
(semi-annually thereafter)
SHB 1514 4 Commute Trip Reduction Program Report - September 2021 (PDF 696KB) 10/1/2021
SSB 5165 306 (13) (b) Statewide Culvert Remediation Plan Report (PDF 83.6KB)  11/1/2021
SSB 5165 310 (2) Supplemental Freight Rail Investment Bank Project List (PDF 53.9KB) 11/15/21
SSB 5165 606 Amounts expended for transit, bicycle, pedestrian elements (PDF 141KB) 11/15/21
(Annually)
SSB 5165 313 Capital projects report - Quarter ending September 30, 2021 (PDF 1.54MB) 11/15/21
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 11/15/21
Quarterly
SSB 5165 601 Transfers (PDF 35.9KB) 11/22/21
SSB 5165 213 (4) Broadband facilities consolidation report (PDF 105 KB) 12/1/2021
SSB 5165 306 (12) (c) I-5 Interstate Bridge Replacement project Progress Report (PDF 1.94MB) 12/1/2021
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 809KB)

Apprenticeship Program Grant Awards (PDF 809KB)
12/1/2021
Annually
SSB 5165 311 (3) Pedestrian Safety/Safe Routes to school grant program report (PDF 909KB) 12/1/2021

RCW 47.66.100
RCW 47.66.030
RCW 47.66.030
RCW 47.66.120
SSB 5165
SSB 5165
RCW 47.66.080
RCW 47.06.110
RCW 70A.15.4060
RCW 70A.15.4100
RCW 47.01.330

3
3
1 (a)
4
220 (5)
220 (7) (b)

6
6
6
5
2021 Washington State Transportation Mobility Report (PDF 9.22MB)

Rural mobility grant program (PDF 9.22MB)
Regional mobility grant program (PDF 9.22MB)
Regional mobility grants prioritized project list (PDF 9.22MB)
Green Transportation Capital Grant Program project status update (PDF 9.22MB)
Region mobility grant Projects (PDF 9.22MB)
First Mile/Last Mile Connections (PDF 9.22MB)
Grant Programs Examination (PDF 9.22MB)
Report Summarizing the Public Transportation Plan progress (PDF 9.22MB)
Commute Trip Reduction Program (PDF 9.22MB)
State Agency Commute Trip Reduction Program (PDF 9.22MB)
Office of Transit Mobility (PDF 9.22MB)


 
12/1/2021
Annually


RCW 35.58.2796
RCW 47.66.110
 


2 (a)
6
 
2021 Transit Integration Report (PDF 3.15MB)

Annual report summarizing the status of the public transportation system coordination (PDF 3.15MB)
Report on the transit coordination grants that were awarded (PDF 3.15MB)

