PGSuper
3.0
Precast-prestressed Girder Bridges
|
Controls the settings of the alignment plan view.
Item | Description |
---|---|
Draw Bridge | When checked, the bridge is drawn on the alignment |
North Up | When checked, orients the bridge so that north is up on the screen |