SR 410, 288th Ave SE VIC to Crystal Mountain Blvd VIC BST

Publication date:
Contract number: 009768
Submittal due:
  • Public Works
  • Advertised
  • King County
  • Pierce County
Rehabilitating the existing roadway including pavement repair, crack seal, planing, bituminous surface treatment (BST), centerline rumble strips, and improvements of six bridges by bridge deck repair, removing existing overlay, waterproof membrane, expansion joint modification, hot mix asphalt (HMA…

SR 20, Skagit River Fish Passage

Publication date:
Contract number: 009769
Submittal due:
  • Public Works
  • Advertised
  • Skagit County
Installing two buried fish passage structures, grading, stream alignment, hot mix asphalt (HMA) paving, pavement marking, guardrails, temporary erosion control, planting, traffic control and
other work. Fifty-five working days. Involves one hundred twenty four items.

SR 17, Grape Dr Intersection Safety Improvement

Publication date:
Contract number: 009767
Submittal due:
  • Public Works
  • Advertised
  • Grant County
Roadway excavation, common borrow, quarry spalls, drainage, pigment cement concrete pavement, planing bituminous pavement, hot mix asphalt (HMA), seeding and mulching, topsoil, roundabout items, flexible guide post, paint and plastic markings, illumination system, traffic control and other work.…

SR 20, Olson Creek and Unnamed Tributary to Skagit River – Fish Passage

Publication date:
Contract number: 009764
Submittal due:
  • Public Works
  • Planned
  • Skagit County
This project will replace the existing fish barrier culvert crossings on SR 20 at Unnamed Tributary to Skagit River (milepost 94.82, Washington Department of Fish and Wildlife Site 991126) and SR 20 at Olson Creek (milepost 105.42, Washington Department of Fish and Wildlife Site CD18) with fish…

I-405, Brickyard to SR 527 Improvement Project

Publication date:
Contract number: 009727
  • Public Works
  • Planned
  • King County
  • Snohomish County
The proposed I-405, Brickyard to SR 527 Improvement Project will create a dual express toll lane (ETL) system from south of the I-405/SR 522 interchange to the I-405/SR 527 interchange. This project includes new lanes, direct access ramps, interchange improvements, Stride bus rapid transit stations…

2021 Disadvantaged Business Enterprise Program Disparity Study

Publication date:
Submittal due:
  • Consultant Services
  • Advertised
  • Statewide
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to conduct a Disadvantaged Business Enterprise (DBE) Program Disparity Study. One (1) agreement may be awarded. The agreement will be for approximately one (1) year…

US 395, Pasco - Flamingo Mobile Home Park Noise Walls

Publication date:
Contract number: 009760
Submittal due:
  • Public Works
  • Advertised
  • Franklin County
Constructing noise walls, drainage structures, erosion control, seeding and mulching, traffic control and other work. Fifty working days. Thirty-three items.

US 395, Immel Rd to Arden Paving

Publication date:
Contract number: 009765
Submittal due:
  • Public Works
  • Advertised
  • Stevens County
Planing bituminous pavement, pavement repair excavation, crack sealing, paving with hot mix asphalt (HMA), pavement repair, inlet protection, removing and resetting guardrail, erosion/water pollution control, pavement markings, traffic control and other work. Thirty working days. Involves forty…

SR 16/SR 302 Spur, Purdy Creek Remove Fish Barriers and Paving

Publication date:
Contract number: 009763
Submittal due:
  • Public Works
  • Advertised
  • Pierce County
For SR 16 Purdy Creek: Realigning the stream and replacing the existing 6-foot diameter corrugated metal pipe with a two 206-foot prestressed concrete girder bridges.