 
12/1/2021
Annually
RCW 35.58.2796 1 2020 Summary of Public Transportation (PDF 36.2MB) 12/1/2021
Annually
SSB 5165 209 (9) SR 520 Bridge Self-Insurance Evaluation (PDF 164KB) 12/15/2021
SSB 5165 216 (1) 2019-2021 Low-cost enhancement projects (PDF 8.79MB) 12/15/2021
(odd number years)
RCW 47.01.480 1 (a) Practical Design-related Title & Scope Change Request - I-5 Rebuild Chamber Way Interchange Improvements (PDF 187KB) 12/16/2021
SSB 5165 218 (3) Vehicle Miles Traveled Targets - Initial Technical Report (PDF 136KB) 12/31/21
RCW 47.64.360 2 FY 2021 WSF Performance Measures Report (PDF 844KB) 12/31/2021 Annually
SSB 5165 306 (9) (b)
209 (8)
I-405/SR 167 Financial Plan Final Report and Appendices (PDF 2.64MB) 1/1/2022
SSB 5165 221 (5) Staffing and Overtime for Engine & Deck Crewmembers 1/1/2022
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 224KB) 1/1/2022
RCW 47.60.830   FY21 Annual Diesel Fuel Price Hedging Report (PDF 388KB) 1/1/2022
Annually
SSB 5165 308 (2) Challenge Seattle project report (PDF 552KB) 1/15/2022
SSB 5165 219 (2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 1 & 2 (PDF 123KB) 2/15/2022
Semi-Annually
SSB 5165 313 Capital projects quarterly report - Quarter ending December 30, 2021 (PDF 2.10MB) 2/15/2022
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 2/15/2022
Quarterly
SSB 5165 719 Commercial Aviation Coordinating Commission Report - Six Locations (PDF 396KB) 2/15/2022
RCW 47.01.485 2 Local Governments Determination on Permits. (PDF 125KB) 3/1/2022
Annually
RCW 47.85.040 5 Report summarizing violations of environmental permits and regulations. (PDF 464KB) 3/1/2022
Annually
SSB 5156 310 (2) '21-23 Freight Rail Investment Bank (FRIB) Progress Report (PDF 82.8KB) 3/15/2022
Annually
ESSB 5689 219 (4) Interim Report - Modular Expansion Joint Noise Mitigation Study (PDF 555KB) 3/31/2022
SSB 5165 215 (9) Address risks to safety and public health regarding homeless encampments 4/1/2022
ESSB 5689 311 Capital projects quarterly report - Quarter ending March 31, 2022 (PDF 2.10MB) 5/15/22
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 5/15/22
Quarterly
ESSB 5689 305 (12) (c) I-5 Interstate Bridge Replacement project (PDF 1.33MB) 6/1/2022
ESSB 5689 305 (13) (b) Fish Passage Barrier Removal project (PDF 22.8KB) 6/1/2022
ESSB 5689 219 (3) Vehicle Miles of Travel Targets - Interim Report (PDF 470KB) 6/22/22
ESSB 5689 223 (2) Amtrak Cascades Service Development Plan - Progress Report (PDF 110KB) 6/30/2022
RCW 81.104.115 9 2021 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.37MB) 6/30/2022
Annually
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 232KB) 7/1/2022
ESSB 5689 220 (2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY22 Quarters 3 & 4 (PDF 126KB) 8/15/22
Semi-Annually
ESSB 5689 311 Capital projects quarterly report - Quarter ending June 30, 2022 (PDF 2.10MB) 8/15/22
Quarterly
ESSB 5689 601 (1) (l) Administrative Transfers (PDF 347KB) 8/15/22
Quarterly
RCW 47.01.495 4 Construction Program Business Plan (PDF 1.38MB) 9/30/22
Biennially
SSB 5165 103 Report on evaluation of short term and long term facility and information technology needs (in light of increased levels of remote work). Study by OFM with collaboration with WSDOT and the Office of Chief Information Officer (OCIO). 10/1/2022
RCW 47.04.285   2022 Biennial Transportation Attainment Report (PDF 426KB) 10/1/2022
Biennially
ESSB 5689 707 State Commercial Aviation Coordinating Commission Report (PDF 140KB) 10/15/2022
ESSB 5689 216 (9) Public Health Associated with Homeless Encampments on Department Owned Rights of Way (PDF 452KB) 11/1/2022
ESSB 5974 412 (5) (b) Clean Fuels Program - State Transportation Investment Credit Revenue Generation Forecast (PDF 208KB) 11/1/2022
Annually
ESSB 5689 311 Capital projects quarterly report - Quarter ending September 30, 2022 (PDF 1.14MB) 11/15/22
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 11/15/22
Quarterly
ESSB 5689 309  (2) & (6) FRAP/FRIB Prioritized List of Recommended Projects (PDF 113KB) 11/15/2022
ESSB 5689 602 Amounts expended for transit, bicycle, pedestrian elements (PDF 198KB) 11/15/22
(Annually)
ESSB 5689 221 (16) Grants Management System (PDF 692KB) 11/15/2022
ESSB 5689

209 (2)


209 (5)
 

FY2022 Toll Division Annual Report (PDF 3.55MB)

