PGSuper
3.0
Precast-prestressed Girder Bridges
|
Define timing properties for deck casting
Item | Description |
---|---|
Age of deck concrete when continuity is achieved | Enter the age of the concrete when it has sufficient strength to be consider composite with the girders |
Curing Duration | Enter the duration of active curing of the deck concrete. Shrinkage strains are assumed to begin when curing ends. |