Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
153 results
SR 904, I-90 To Cheney Paving
Publication date:
Contract number: XE3722
Submittal due:
Removing asphalt concrete pavement, concrete barrier and hot mix asphalt (HMA) patches, shoulder finishing, pavement repair excavation including haul, asphalt for fog seal, crack sealing, planing bituminous pavement, HMA for pavement repair, HMA paving, joint adhesive for bituminous paving, ESC…
SR 525, 525 Spur Vic to Mukilteo Ferry Vic Paving & ADA
Publication date:
Contract number: XE3723
Submittal due:
Requires planning bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, traffic signal and ITS work, pavement markings, ADA curb ramps, temporary erosion control, temporary traffic control and other work. Involves 99 items and 95 working days. Work class 4, asphalt concrete paving.…
2026 Washington State Aviation Economic Impact Study Update
Publication date:
Submittal due:
The Washington State Aviation Economic Impact Study Update (WAEIS) is a comprehensive, 24-month initiative led by the WSDOT Aviation Division to quantify and communicate the full economic and societal value of Washington’s public-use airport system. The study will evaluate direct, indirect, and…
SR 534, I-5 Interchange to SR 9 Vic Paving
Publication date:
Contract number: XE3713
Submittal due:
Requires hot mix asphalt (HMA) paving and planing, pavement repair, pavement markings, temporary erosion and sediment control, traffic control and other work. Involves 36 items and 51 working days. Work class 4, asphalt concrete paving
US 2, Cashmere West - Paving
Publication date:
Contract number: XE3715
Submittal due:
Requires pavement repair excavation including haul, expansion joint modification comp. seal and header, bridge deck repair, waterproof membrane, planing bituminous pavement, hot mix asphalt (HMA) for
pavement repair CL. 1/2 IN. PG 64V-28, HMA CL. 1/2 IN. PG 64V-28, traffic signal system #1-…
pavement repair CL. 1/2 IN. PG 64V-28, HMA CL. 1/2 IN. PG 64V-28, traffic signal system #1-…
SR 211, JCT US 2 to JCT SR 20 Paving
Publication date:
Contract number: XE3717
Submittal due:
Requires planing bituminous pavement, crack sealing, joint adhesive, hot mix asphalt (HMA) paving, pavement repair, erosion control, centerline rumblestrips, pavement markings, guide posts, guardrail, signing, traffic control and other work. 40 working days, 52 items. Work class 4, asphalt concrete…
I-90 et al., SR-202 SR-203 & SR-900 Adaptive Management
Publication date:
Contract number: XE3716
Submittal due:
Requires: install streambed material, boulders, aquitards, large woody material, slash, temporary erosion and sediment control, traffic control, temporary stream diversions, and roadside restoration, traffic control and other work. Involves 40 items and 85 working days. Work class 1,
I-5, N of Old Hwy 99 SW to N of Maytown Rd SW Paving
Publication date:
Contract number: XE3714
Submittal due:
Requires planing bituminous pavement, pavement repair, inlay with hot mix asphalt (HMA), installing pavement markings, installing guardrail, installing permanent signing, traffic control and other work. Involves 45 items and 91 working days. Work class 4, asphalt concrete paving.