I-405 Express Toll Lane Project Performance Measure Reports (PDF 3.55MB)

Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 3.55MB)
11/30/2022
SHB 1379 1 (3) &
2 (3)

Commercial Unpiloted Aircraft System Coordinator and Commercial Drone Registration Fee Review and Recommendations (PDF 409KB)

12/1/2022
ESSB 5689 216 (5) Safety Rest Area Free Coffee Program report (PDF 51.9KB) 12/1/2022
SSB 5165 209 (10) Provide updated recommendations for cost allocation 12/1/2022
ESSB 5689 305 (12) (c) I-5 Interstate Bridge Replacement Program Progress Report (PDF 1.46MB) 12/1/2022
ESSB 5689 310 (3) Pedestrian/Bike and Safe Routes to School Programs Project Lists and Update (PDF 2.15MB) 12/1/2022
RCW 47.01.435

SSB 5165
6

917 (1)
Highway Construction Workforce Development Report (PDF 574KB)

Apprenticeship Program Grants Awards (PDF 574KB)
12/1/2022
Annually
SSB 5975 209 (5) Executive Summary: Recommended Approach and Funding Request for I-5 causeway (PDF 997KB) 12/1/2022
SSB 5975 209 (5) I-5 Study Seismic Report and Funding Request Report (PDF 1.37MB)

Appendix A - Structure Location Maps (PDF 929KB)
Appendix B - Geotechnical Hazard Maps (PDF 950KB)
Appendix C, Part 1 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.6MB)
Appendix C, Part 2 - Structures Seismic Vulnerability Analyses and Associated Level of Effort (PDF 45.8MB)
Appendix D - Retaining Walls and Embankments Analysis (PDF 369KB)
Appendix E - Seismic Vulnerability Analysis Study Example (PDF 1.42MB)
12/31/2022
ESSB 5689 218 (3) Community Workforce Agreement and Diversity, Equity, & Inclusion Report (PDF 254KB) 12/1/2022
SSB 5975 211 (6) Tiered NL3 LEAP List - Prioritize Projects Based on Community Impacts (PDF 427KB) 12/1/2022
ESSB 5689 222 (18) WSF Training & Workforce Development Status Report (PDF 298KB) 12/1/2022
ESSB 5974 420 Elimination of Fares for Amtrak Cascades Passengers 18 Years old and Under (PDF 113KB) 12/1/2022
ESSB 5974 417 (5) Connecting Communities Pilot Program Report (PDF 885KB) 12/1/2022
ESSB 5974 419 (5) School-Based Bicycle Safety Education Program Report (PDF 150KB) 12/1/2022
SSB 5975 204 Sustainable Aviation Grant Program Report (PDF 203KB) 12/1/2022
SSB 5975 308 (2) Active Transportation Projects - Ranked NL-2 LEAP List (PDF 380KB) 12/1/2022


RCW 47.66.030
RCW 47.66.100
RCW 47.66.120
ESSB 5689
ESSB 5689
RCW 47.01.330
RCW 47.06.110


3
4
221 (5)
221 (7) (b)

Washington State Public Transportation Mobility Report (PDF 9.49MB)

Regional mobility grants (PDF 9.49MB)
Rural Mobility Grants (PDF 9.49MB)
Green Transportation Capital Grant Project Project Status Update (PDF 9.49MB)
Regional Mobility Grant Projects (PDF 9.49MB)
First Mile/Last Mile Connection Grant Program's Effectiveness (PDF 9.49MB)
Office of Transmit Mobility Report (PDF 9.49MB)
Report Summarizing the Public Transportation Plan Progress (PDF 9.49MB)

12/1/2022
Annually
RCW 47.66.030 1 (a) Regional mobility grants prioritized list (PDF 719KB) 12/1/2022
Annually


RCW 35.58.2796

RCW 47.66.110


2 (a)

6
2022 Transit Integration Report (PDF 1.60MB)

