The winter of 2021 brought a significant amount of snowfall to the northwest region and as a result, the potholes created are widespread and need immediate attention. Governor Jay Inslee signed an Emergency Proclamation Jan. 8, 2022 to fund these repairs.
Potholes can start in cold temperatures when groundwater freezes and expands. Once the ground thaws, it returns to a normal level, but the pavement pushed up during the ground freeze remains raised. This causes a gap between the pavement and the ground. Vehicles traveling over these gaps cause the road surface to crack and fall into that hollow space.
King County
Asphalt pavement repairs
- I-90 – Issaquah, just west of 17th Avenue NW to North Bend, west of 436th Avenue SE (mileposts 15.59 - 31.66).
- Highlands Drive Northeast on-ramp to westbound I-90
- East Sunset Way to eastbound I-90 ramp
- Southbound 17th Avenue Northwest to westbound I-90 ramp
- Front Street North to eastbound I-90 ramp
- I-405 – Kirkland, at NE 85th Street to Bothell just north of 228th Street SE (mileposts 18.1 - 26.39)
- SR 18 – Issaquah, just north of Issaquah-Hobart Road SE to just south of the West Tiger Mountain parking lot (mileposts 21.81 to 23.27)
- SR 169 – Enumclaw, just south of Enumclaw Franklin Road SE to Maple Valley just north of SE 231st Street (mileposts 3.49 to 14.25)
- SR 202 – Fall City, just south of SE Fish Hatchery Road to just north of Snoqualmie Falls (mileposts 22.68 to 25.66)
- SR 516 – Covington, just east of 186th Avenue SE to Maple Valley just east of SE 271st Place (mileposts 12.7 to 15.79)
- SR 900 – Seattle/Tukwila, just south of the S Boeing Access Road to Renton just east of Duvall Avenue NE (mileposts 6.58 to 14.4)
Bridge deck repairs
- I-90 – North Bend, at Riverbend, between exits 31 and 32
- I-405 – Kirkland, NE 116th Street overpass
- SR 900 – Tukwila, on the eastbound I-5 overpass
Snohomish
Asphalt pavement repairs
- SR 2 – Gold Bar, just west of 415th Avenue SE (mileposts 29.3 to 29.4)
- SR 524 – Edmonds, just west of 80th Avenue W to just west of 68th Avenue W (mileposts 2.32 to 3.1)
- SR 530 – Arlington, just east of Whitman Road to just west of Ash Road (mileposts 35.01 to 44.68)
Bridge deck repair
- I-405 – Kirkland, NE 85th Street, on the northbound I-405 overpass
- I-405 – Kirkland, just south of NE 124th Street, on the southbound I-405 overpass
- I-405 – Bothell, 228th Street SE, on the southbound I-405 overpass
Skagit
Asphalt pavement repairs
- I-5 – Burlington, just south of the SR 11 interchange (milepost 231.2)
- SR 20 – Sedro-Woolley, just east of Helmick Road (mileposts 67.93 to 80.38)
- SR 538 – Mount Vernon, just east of Urban Avenue to just east of Leigh Way (mileposts 0.5 to 0.6)
Whatcom
Asphalt pavement repairs
- SR 9 – Acme, just south of Saxon Road to just south of the SR 542 interchange (mileposts 69.75 to 79.2)
- SR 542 – Deming, south of Markel Road (mileposts 19.61 to 25.73)
Construction began in summer 2022 and was completed the following summer of 2023.
Milestone
Summer 2022
Construction begins
Summer 2023
Construction complete
$7 million has been allocated for this project.
Financial Data for PIN 100022G, 109058E, 140545B |
Funding Source |
Amount ($ in thousands) |
2003 Gas Tax (Nickel Funding) |
$0 |
2005 Gas Tax (TPA) |
$0 |
Pre-Existing Funds (PEF) |
$0 |
CWA |
$8,912 |
Total |
$8,912 |
|