For SR 302 (Spur) Purdy Creek: Realigning the stream and replacing the existing 6-foot interior span…

I-90/I-5, E Sunset Way Vic & NB Lowell Rd Vic PCCP Exp Jnt Rehab & Deck Overlay

Publication date:
Contract number: 009762
Submittal due:
  • Public Works
  • Advertised
  • King County
  • Snohomish County
Concrete panel replacement, concrete panel spall repair, grinding cement concrete pavement, by replacing the existing concrete panels with hot mix asphalt (HMA) pavement, replacing the existing HMA/PCCP paving and membrane on bridge deck, replacing expansion joints and traffic…

I-5, Mounts Rd to Steilacoom-DuPont Rd – Corridor Improvements

Publication date:
Contract number: 009743
Submittal due:
  • Public Works
  • Planned
  • Pierce County
The project provides for the improvement of I-5, from milepost 116.55 to 120.94, Pierce County. I-5 will be widened to accommodate four thru-lanes in each direction. Auxiliary lanes will be added to both directions of I-5 between the Center Drive and Steilacoom-DuPont Road interchanges. The left…

SR 160, Southworth Ferry Terminal Painting Preservation

Publication date:
Contract number: 009761
Submittal due:
  • Ferries
  • Public Works
  • Awarded
  • Kitsap County
Cleaning and painting wingwalls, vehicle transfer span, headframe and towers and other work. Sixty working days. Involves ten items.

SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity

Publication date:
Contract number: 009758
Submittal due:
  • Public Works
  • Cancelled
  • Island County
Pavement and sidewalk repair, placing curbing, lighting, traffic control, storm water system, erosion control and other work. Twenty-five working days. Involves sixty-five items.

US 2, Davenport to Reardan Paving

Publication date:
Contract number: 009759
Submittal due:
  • Public Works
  • Pending Award
  • Lincoln County
Crack sealing, pavement repair, planing, hot mix asphalt (HMA) paving, joint adhesive, HMA sawcut and seal, centerline rumble strips, guidepost installation, pavement markings, striping, seeding, traffic control and other work. Forty working days. Involves forty items.

SR 17, SR 260 to Adams County Line - Paving

Publication date:
Contract number: 009756
Submittal due:
  • Public Works
  • Awarded
  • Franklin County
Roadway excavation, ditching and shaping, shoulder finishing, crack sealing, planning bituminous pavement, hot mix asphalt (HMA), cold in place recycle, HMA sawcut and seal, guardrail, flexible guidepost, pavement markings, centerline and shoulder rumble strips, traffic control and other work.…

I-405/SR 92, SR 520 VIC I-5 VIC & SR 9 Vic Paving & ADA Compliance

Publication date:
Contract number: 009755
Submittal due:
  • Public Works
  • Pending Award
  • King County
  • Snohomish County
Hot mix asphalt paving and planing, pavement and bridge deck repair, applying waterproof membrane, replacing expansion joints and traffic loops, pavement marking, curb ramp construction, traffic data accumulation and ramp metering System, temporary erosion control, traffic control and other work.…

SR 546, Pepin Creek and Duffner Ditch Fish Passage

Publication date:
Contract number: 009754
Submittal due:
  • Public Works
  • Pending Award
  • Whatcom County
Installing box culverts, grading, hot mix asphalt paving, pavement marking, guardrail installation, planting, erosion control, traffic control and other Work, Twenty-six working days. Involves Seventy-three items.

I-90, SR 161, SR 202 & SR 203 – Fish Passage

Publication date:
Contract number: 009750
Submittal due:
  • Public Works
  • Planned
  • King County
This project is to remove nine existing fish barriers and replace them with fish-passable crossings at I-90 Sunset and Lewis Creeks, SR 161 Unnamed Tributaries to Hylebos Creek and SR 202/SR 203 Tributaries to Snoqualmie River. The project shall include, but is not limited to, the following:…

US 2 et al, NCR Bridge Patching 21-23

Publication date:
Contract number: 009753
Submittal due:
  • Public Works
  • Awarded
  • Adams County
  • Chelan County
  • Douglas County
  • Grant County
  • Okanogan County
Containment system, bridge deck repair, forms for full depth deck repair, erosion control and water pollution prevention, traffic control and other work. Ninety-six working days. Involves twenty-five items.