SR509 Miller Creek Fish Passage
Publication date:
Contract number: XE3718
Submittal due:
This Project will remove (2) fish barrier culverts and (7) weirs. These existing fish barriers will be replaced with a fish-passable structure and a new stream alignment under SR 509/Des Moines Memorial Drive. Work will include, but is not limited to, fish exclusion and temporary stream bypass…
I-5, Koontz Rd to S of Alder St. w Exceptions
Publication date:
Contract number: XE3709
Submittal due:
This project will preserve the existing pavement Northbound and Southbound I-5 Mile Post 69.40 to 71.65 NB & SB and 79.64 to 80.75 by planing 0.15 ft. of existing asphalt pavement and replacing with 0.15 ft. hot mix asphalt (HMA) Class 3/8-inch PG 58V-22. This will include all through lanes and…
SR 25 & SR 231, 2026 Eastern Region Chip Seal
Publication date:
Contract number: XE3710
Submittal due:
Requires constructing bituminous surface treatment (BST), crack sealing, hot mix asphalt (HMA) for pavement repair, prelevel, wearing course, fog seal, pavement markings, traffic control and other work. Involves 71 items and 50 working days. Work class 3, bituminous surface treatment, or work class…
SR 14, E of Slide Bridge Repair Crib Wall
Publication date:
Contract number: XE3708
Submittal due:
This project will protect and preserve the existing retaining wall by installing soil nails through the existing timbers and spray the wall surface with shotcrete and other work. Involves 27 items and 32 working days. Work class 36, earth retention and anchoring, and work class 46, concrete…
Emergency purchase – Northwest Region – SR99 Duwamish Bridge Deck
Publication date:
Contract number: T102306
Vendor: Mission Critical Solutions (MCS)
On February 18, 2026, the WSDOT Bridge Preservation Office (BPO) received notification from field inspectors at the Duwamish River Bridge (bridge 99/530E) that there were multiple structural deficiencies in the steel grid deck (roadway surface…
On February 18, 2026, the WSDOT Bridge Preservation Office (BPO) received notification from field inspectors at the Duwamish River Bridge (bridge 99/530E) that there were multiple structural deficiencies in the steel grid deck (roadway surface…
I-90, Sullivan to Idaho State Line ITS Improvements
Publication date:
Contract number: XE3707
Submittal due:
Installing guardrail, guide posts, barrier delineators, pavement markings, ITS System Variable Message Signs, including monotube cantilever structures, plastic curb system, luminaires, conduit, junction boxes, conductors, traffic control and other work. Involves 24 items. and 30 working days. Work…
Notice of bid opportunity - World Cup 2026 information assistance services
Publication date:
Submittal due:
The Washington State Department of Transportation (WSDOT) has been allocated a grant under the 2026 FIFA infrastructure Readiness Program to ensure WSDOT facilities and services are accessible for people with disabilities and people with limited English proficiency during the 2026 World Cup,…
SR 500, I-5 at 39th St Corridor Connection
Publication date:
Contract number: XE3706
Submittal due:
Improvement of the westbound SR 500 to northbound I-5 connection by constructing a right turn lane on E 39th St, traffic curb and sidewalk, an ADA curb ramp, pavement markings, pedestrian signals, an RRFB system, temporary traffic control and other work. Involves 58 items and 30 working days . Work…
Notice of bid opportunity- WSF Hybrid electric 160 auto ferries inspector training
Publication date:
Submittal due:
WSF is seeking a new vessel construction Inspector Training Program coordinator to deliver a comprehensive professional development initiative designed to ensure the highest standards of shipbuilding quality, regulatory compliance, and technical excellence are achieved in its new vessel…
I-90, EB Mercer Slough Bridge Rehab
Publication date:
Contract number: XE3704
Submittal due:
Requires replacing bearing seats, repairing expansion joint headers, replacing expansion joint seals, erosion control, relocating water main pipe support facilities, traffic control and other work. 68 working days. Work Class 6, bridges and structures.
