Contract summary
Requires crack sealing, planing bituminous pavement, HMA paving, erosion control, seeding, fertilizing, and mulching, guardrail, guideposts, pavement markings, rumble strips, signing, traffic control, surveying, other work. Involves 49 items and 30 working days. Work class 4.