Annual report summarizing the status of the public transportation system coordination (PDF 1.60MB)

Report on the transit coordination grants that were awarded(PDF 1.60MB)
12/1/2022
Annually
RCW 35.58.2796 1 2021 Summary of Public Transportation (PDF 34.9MB) 12/1/2022
Annually
RCW 47.66.120 1 (a) Green Transportation Capital Grant Program prioritized project list. (PDF 528KB) 12/1/22
(even-numbered years)
ESSB 5689 221 (15)  Frequent Transit Service Study Initial Report (PDF 1.87MB) 12/15/2022
RCW 47.64.360 2 FY2022 WSF Performance Measures Report (PDF 940KB) 12/31/2022 Annually
ESSB 5689 219 (4) Final Report of Reducing Noise Impacts from the SR 520 Expansion Joints (PDF 2.32MB) 12/31/2022
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 293KB) 1/1/2023
RCW 47.60.830   Annual Diesel Fuel Price Hedging Report - FY22 (PDF 367KB) 1/1/2023
Annually
ESSB 5689 210 (2)
211
214 (7)
216 (11)
217 (3)
218 (2)
219 (8)
Contingency Funding to Address Staff Vacancies (PDF 320KB) 1/1/2023
ESSB 5689 222 (21) Study on cost-effective strategies to maximize walk-on passenger of the Anacortes/San Juan ferry routes 1/6/2023
ESSB 5689 216 (15) (d) Safety Rest Area Report - Additional Operations and Maintenance Activities (PDF 625KB) 1/15/2023
ESSB 5689 216 (16) (f) Safety Rest Area Anti-Human Trafficking Informational Poster Report (PDF 113KB) 1/15/2023
SHB 1655 2 (3) Implemented or Planned Changes to Safety Rest Area Operations (PDF 109KB) 1/15/2023
ESSB 5689 218 (4) Small Business Enterprise Set-Aside Report (PDF 125KB) 1/31/2023
ESSB 5689 308 (2) Semi-annual WSF Project Status Update 2/2/2023
Semi-Annually
ESSB 5689 220 (2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES - FY23 Quarters 1 & 2 (PDF 257KB) 2/15/23
Semi-Annually
ESSB 5689 311 Capital projects quarterly report - Quarter ending December 31, 2022 (PDF 1.03MB) 2/15/23
Quarterly
ESSB 5689 601 (1) (k) Administrative Transfers (PDF 253KB) 2/15/23
Quarterly
RCW 47.01.485 2 Report on any local permit application that takes longer than 90 days. (PDF 122KB) 3/1/2023
Annually
RCW 47.85.040 5 Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 275KB) 3/1/2023
Annually
ESSB 5689 309 (2) Freight Rail Investment Bank (FRIB) Progress Report (PDF 83.3KB) 3/17/23
ESSB 5689 216 (9) Public Health Associated with Homeless Encampments on Department Owned Rights of Way, May 2023 (PDF 955KB) 5/1/2023
ESSB 5689 311 Capital projects quarterly report 5/15/2023
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 5/15/2023
Quarterly
ESSB 5689 209 (3) (b) New Tolling Back Office System Report (PDF 519KB) 5/16/2023
ESSB 5689 707 State Commercial Aviation Coordinating Commission Final Report (PDF 616KB) 6/15/2023
SSB 5092 129 (99) Creates a new Aviation and Aerospace Advisory Committee supported by Dept. of Commerce. Includes WSDOT Secretary or designee as Aviation Director as admin. co-chair. A strategic plan must be developed for the Dept of Commerce's aerospace, aviation, and airport economic development program, with guidance from the Advisory committee. 6/30/2023
ESSB 5689 219 (3) Vehicle Miles Traveled Targets - Final Report (PDF 1.29MB) 6/30/2023
SSB 5975 209 (3) I-5 Master Plan - Interim Report (PDF 2.73MB) 6/30/2023
SSB 5975 209 (4) I-5 Near-Term and Longer-Term HOV Recommendations - Interim Report (PDF 2.35MB) 6/30/2023
ESSB 5689 219 (9) Performance Based Project Evaluation Model Report (PDF 1MB) 6/30/2023
ESSB 5689 221 (15) (a) Frequent Transit Service Study Final Report (PDF 628KB) 6/30/2023
ESSB 5689 222 (19) Mukilteo Multimodal Terminal Solar Power Generation Report 6/30/2023
ESSB 5689 223 (3) Ultra High-Speed Ground Transportation Report (PDF 775KB) 6/30/2023
SSB 5092 129 (99) Aviation and Aerospace Advisory Committee Strategic Plan 6/30/2023
SSB 5975 303 (5) US 2 Westbound Trestle Status Report (PDF 3.58MB) 6/30/2023
RCW 81.104.115 9 2022 Rail Fixed Guideway Public Transportation System Safety Report (PDF 6.81MB) 6/30/2023
(Annually)
ESSB 5689 219 (6) SR302 Victor Area Corridor Study (PDF 27.1MB) 6/30/2023
ESSB 5689 220 (2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES 8/15/2023
Semi-Annually
ESSB 5689 311 Capital projects quarterly report 8/15/23
Quarterly
SSB 5165 601 (1) (l) Administrative Transfers 8/15/23
Quarterly
SSB 5165 209 (2)

