Linear Scheduling Evaluation and Best Practices Development: Phase I Report

Relevant literature review was conducted of best practices related to the use of linear scheduling method (LSM) for heavy civil construction projects. The comprehensive literature review revealed an additional need to understand how LSM could be best utilized for WSDOT, which includes conducting an investigation into off-the-shelf software programs that could be integrated with existing platforms that WSDOT is currently using.

Publication Date: 
Thursday, October 31, 2019
Publication Number: 
WA-RD 898.1
Last modified: 
03/04/2020 - 16:26
Authors: 
Amy Kim, Shuoqi Wang, Lysandra Medal, Hessam Sadatsafavi
Originator: 
Washington State Transportation Center (TRAC-UW)
Number of Pages: 
93
Subject: 
Construction scheduling, Literature reviews, Performance measurement, Evaluation, Best practices, Software packages.