Contract summary
This project will remove twelve (12) existing fish barriers from separate site locations along SR 112 from MP 0.72 to MP 56.55. The existing fish barriers will be replaced with new structures and reconstructed stream channels to provide unimpeded passage for fish of all life stages. Work will include, but is not limited to, fish exclusion and temporary stream bypass systems, maintenance of traffic utilizing temporary traffic bypasses, removal of the existing fish barriers, earthwork above and below ordinary high water, structure and wall construction, roadway reconstruction, guardrail removal and installation, channel reconstruction, streambed restoration, roadside restoration, erosion control, water management and traffic control. The project will realign SR 112 in the vicinity of Indian Creek at MP 29.12.
Project information available
SOQ fact sheet (PDF 1.37MB) - updated 5/5/2026