Modeling a Special Dead Load

A 10 kip overhead sign structure is placed at mid-span (station 2+33.66). The entire sign weight is assumed to be split evenly between the exterior girders on either side of the bridge. Hence we need to apply a 5 kip load at the mid-span of girder A. The load will be applied to the bridge after the deck and railing system have been constructed.

  1. Select Loads > Add Point Load...
  2. Enter the loading information
    Tutorial_General_Point_Load.png

User defined load information can be seen Loads View and the Girder View.

The Loads View provides a tabulated listing of all the user defined loads. You can sort, add, edit, and delete loads from the Loads View. Select Loads > Edit User Defined Loads to open the Loads View.

Tutorial_General_Loads_View.png

The Girder View provides a graphical representation of user defined loads applied to a particular girder. Loads can be added, edited, and deleted from the Girder View. Select View > Girder to open the Girder View.

Tutorial_General_Girder_View.png

Our bridge description is now complete. Our next step is to design the girders.