US 101, N of Ocean Beach Rd to Jefferson Co Line Paving
Publication date:
Contract number: XE3705
Submittal due:
Requires performing pavement repair, bridge deck repair, waterproof membrane, removing overlay from bridge deck, planing bituminous pavement, hot mix asphalt (HMA), HMA joint seal at bridge end, flexible guide post, pavement marking, rumble strip, traffic control, adjust monument case and cover and…
SR 16 / Goodnough Creeks & McCormick Creeks - Remove Fish Barrier
Publication date:
Contract number: XL6541
Submittal due:
This project will remove eight (8) existing fish barriers from separate site locations along SR 16 between MP 14.63 to MP 16.59 and SR 302 at MP 16.15. The existing fish barriers will be replaced with new structures and reconstructed stream channels to provide unimpeded passage for fish of all life…
WSF/Systemwide Ferry Terminal VTS Mech / Elec Rehabilitation
Publication date:
Contract number: XE3703
Submittal due:
Requires: replacing headframes, liftbeams, counterweights, mechanical and electrical equipment that allow the transfer span to move though the tidal cycle for
loading vessels. The base bid work will occur at the following four ferry terminals: Anacortes in Skagit County, Coupeville in Island…
loading vessels. The base bid work will occur at the following four ferry terminals: Anacortes in Skagit County, Coupeville in Island…
SR 99, 1st Ave S Bridge Tower Mit & Watertight Door Rpl
Publication date:
Contract number: XE3702
Submittal due:
Requires replacing roofing of the towers, windows, watertight doors, access doors, stainless steel ladders, valves, and removing northwest control tower's top two floors on BR 99/530E in addition to replacing the roofing on the control tower of BR 99/530W, traffic control and other work.…
SR 112, E Fork Whiskey Creek - Remove Fish Barriers
Publication date:
Contract number: XE3719
Submittal due:
This project will remove twelve (12) existing fish barriers from separate site locations along SR 112 from MP 0.72 to MP 56.55. The existing fish barriers will be replaced with new structures and reconstructed stream channels to provide unimpeded passage for fish of all life stages. Work will…
I-90, EB Mercer Slough to 150th Ave SE Paving & Bridge Deck Resurface
Publication date:
Contract number: XE3701
Submittal due:
Requires planing bituminous pavement, pavement repair, hot mix asphalt (HMA) paving, bridge expansion joint modification, removing and replacing bridge deck waterproof membrane and HMA overlay, beam guardrail replacement, permanent impact attenuator replacement, pavement marking, temporary erosion…
SR 536, Skagit River Bridge Painting
Publication date:
Contract number: XE3700
Submittal due:
Perfoming of all preparation work including containment, prior to painting bridge 536/15. Painting will be completed with a WSDOT approved paint system as recommended by HQ Bridge and Structures office. 202 working days. Class 8, Painting.
I-90, H M Hadley Br & L V Murrow Br - Electrical Rehabilitation
Publication date:
Contract number: XE3693
Submittal due:
Requires Homer M. Hadley & Lacey V. Murrow Bridges-Electrical Rehabilitation by replacing the pontoon monitoring and control systems on the Homer M. Hadley Bridge (BR 90/25N) and the Lacey V. Murrow Bridge (BR 90/25S). Involves 20 items and 350 working days. Work class 6 - bridges and…
SR 203, Slough Br Vic to Kelly Rd NE Vic Stormwater Retrofit (Small Works Roster)
Publication date:
Contract number: XE3697
Submittal due:
Requires installing vegetated filter strips, guideposts, temporary and permanent erosion control, temporary traffic control and other work. 20 working days and 32 items. Class 1, clearing, grubbing, grading and draining and Class 2, production and placing of crushed materials.
Emergency Contract: FIFA 2026 Language Access and ADA Navigation System
Publication date:
Contract number: K1840
WSDOT has identified a need ensure WSDOT facilities and services are accessible for people with disabilities and people with limited English proficiency during the 2026 World Cup, scheduled to commence in June 2026.
I-90 / EB North Bend - Virtual Weigh In Motion
Publication date:
Contract number: XE3696
Submittal due:
Requires pavement grinding, installing a weigh in motion system, fog sealing, guardrail, delineation, temporary traffic control and other work. involves 23 items and 25 working days. Work class 41, Intelligent Transportation Systems (ITS).
SR 504, Spirit Lake Outlet Br Emergency Replacement
Publication date:
Contract number: XE3695
Submittal due:
Demolishing the existing bridge structures and approach slabs, constructing new bridge, hot mix asphalt (HMA) paving, replacing guardrail, installing pavement markings, traffic control and other work. Involves 68 items and 157 working days. Work class 6 Bridges and Structures.
Slow down on ice and snow.
It's easier to skid or lose control traveling at higher speeds. Give yourself more time to stop.
Carry chains, practice installing them.
Winter conditions could mean chains are required on your route. Practice putting them on your vehicle ahead of time.
Pack your winter car kit.
Carry extra supplies like warm clothing, ice scraper and brush, jumper cables and other emergency items.