Skip Top Navigation

Plans Preparation Manual

Description: This manual provides instructions and guidance for the preparation of right of way plans, contract plans, special provisions, and estimate packages for highway construction projects.  It also provides the standards used in the preparation of these plans using Computer Aided Drafting and Design (CADD).

November 2013 revision package M 22-01.05 (pdf 2.8 MB)


Individual Chapters

  • Publication Number: M 22-31
  • Last Modified: November, 2013
  • Version: M 22-31.05
  • Manual Manager: John Klockenteger
  • Originators: Development Division, Design Support
  • # of Pages: 270
  • Subject:
  • Keywords: Washington State Department of Transportation Plans Preparation Manual, WSDOT Plans Preparation Manual (PPM)
  • Related Publications:

Plans Preparation Individual Chapters

Foreword (pdf 153 KB)

Comments (pdf 96 KB)
Contents
 (pdf 352 KB)


Division 1
 Right of Way Plans (pdf 8.1 MB)

Division 2 Survey Records (pdf 934 KB)

Division 3 Right of Way Plans Standard Symbols and Conventions 
               (pdf 281 KB)

Division 4 Contract Plans (pdf 7.1 MB)

Division 5 PS&E Standard Symbols and Conventions (pdf 418 KB)

Division 6 Contract Provisions (pdf 905 KB)

Division 7 Miscellaneous Contract Considerations (pdf 3.1 MB)

Division 8 Contract Estimate (pdf 410 KB)


Appendix 1
Structure Notes, Quantity Tabulation Sheets, and Sign   
                Specification Sheets (pdf 274 KB)

Appendix 2 PS&E Word User's Guide (pdf 292 KB)

Appendix 3 Transmittal Memorandums (pdf 261 KB)

Appendix 4 Acronyms and Abbreviations (pdf 297 KB)

Appendix 5 Addendum Preparation (pdf 1.1 MB)

Appendix 6 Determination of Contract Time (pdf 8.1 MB)

 

 


This abstract was last modified November 27, 2013