I-405, Northeast 85th Street Interchange and Inline BRT Station Project

Publication date:
Contract number: 009732
  • Public Works
  • Planned
  • King County
The proposed I-405, Northeast 85th Street Interchange and Inline Station Project (Project) is located within the City of Kirkland along Interstate 405 (I-405) between milepost (MP) 17.4 to MP 18.9. The Project proposes to replace the existing two-level cloverleaf interchange at NE 85th Street with…

I-90, Dodson Rd to Adams County Line- Paving

Publication date:
Contract number: 9752
Submittal due:
  • Public Works
  • Awarded
  • Grant County
MP 164.15 to MP 175.62 and MP 181.77 to MP 191.89. Pavement and bridge deck repair, modify bridge drain and expansion joint, shoulder finishing, fog seal, crack sealing, planing bituminous pavement, removing existing bridge deck overlay, hot mix asphalt (HMA), planing shoulder drainage cutout,…

WSDOT Automatic Identification System (AIS) Vessel Tracking System

Publication date:
Submittal due:
  • Administration & Information Technology
  • Ferries
  • Advertised
  • King County
The current WSF Vessel Tracking solution provides Automatic Identification System (AIS) data that feeds Globe/FleetWatch software is currently dependent on a dated technology solutions that has reached end of life, putting WSF at a very high risk of application(s) failure. These systems are relied…

I-5, SB Samish River Bridge Deck Overlay

Publication date:
Contract number: 009751
Submittal due:
  • Public Works
  • Awarded
  • Skagit County
MP 234.04 to MP 234.08. Roadway excavation, structure excavation and shoring, drainage systems, detention vault, paving with HMA, pavement markings, roadside restoration, illumination, permanent signing, temporary erosion control, traffic control and other work. Forty-one working days. Involves 124…

SR 14, 0.7 to 0.2 Miles W of Chamberlain Lake Rest Area Unstable Slope

Publication date:
Contract number: 009745
Submittal due:
  • Public Works
  • Awarded
  • Klickitat County
Scaling loose rocks, installing rock dowels and two rock fall catchment ditches, traffic control and other work. Fifty working days. Involves thirty-six items.

SR 9, Bickford Ave Intersection Improvement

Publication date:
Contract number: 009742
Submittal due:
  • Public Works
  • Awarded
  • Snohomish County
Roadway excavation, and structure excavation and shoring, drainage systems, detention vault, paving with hot mix asphalt (HMA), pavement markings, roadside restoration, illumination, permanent signing, temporary erosion control, traffic control and other work. Forty-one working days. Involves 124…

SR 525, Mukilteo Pedestrian and Traffic Improvements

Publication date:
Contract number: 9741
Submittal due:
  • Public Works
  • Pending Award
  • Snohomish County
Planning bituminous pavement, paving with hot mix asphalt (HMA), construction of sidewalk with curb ramps, retaining wall and stairway, removing existing overlay from bridge deck, replacing existing joints, applying waterproof membrane, pavement marking, temporary erosion and water pollution…

PCC Rail, 2021 CW Branch Fencing - PCC

Publication date:
Contract number: 009740
Submittal due:
  • Public Works
  • Awarded
  • Lincoln County
Removing existing wire fence, installing new wire fence and gates, fence surveying and other work. Forty-two working days. Involves eight items.

US 97A/SR 971, Rock Slope Scaling

Publication date:
Contract number: 009739
Submittal due:
  • Public Works
  • Awarded
  • Chelan County
Rock slope scaling and debris removal, mechanical scaling, shoulder finishing, protective sand blanket, planing and paving existing rumble strip, hot mix asphalt, precast concrete barrier, temporary barrier, paint line, traffic control and other work. Fifty working days. Involves thirty-seven items.

SR 544, Unnamed Tributary to Fourmile Creek Fish Passage

Publication date:
Contract number: 009738
Submittal due:
  • Public Works
  • Awarded
  • Whatcom County
Earthwork, culvert removal and installation, hot mix asphalt (HMA) paving, pavement marking, guardrail, roadside restoration, temporary erosion control, traffic control and other work. Forty working days. Involves seventy-five items.

SR 305, Bainbridge Ferry Terminal OHL Walkway Replacement & Cab

Publication date:
Contract number: 009737
Submittal due:
  • Public Works
  • Pending Award
  • Kitsap County
Improvement of the fixed overhead loading pedestrian walkway and the moveable overhead loading cab, traffic control and other work. Four hundred working days. Involves eighty-six items.

Traffic fatality crashes on Washington public roadways

increased 56% in March 2021 compared to March 2020.

11,906 incidents responded to

by WSDOT’s incident Response teams during the third quarter of 2021, nearly 6% more than same quarter in 2020.

WSF ridership was nearly 5.7 million in the first quarter of fiscal year 2022,

which was 1.6 million (38.3%) higher than the corresponding quarter in FY2021