209 (5)

 
I-405 Express Toll Lane Project Performance Measure Reports

The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility
11/30/2023

Legislative reports for the 2019-2021 biennium

Orig Bill
No
Orig
Sect
Study Title/ Topic Report
Due Date
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 240KB) 7/1/2019
RCW 81.104.115 9 Rail Fixed Guideway Public Transportation System Safety Report (PDF 889KB) 8/21/2019
ESHB 1160 601 Transfers (PDF 98.1KB) 9/19/2019
ESHB 1160 306 (22) Connecting WA Project Advancement (PDF 176KB) 9/24/2019
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 108KB) 11/15/19
Quarterly
ESHB 1160 313 Capital projects quarterly report (PDF 894KB) 11/15/19
Quarterly
ESHB 1160 606 Amounts expended for transit, bicycle, pedestrian elements (PDF 149KB) 11/15/19
Annually
ESHB 1160 601(1)(h) Administrative Transfers (PDF 64KB) 11/15/19
Quarterly
ESHB 1160 601 Transfers (PDF 99KB) 11/18/19
ESHB 1160 218(2) SR 518 - SR 509 to I-5 Corridor Planning Study 11/30/2019
RCW 47.01.435 ESHB 1160 6 217 (1) Highway Construction Workforce Development Report Apprenticeship Program Grant Awards (PDF 809KB) 12/1/2019
Annually
RCW 47.66.030
RCW 47.01.330
RCW 47.66.100
ESHB 1160
RCW 47.06.110
RCW 47.66.030
RCW 70.94.537
ESHB 1160
RCW 70.94.551
3

3
220(5)

1 (a)
6
220(7)(a)
6
Public Transportation Mobility Report (PDF 5.05MB)
Regional mobility grants (PDF 5.05MB)
Office of Transit Mobility Report Rural mobility grants (PDF 5.05MB)
Regional Mobility Grant Projects (PDF 5.05MB)
Report summarizing the Public Transportation Plan progress (PDF 5.05MB)
Regional mobility grants prioritized list (PDF 5.05MB)
CTR Board Report (PDF 5.05MB)
Pilot transit pass incentive program update (PDF 5.05MB)
State Agency CTR Report (PDF 5.05MB)
12/1/2019
Annually
RCW 35.58.2796 RCW 47.66.110 2 (a) 6 Transit Integration Report Report on the transit coordination grants that were awarded. (PDF 2.80MB) 12/1/2019
Annually
ESHB 1160 214(2) Kingsgate Transit Oriented Development Report (PDF 524KB)

