Bid opening results

Find results for recent highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business use.

Disclaimer: preliminary bid results are provided as a convenience to contractors for informational purposes, but should be used for reference only as bids are manually reviewed for mathematical accuracy.

If a change has been made to a contractors bid amount or bid position after review, it will be marked with two asterisks.**

  • Preliminary bid total results: (the numbers read publicly directly from submitted bids during bid opening) are posted immediately after the close of bid opening.
  • Verified bid total results: mathematically corrected bid numbers along with subcontractors named and Disadvantaged Business Enterprise, Small Business Enterprise and Veteran-Owned Business information.

9/11/2024 bid opening - Olympia, WA

Item no. 1: I-82, Columbia River Br at Umatilla EB - Bridge Painting Stg 1 & Repairs

Contract number: XE3548
Engineer's estimate: $15,743,983.00
Number of addenda: 6
Number of bidders: 13/5
Award status: pending

Preliminary bid total results

Apparent low: Allied Painting, Inc. - $15,651,307.00   
Apparent second: Vimas Painting Company, Inc. - $17,685,286.00
Apparent third: Southern Road & Bridge, LLC - $18,993,379.00

Verified bid total results

Low bidder: Allied Painting, Inc.
Bid amount: $15,651,307.00

Subcontractor named

  1. Combined Construction
    Description of work: replace vacant/damaged rivet with HS bolt

Disadvantaged business enterprise (DBE) 

  1. Caliber Traffic Solutions, LLC - sub - $1,353,975.00
    Description of work: traffic control
  2. Northern Resources - sub - $852,321.00
    Description of work: hazardous waste & health

DBE goal: $2,504,209.12
DBE total: $2,206,296.00
Note: by checking Box 5 the bidder is stating that their attempts to solicit sufficient DBE participation to meet the condition of award contract goal has been unsuccessful and a good faith effort will be submitted in accordance with Section 1-02.9 of the contract.  

Second bidder: Vimas Painting Company, Inc.
Bid amount: $17,685,286.00

Subcontractor named

  1. Combined Construction
    Description of work: replace vacant/damaged rivet with HS bolt

Disadvantaged business enterprise (DBE) 

  1. Steel City Contractors, Inc. - sub - $2,000,000.00
    Description of work: containment of abrasives partial and cleaning & painting partial
  2. M2 Industrial, Inc. - sub - $554,620.00
    Description of work: guardrail items, temporary barrier items, barrier glare screen, and temporary impact attenuator
  3. Pacific Northwest Traffic Control LLC - sub - $300,000.00
    Description of work: traffic control partial, operation of queue warning system, radar speed display sign & construction signs

DBE goal: $2,829,645.76
DBE total: $2,854,620.00

Third bidder: Southern Road & Bridge, LLC
Bid amount: $18,993,379.00

Subcontractor named

  1. None proposed
    Description of work: none proposed

Disadvantaged business enterprise (DBE) 

  1. M2 Industrial, Inc. - sub - $538,140.00
    Description of work: supply and install guardrail, barriers, and attenuators
  2. Steel City Contractors, LLC - sub - $2,130,000.00
    Description of work: cleaning & painting bridge, containment
  3. Sunset Company LLC - sub - $408,000.00
    Description of work: bridge repairs and rivets

DBE goal: $3,038,940.64
DBE total: $3,076,140.00

 

9/5/2024 bid opening - Olympia, WA

Item no. 1: SR 516 to S 200th Street Paving & ADA Compliance

Contract number: XE3553
Engineer's estimate: $7,574,199.26
Number of addenda: 2
Number of bidders: 5/4
Award status: awarded 9/18/2024

Preliminary bid total results

Apparent low: Tucci & Sons, LLC -   $8,219,928.76
Apparent second: Lakeside Industries, Inc. - $8,227,854.76
Apparent third: Miles Resources, LLC - $8,969,141.66

