PGSuper
3.0
Precast-prestressed Girder Bridges
|
Define the bridge framing.
Item | Description |
---|---|
Grid | Define the bridge piers in this grid. Spans are located between the piers. More information about the grid is given below. |
[Insert Span] | Insert a span |
[Remove Span] | Remove the selected span. A pier can also be selected. |
[Insert Temporary Support] | Insert a temporary support into the bridge model |
[Remove Temporary Support] | Remove the selected temporary support |
[Layout by Span Lengths...] | Define pier locations by defining span lengths |
[Orient Piers] | Set all piers to the same orientation. |
The following items are defined in the layout grid
Item | Description |
---|---|
Station | Station of the Abutment/Pier Line |
Orientation | Orientation of the Abutment/Pier Line with the keyword NORMAL, a bearing, or a skew angle. |
Piers\Spans | Lists the span length between piers. Press the [Edit] button to edit the pier or span details. |