May 2021 Report Addendum (PDF 44KB)
12/1/2019

5/20/2021
ESHB 1160 306(24)
(e)(iii)
Progress report on activities related to the replacement of the I-5 Columbia River Bridge. 12/1/2019
ESHB 1160 311(3) Project status report for Pedestrian Safety/Safe Routes to school grant program. (PDF 833KB) 12/1/2019
RCW 35.58.2796 1 2018 Washington State Summary of Public Transportation 12/1/2019
Annually
E2SHB 2042 18 (1) (a) Green Transportation Capital Grant Program prioritized project list. (PDF 91KB) 12/1/2019
Annually in even-numbered years
ESHB 1160 216(1) Report on all low-cost enhancements completed in the prior biennium. (PDF 825KB) 12/15/2019 and every odd number year
ESHB 1160 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports (pdf 507 kb) Washington state patrol enforcement hours of toll violations (PDF 421KB) 12/15/19
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 1.15MB)
12/15/19
Quarterly
ESHB 1160 210(1) Labor Systems Replacement report on timeline. (PDF 593KB) 12/31/2019
RCW 47.64.360 2 FY 2019 WSF Performance Measures Report (PDF 589KB) 12/31/2019 Annually
ESHB 1160 221(7) WSF Overtime Analysis Report (PDF 2.44MB) 1/1/2020
ESHB 1160 310(11) Freight Rail Investment Bank (FRIB) and Freight Rail Assistance Projects (FRAP) funded projects update (PDF 95KB) 1/1/2020
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 224KB) 1/1/2020
RCW 47.60.830   Annual Diesel Fuel Price Hedging Report (PDF 729KB) 1/1/2020
Annually
RCW 70.95.807   Recycled Concrete Usage in Aggregate Materials (PDF 206KB) 1/2/2020
Annually
ESHB 1160 601 Transfers (PDF 54.3KB) 2/12/2020
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 109KB) 2/15/2020
Quarterly
ESHB 1160 313 Capital projects quarterly report (PDF 780KB) 2/15/2020
Quarterly
ESHB 1160 601(1)(h) Administrative Adjustments (PDF 49.2KB) 2/15/2020
Quarterly
RCW 47.01.485 2 Report on any local permit application that takes longer than 90 days (PDF 441KB) 3/1/2020
Annually
RCW 47.85.040 5 Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 486KB) 3/1/2020
Annually
ESHB 1160 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports (pdf 507 kb) Washington state patrol enforcement hours of toll violations (PDF 448KB) 3/15/2020
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 448KB)
3/15/2020
Quarterly
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 112KB) 5/15/20
Quarterly
ESHB 2322 601 Transfers (PDF 50.1KB) 5/13/20
ESHB 2322 311 Capital projects quarterly report (PDF 895KB) 5/15/20
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 74.9KB) 5/15/20
Quarterly
ESHB 1160 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports (PDF 507KB) Washington state patrol enforcement hours of toll violations (PDF 454KB) 6/15/20
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 473KB)
6/15/20
Quarterly
