PGSplice
3.0
Precast-prestressed Spliced Girder Bridges
|
Insert a span and a pier into the bridge model.
Item | Description |
---|---|
Span Length | Length of the new span, measured along the horizontal alignment. |
Location | Select the location to insert the span. Location choices are before or after an abutment or pier. |
Create New Group | When checked, a new group is created, otherwise the span is added into an existion group |
Pier Construction | Select the event that corresponds to the construction of the new pier associated with this span. |