Verified bid total results

Low bidder: Tucci & Sons, LLC
Bid amount: $8,219,928.76

Subcontractor named

  1. G&G Inc.
    Description of work: electrical
  2. G&G Inc.
    Description of work: rebar

Disadvantaged business enterprise (DBE) 

  1. G&G Inc. - sub - $891,000.00
    Description of work: electrical
  2. Highmark Concrete Contractors LLC - sub - $573,700.00
    Description of work: concrete
  3. O'Bunco Engineering Intl. - sub - $39,220.00
    Description of work: survey
  4. Carli Trucking by Looker LLC - sub - $70,000.00
    Description of work: trucking

DBE goal: $1,561,786.46
DBE total: $1,573,920.00

Second bidder: Lakeside Industries, Inc.
Bid amount: $8,227,854.76

Subcontractor named

  1. G&G Inc.
    Description of work: rebar, electrical

Disadvantaged business enterprise (DBE) 

  1. G&G Inc. - sub - $907,000 .00
    Description of work: electrical & permanent signing
  2. O'Bunco Engineering  - sub - $39,000.00
    Description of work: surveying
  3. J & G Concrete  - sub - $405,000.00
    Description of work: concrete
  4. A&H Roadwurx - sub - $215,000.00
    Description of work: planing

DBE goal: $1,563,292.40
DBE total: $1,566,000.00

Third bidder: Miles Resources, LLC
Bid amount: $8,969,141.66

Subcontractor named

  1. G&G Corporation dba G&G Inc.
    Description of work: rebar installation
  2. G&G Corporation dba G&G Inc.
    Description of work: electrical

Disadvantaged business enterprise (DBE) 

  1. G&G Corporation dba G&G Inc. - sub - $891,000.00
    Description of work: electrical
  2. W.E. Coates Surveying, LLC - sub - $118,750.00
    Description of work: surveying
  3. A&H Roadwurx, Inc. - sub - $195,720.00
    Description of work: asphalt milling
  4. Highmark Concrete Contractors, LLC - sub - $485,737.25
    Description of work: concrete
  5. The Bag Lady, LLC - sub - $23,965.00
    Description of work: catch basin inserts

DBE goal: $1,704,136.92
DBE total: $1,715,172.25

Item no. 2: I-90, Schrag WB - Well Nitrate Remediation - ER

Contract number: XE3563
Engineer's estimate: $1,072,540.00
Number of addenda: 0
Number of bidders: 5/4
Award status: awarded 9/13/2024

Preliminary bid total results

Apparent low: Granite Construction Company - $1,688,353.00
Apparent second: Halme Construction Inc. - $1,717,000.00
Apparent third: Titan Earthwork, LLC - $1,949,494.00

Verified bid total results

Low bidder: Granite Construction Company
Bid amount: $1,688,353.00

Subcontractor named

  1. Colvico, Inc.
    Description of work: electrical
  2. Apollo Mechanical Contractors
    Description of work: HVAC and plumbing

Second bidder: Halme Construction Inc.
Bid amount: $1,717,000.00

Subcontractor named

  1. Halme Construction Inc.
    Description of work: structural steel installation, rebar installation, HVAC, plumbing
  2. Colvico, Inc.
    Description of work: electrical

Third bidder: Titan Earthwork, LLC
Bid amount: $1,949,494.00

Subcontractor named

  1. Titan Earthwork, LLC
    Description of work: electrical
  2. Schinn Mechanical
    Description of work: HVAC
  3. Schinn Mechanical
    Description of work: plumbing
  4. Titan Earthwork, LLC
    Description of work: structural steel installation
  5. Titan Earthwork, LLC
    Description of work: rebar installation

Find results for past highway, ferry terminal and facility bids including preliminary bid results, verified bid results, subcontractor information and business utilization commitments. This archive contains all records from the past year.

166,800 electric vehicle

registrations in Washington in 2023, up from 114,600 in 2022.

87 wetland compensation sites

actively monitored on 918 acres in 2023.

25,000 safe animal crossings

in the Snoqualmie Pass East Project area since 2014.