RCW 81.104.115 9 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1.30MB) 6/30/2020
Annually
ESHB 1160 309(6) WSF Electrification Plan - Report (PDF 4.2MB)
WSF Electrification Plan - Appendices (PDF 5.79MB)
6/30/2020
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 229MB) 7/1/2020
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 121KB) 8/15/20
Quarterly
ESHB 2322 311 Capital projects quarterly report (PDF 1.01MB) 8/15/20
Quarterly
ESHB 2322 601 Transfers (PDF 49.7KB) 8/15/20
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 59.5KB) 8/15/20
Quarterly
ESHB 2322 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations (PDF 516KB) 9/15/20
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 489KB)
9/15/20
Quarterly
RCW 47.01.495 4 Construction Program Business Plan (PDF 1.8MB) 9/30/20
Biennially
RCW 47.04.285   Attainment Report (PDF 1.79MB) 10/1/2020
ESHB 1160 213(4)(b) Surplus Property report (PDF 246KB) 10/1/2020
ESHB 2322 305(25)(b) Statewide Culvert Remediation Plan Update (PDF 1.22MB) 11/1/2020
ESHB 2322 212(3)(c) Electric Aircraft Feasibility Study (PDF 6.55MB) 11/15/2020
ESHB 2322 309 (2) 309 (6) Freight Rail Investment Bank (FRIB) and Freight Rail Assistance Program (FRAP) Project Lists (PDF 157KB) 11/15/2020
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 113KB) 11/15/20
Quarterly
ESHB 2322 311 Capital projects quarterly report (PDF 302KB) 11/15/20
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 48.4KB) 11/15/20
Quarterly
ESHB 2322 601 Transfers (PDF 77.7KB) 11/15/20
Quarterly
ESHB 2322 602 Amounts expended for transit, bicycle, pedestrian elements (PDF 133KB) 11/15/20
Annually
ESHB 2322 310(8)(b) Stakeholder Recommendations for a Washington State Freight Advisory Committee (PDF 484KB) 12/1/2020
ESHB 2322 220(17) 305(36) 308(12) 309(18) 310(27) Allotment Modification report (PDF 33.2KB) 12/1/2020
ESHB 2322 209(9) Report on Cost Allocation and Changes or Potential Impacts to Toll Rates (PDF 347KB) 12/1/2020
ESSB 6168 137 Surety Bonding Accessibility Study (PDF 785KB) 12/1/2020
ESHB 1160 311(3) Project status report for Pedestrian Safety/Safe Routes to school grant program (PDF 843 KB) 12/1/2020
ESHB 2322 222(1) Cascadia Ultra High-Speed Rail Study (PDF 8.47MB) 12/1/2020
ESHB 1160 306(24)
(e)(iii)
Interstate Bridge Replacement Program Progress Report (PDF 3.6MB) 12/1/2020
ESHB 1160 306(24)
(e)(ii)
Interstate Bridge Replacement Program Conceptual Financial Plan (PDF 2.7MB) 12/1/2020
ESHB 1160 215(8) Safety Rest Area Free Coffee Program Report (PDF 141KB) 12/1/2020
RCW 47.01.435 ESHB 1160 6 217 (1) Highway Construction Workforce Development Report Apprenticeship Program Grant Awards (PDF 431KB) 12/1/2020
Annually
RCW 47.66.100
RCW 47.66.030
RCW 47.66.120
RCW 47.06.110
RCW 47.01.330
RCW 47.06.110
RCW 47.66.120
ESHB 2322
3
3
4
6
5

