SR 513 - Montlake Bridge - Mechanical Rehab, Deck Replacement & Joint Repair - Project map

Montlake Bridge closure and detour

The Montlake Bridge will close around-the-clock to vehicle traffic from Aug. 9 to Sept. 3. The bike and pedestrian pathways will remain open. During the second phase of work, slated to begin in September, crews will close the bridge to all traffic for up to five weekends. This includes closing the bridge to pedestrian and bicycle traffic as the bridge will be in the raised position.