PGSuper  3.1
Precast-prestressed Girder Bridges
CEB-FIP

Define parameters for concrete based on the CEB-FIP model.

The CEB-FIP model is only used for time-step analysis.

Item Description
Use time parameters from CEB-FIP model code. When checked, the parameters S and Beta SC are taken from the CEB-FIP model code. Otherwise a and Beta are input directly.
Cement Type Select a cement type. Used in determining S and Beta SC.
S A parameter used in CEB-FIP equation 2.1-54
Beta SC A parameter used in CEB-FIP equation 2.1-76