4
220 (7) & (18)
2020 Public Transportation Mobility Report (PDF 8.39MB)
Rural Mobility Grant Program Regional mobility grants (PDF 8.39MB)
Green Transportation Capital Grant Program (PDF 8.39MB)
Public Transportation Plan Office of Transit Mobility (PDF 8.39MB)
Report summarizing the Public Transportation Plan progress (PDF 8.39MB)
Green Transportation Capital Grant Program project status update (PDF 8.39MB)
12/1/2020
Annually
RCW 35.58.2796 RCW 47.66.110 2 (a) 6 Transit Integration Report Report on the transit coordination grants that were awarded (PDF 1.43MB) 12/1/2020
Annually
RCW 35.58.2796 1 2019 Summary of Public Transportation (PDF 35.5MB) 12/1/2020
Annually
RCW 47.66.120 1 (a) Green Transportation Capital Grant Program prioritized project list (PDF 145KB) 12/1/20
Annually in even-numbered years
RCW 47.66.030 1 (a) 2021-2023 Regional Mobility Grant Program Prioritized List (PDF 239KB) 12/1/2020
Annually
ESHB 2322 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports (PDF 507KB) Washington state patrol enforcement hours of toll violations (PDF 507KB) 12/15/20
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 449KB)
12/15/20
Quarterly
ESHB 1160 709 (3) SR 167 HOT lane pilot (PDF 3.81MB)
(within annual report)
12/31/20
(Annually)
ESHB 2322 218(7) Performance-Based Project Evaluation Feasibility Report (PDF 925KB) 12/31/2020
RCW 47.64.360 2 WSF FY2020 Performance Measures Report (PDF 644KB) 12/31/2020 Annually
RCW 47.01.435 7 Pre-Apprentice Support Services (PASS) Program Summary Report 2015-2020 (PDF 964KB) 12/31/2020
SSB 5370   Commercial Aviation Coordinating Commission Report (PDF 204KB) 1/1/2021
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 224KB) 1/1/2021
RCW 47.60.830   Annual Diesel Fuel Price Hedging Report (PDF 609KB) 1/1/2021
Annually
RCW 70A.205.705   Recycled Concrete Usage in Aggregate Materials (PDF 744KB) 1/2/2021
Annually
ESHB 1160 221(9) Triangle Route Service Plan 1/15/2021
ESHB 1160 217(3) Studded Tire Damage Campaign Report (PDF 415KB) 1/14/2021
ESHB 1160 215(1)(b) Report on the amount of funds requested, the funds granted, and the strategies used to keep utility fee costs down. 1/17/2021
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 110KB) 2/15/21
Quarterly
ESHB 2322 311 Capital projects quarterly report 2/15/21
Quarterly
ESHB 2322 601 Transfers (PDF 48.4KB) 2/15/21
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 21.1KB) 2/15/21
Quarterly
RCW 47.01.485 2 Report on any local permit application that takes longer than 90 days (PDF 128KB) 3/1/2021
Annually
RCW 47.85.040 5 Report summarizing violations of environmental permits and regulations occurring during the preceding year. (PDF 214KB) 3/1/2021
Annually
RCW 47.66.080   Grant Program Examination 3/15/2021
ESHB 2322 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports (pdf 526 kb) Washington state patrol enforcement hours of toll violations (PDF 526KB) 3/15/21
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 517KB)
3/15/21
Quarterly
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 120KB) 5/15/21
Quarterly
ESHB 2322 311 Capital projects quarterly report (PDF 1.31MB) 5/15/21
Quarterly
ESHB 2322 601 Transfers (PDF 49.5KB) 5/15/21
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 46.3KB) 5/15/21
Quarterly
ESHB 2322 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations
(PDF 569KB)
6/15/21
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 498KB)
6/15/21
Quarterly
RCW 81.104.115 9 Rail Fixed Guideway Public Transportation System Safety Report (PDF 1MB) 6/30/2021
(Annually)
ESHB 2322 214(6) Pierce County TOD Opportunities Report (PDF 163KB) 6/30/2021
RCW 47.01.480 2 (b) Practical Designs Savings Report (PDF 229KB) 7/1/2021
ESHB 1160 219(2) & (3) Claims/Settlements, Defense Costs, and Moving Costs for WA State Ferries and non-Ferries cases to Self Insurance pool at DES (PDF 240KB) 8/15/21
Quarterly
ESHB 2322 311 Capital projects quarterly report 8/15/21
Quarterly
ESHB 2322 601(1)(h) Administrative Adjustments (PDF 79.4KB) 8/15/21
Quarterly
ESHB 2322 601 Transfers (PDF 376KB) 9/9/21
ESHB 2322 209(2) 209(8) I-405 Express Toll Lane Project Performance Measure Reports Washington state patrol enforcement hours of toll violations
(PDF 550KB)
9/15/21
Quarterly
ESHB 1160 209(4) The Use of Consultants
Non-Vendor Costs
Vendor-Related Costs
Toll Adjudication Process
Summary of Toll Revenue by facility (PDF 512KB)
9/15/21
Quarterly

Slow down – lives are on the line. 

In 2023, speeding continued to be a top reason for work zone crashes.

Even one life lost is too many.

Fatal work zone crashes doubled in 2023 - Washington had 10 fatal work zone crashes on state roads.

It's in EVERYONE’S best interest.

95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.